Loading...
HomeMy WebLinkAbout20171592 Ver 1_401 Application_20171217December 11, 2017 North Carolina Department of Environmental Quality Central Office 217 West Jones Street Raleigh, NC 27603 877-623-6748 f 5 9 2 Letter Re: Lakeside at Brawley Lakeside Park Attached to this letter, are three copies of the Site Development Construction Documents for the above referenced project. Also attached to this submittal, are signed PCN401 application letter and $240.00 application fee. I trust this satisfies all of your submittal requirements. If you need anything else, please do not hesitate to let me know and I will immediately provide that to you. We are anxious to begin this project immediately. Thank you, DT • Dennis C. Terry, RLA Landscape Architect dennisterrydesign@gmail.com 704-202-8260 ~— o C @[ _ DE=C 1 2 2017 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ® Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish & Wildlife Service North Carolina Ecological Services 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would Impact Essential Fish Habitat? NOAA Habitat Conservation 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation [] Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? National Register of Historic Places 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain termination? Survey of project site David J. Borreson l 12/09/2017 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature Is valid only if an authorization letter from the applicant isprovided.) Page 12 of 12 O�O� W ATFROG Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 12 PCN Form — Version 1.3 December 10, 2008 Version Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ❑ No For the record only ❑ Yes for Corps Permit: ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Lakeside on Brawley Park 2b. County: Iredell 2c. Nearest municipality / town: Mooresville, NC 061.rll 2d. Subdivision name: Lakeside on Brawley 2e. NCDOT only, T.I.P. or state project no: NA DEC 1 2 2017 3. Owner Information D _ q 3a. Name(s) on Recorded Deed: PORTOFINO MANAGEMENT CORP 3b. Deed Book and Page No. 2459 Page 407 3c. Responsible Party (for LLC if applicable): NA 3d. Street address: BRAWLEY SCHOOL RD Null 3e. City, state, zip: Mooresville, NC 28115 3f. Telephone no.: (404) 379-7157 3g. Fax no.: 3h. Email address: dborreson@peachtreeres.com Page 1 of 12 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ® Agent ❑ Other, specify: 4b. Name: Dennis Terry 4c. Business name (if applicable): Dennis Terry Design Inc. PA 4d. Street address: 160 Wesleyan Drive 4e. City, state, zip: McAdenville, NC 28101 4f. Telephone no.: (704) 202-8160 4g. Fax no.: 4h. Email address: dennisterrydesign@gmail.com 5. Agent/Consultant Information (if applicable) 5a. Name: Same as Above 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 12 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 4624226950.000 Latitude: 35.500702, Longitude: - 1 b. Site coordinates (in decimal degrees): 35.500702, (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 0.14 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Lake Norman proposed project: 2b. Water Quality Classification of nearest receiving water: Lake Norman 2c. River basin: map is available at Catawba http://h2o.enr.state.nc.us/admin/maps/ 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing site is a +/-0.14 acre lot in a Lake Norman cove at the end of Brawley School Road. Site is bisected through middle by the road bed of Brawley School Road which was abandoned when Lake Norman was constructed. Approximately 30% of the site turf grass, 20% is road bed and 50% is overgrown with low growing vegetation. 3b. List the total estimated acreage of all existing wetlands on the property: 0 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 streams 3d. Explain the purpose of the proposed project: The property owner plans to construct a small private park to serve as any outdoor amenity area for new houses constructed in the Lakeside on Brawley subdivision. The park will consist of a gravel area containing a fire pit and benches, a separate gravel lounging space with chairs, a timber arbor and a pathway to be paved over top of the existing Brawley School Road road bed. 3e. Describe the overall project in detail, including the type of equipment to be used: Construction of the park area will be accomplished using compact construction equipment to install erosion control measures and removed existing undergrowth. Amenity spaces will be constructed using compact construction equipment and hand tools. Page 3 of 12 PCN Form —Version 1.3 December 10, 2008 Version 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: Not Required ❑ Yes ® No ❑ Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? El Preliminary El Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 6. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 4 of 12 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 12 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number — Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ❑ PEI T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then com tete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ®No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 12 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar -Pamlico ❑ Other: Project is in which protected basin? ® Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason for Buffer Zone 1 impact Zone 2 impact Permanent (P) impact Stream name mitigation (square feet) (square feet) or Temporary required? T 131 ®P ❑ T Park Construction Lake Norman ® Nos 0 3,350 SF B2 ❑P❑T El Yes ❑ No B3 ❑P❑T El Yes ❑ No 6h. Total buffer impacts 3,350 SF 6i. Comments: Page 7 of 12 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Proposed impacts of this project are minimized through design primarily by designing the project around the existing Brawley School Road abandoned road bed. Other design measures to be implemented included silt fence to prevent erosion during construction, minimizing impervious areas and installing dense landscaping to rejuvenate natural areas. b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Proposed construction measures used to minimize impacts will be a combination of relying on mostly hand excavations supplemented with the use of small and light weight construction equipment such as Bobcats and Dingos. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: Page 8 of 12 PCN Form — Version 1.3 December 10, 2008 Version 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you will have to fill out this entire form — please contact the State for more information. ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 9 of 12 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 1,255 SF (21%) 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Site is under an acre, existing impervious area=1,864 which is greater than proposed imperviouse area=1,255 SF. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Iredell Co. ❑ Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: None 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: NONE 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ® No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 10 of 12 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No sewage will be generated by this project Page 11 of 12 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ® Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish & Wildlife Service North Carolina Ecological Services 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA Habitat Conservation 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? National Register of Historic Places 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Survey of project site Dennis Terry 12/09/2017 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 12 of 12 L 704-202-8160 /* www.dtdesigninc.com Planning * Zoning * Permitting f + Commercial 0 (t 10 z' Cover Sheet Lakeside on Brawley Brawley School Road Mooresville, NC 28117 DENNIS TERRY LANDSCAPE ARCHITECTURE dennisterr-,,designl,g),gmail.com 704-202-8160 /* www.dtdesigninc.com Planning * Zoning * Permitting f + Commercial 0 (t 10 Cover Sheet Lakeside on Brawley Brawley School Road Mooresville, NC 28117 DENNIS TERRY LANDSCAPE ARCHITECTURE dennisterr-,,designl,g),gmail.com 704-202-8160 160 Wesleyan Dr. McAdenvi Ile. NC 28101 www.dtdesigninc.com Planning * Zoning * Permitting + Environmental + Residential + Commercial w nQ Z -- "now T A 4% Ikk 4,* WIN 410 4% 0 41, 4*# 4** 0 0 4k# 41' 4f# 4% 41P A* % T-2 % f) /I -) C DIN N % --- % % C) 0 F) 4-- C4n J, 0 'n % 4*, % % % % % % 0 C) Con wo Op Oep 0000 wo Om No --�w so go Ow on MR MR on wn WE WE 00 so so wo wo wo 10 wo N, Ow wo Ile 00 00 to logo woos 00 Ow 00 so so 00 40 00 40 J 00 00 Existing Conditions Plan Z (7: Z Lakeside on Brawley Brawley School Road z Mooresville, NC 28117 TIE�RRY- ma, LANDSCAPE ARCHITECTURE derifil sterry des igwq';grnai I corn 704-202-8160 160 Wesleyan Dr. McAdenville,SIC' 28101 www.dtdesigninc.com Planning *Zoning* Permitting *Environmental *Residential *Commercial j j 0 M ID (D Ln(1) C 07 -< 3 . TD 0 ;:� (D 0, ID (D 0 0 (D On 0 0 w -9 Or (D W 0 —o 0) :,, . C OL '0 CL 4� _0ID ID C' (D :1 3D COD C t7 =]7 oJ)- 1p (D ( a C, C: U) Cr 0 U(O zr (D (D In 0 -0 C) ID ID w ID < 0_ 0 .n 0 W En:E CL Z 0 01 0 (D =3 '0 ! 0 ;12D > (D (D 1< (D (n (D �7 0 I Demolition Plan 0 Z Lakeside on Brawley Brawley School Road z Mooresville, NC 28117 rn p p M x M -u Om 8x M M 0-6 M Z M Cu 0 z ri ?: --4 C W 2: g O> M M rn 3 =A x M x K 0 in 0— 0 -u z z I M r =j =1 V) > Oz Z Z 60 M q > M 0 z (n r - z z ;u k 0 > z z 0 > M z CD 0 M z M OD 0 ;V M 0 _0 M M M M 0 kn 0 0 r4 0 ;u C M 0 0 K) z C z (n 0 ;u 58 z 0 C 0 0 0 0 > z =1 C z M > ;u 0 ;V :d M 0 > 3. z 7K Ods b ✓ y s�� 1 LANDSCAPE ARCHITECTURE deniiisterrydesign,'L&,gmaii.com 704-202-8160 160 Wesleyan Dr, McAdenville,NC 28101 www.dtdesigninc,corn Planning + Zoning + Permitting * Environmental * Residential + Commercial :3 __I 0 -0 0 3< �: (D CD �O �O 0 0 0_ C, (4D 0 (D b- ID . 0 3 ID 3 'D CD 0 0 06 — CT enS P 0 SC' F' ID ID OM (D 1< :3 ID "15, 0 ii0 =0,- w g, w 0 1 (D M (D < CL V) i * - :3 0 0 �F �F - Cn 0 '0 CT 0 (D > (D = :D =T (D (D (D Z(D (D 1< z 0- 1< (D — (n M -3 Cfi 0 > L I Demolition Plan 0 Z Lakeside on Brawley Brawley School Road z Mooresville, NC 28117 rn p p M x M -u Om 8x M M 0-6 M Z M Cu 0 z ri ?: --4 C W 2: g O> M M rn 3 =A x M x K 0 in 0— 0 -u z z I M r =j =1 V) > Oz Z Z 60 M q > M 0 z (n r - z z ;u k 0 > z z 0 > M z CD 0 M z M OD 0 ;V M 0 _0 M M M M 0 kn 0 0 r4 0 ;u C M 0 0 K) z C z (n 0 ;u 58 z 0 C 0 0 0 0 > z =1 C z M > ;u 0 ;V :d M 0 > 3. z 7K Ods b ✓ y s�� 1 LANDSCAPE ARCHITECTURE deniiisterrydesign,'L&,gmaii.com 704-202-8160 160 Wesleyan Dr, McAdenville,NC 28101 www.dtdesigninc,corn Planning + Zoning + Permitting * Environmental * Residential + Commercial :3 __I 0 -0 0 3< �: (D CD �O �O 0 0 0_ C, (4D 0 (D b- ID . 0 3 ID 3 'D CD 0 0 06 — CT enS P 0 SC' F' ID ID OM (D 1< :3 ID "15, 0 ii0 =0,- w g, w 0 1 (D M (D < CL V) i * - :3 0 0 �F �F - Cn 0 '0 CT 0 (D > (D = :D =T (D (D (D Z(D (D 1< z 0- 1< (D — (n Ll 3 p T Site Layout Plan Lakeside on Brawley Brawley School Road Mooresville, NC 28117 — — — p p 71 ® ® p �4 p p z 1� a) U-) MM 4 CD 0 rT1 0 35 CA 0 0 w M P rri 0 0) , p > 0 > X 2 > 55 CA 0 m z Z M 0 33 > M :< 0 LVI 0 x M M T 0 m > — U) 0 z M r, 1 M > 0 GO M M 0 M CO - 0, M 0 0 Z rn M T CA M M -4 > 00 0 01 (A z (A --I 0 6.. M M M 0 M-1 -, 0 ' L)i 0 p > > ?" 71 M 0 rn F 0 p C) 0 rn > :9 z (n M M M 0 > :r. 1 0 M p 0 . F4 A rn r7!) C (A > > r - rn M M Site Layout Plan Lakeside on Brawley Brawley School Road Mooresville, NC 28117 — — — p p 71 ® ® p �4 p p a) U-) MM 4 CD 0 rT1 0 35 CA 0 0 w M P rri 0 0) , p > 0 > X 2 > 55 CA 0 m z Z M 0 33 > M :< 0 LVI 0 Z °A.. 0 0 0 x M M T 0 m > — U) 0 z M r, 1 M > 0 GO M M 0 M CO - 0, M 0 0 Z rn M T CA M M -4 > 00 0 0 0 z M z 0 rn M M M M 8 z (A --I 0 6.. M M M 0 M-1 -, 0 ' L)i 0 p > > ?" 71 M 0 rn F 0 p C) 0 rn > :9 z (n M M M 0 > :r. 1 0 M p 0 . F4 A rn r7!) C (A > > r - rn M M 0 0 0 --q 0 0 p 4 X LANDSCAPE ARCHFIFECTURE denn 1 sterrN, des lgw,\c�grnai Lcorn 704-202-8160 160 Wesleyan Dr. McAdenville, NC 28101 www,dtdesigninc.com Planning * Zoning + Permitting + Environmental + Residential * Commercial E� (�DD ( =T Ti 0 to 0 T 3 < 0 — CD 0- U-, co cr T 3 0— D (D =, CD0 -(D0 0 0 — 0 w - 0 1 - 1 (f) 0 (n D En a 0 ca 0) u. in -02 10= (D 1< = �5 — cn (D (D Q) CL 5 0 0 ID IaD (D w � (0 =OF ((AD n (D 9 T, 4- -I -oX (OD (DD M (<D 0- �Q Z (n 7 :� -9 (0 Q� (D 0 CL (n j -0 73 0 (D Fn -< (D ID D (D NOw jo 7 z 4 Cf) r f r r gds r z I ss��r®fGrad*ng Plan� r� _. 0 0 01 Lakeside on Brawley �.a , ���t���®� ra ley School Road Mooresville, NC "2. 1 17 I den nisterrydesign('gmail.com 704-202-8160 160 Wesleyan Dr. McAdenville, N('28101 www•dtdesignlnc.co PlanningZoning Permitting EnvironmentalResidential Commercial 0 cp -^ �@ ,-" @ %�D i30 to _30 �0 @� � @ 0 © O -,0 t9 (n O cC] 0 ° mo w 0 � U 0 Q in ca en_ D� C} C (s 0 'E Co' fes® Ti -j 0- CD W �(OD L n. 3 a � w CD cn zyO 0 '-�0��` CL LT 0 CD FO � (D (D 4 Cf) I ss��r®fGrad*ng Plan� r� _. 0 0 01 Lakeside on Brawley �.a , ���t���®� ra ley School Road Mooresville, NC "2. 1 17 I den nisterrydesign('gmail.com 704-202-8160 160 Wesleyan Dr. McAdenville, N('28101 www•dtdesignlnc.co PlanningZoning Permitting EnvironmentalResidential Commercial 0 cp -^ �@ ,-" @ %�D i30 to _30 �0 @� � @ 0 © O -,0 t9 (n O cC] 0 ° mo w 0 � U 0 Q in ca en_ D� C} C (s 0 'E Co' fes® Ti -j 0- CD W �(OD L n. 3 a � w CD cn zyO 0 '-�0��` CL LT 0 CD FO � (D (D 12" 24" z m m G) m z 0 0 m z 0 to 1 0 8 > Z Z r r. > 0 0 r - m X, F - > > r- rrl xxx�' r F m m b 0 m > to WX Z:tlz "j•m m sni m m 0 0 00 z 0 > 6') z ul --i m 9? C- _10 gr -z ago 0 Oz CA 0 WE T Z > z --A Z rn rn 4�, M Q z 0 X r - mo 112 z 0 0 m z 0 to 1 0 8 > Z Z r r. > 0 0 r - m > r7l z z F - > > m 0 L C m -00 r U) 2 m 0 C) 20M 0 —SH PLAN 20 > 0 rn > m > r—M--i D r -l" (n m 70 !R m 9 0 r— C 00 CD X CO c- oo> E z zo i M 1 --4 \ i '% lip gig Al z < Ica 0 rm, z &E POST� r- F-" �33,_14W1111200 Pos"�' U) > FILTER FABRIC OD - .,9 fh t,a K) 0 0 U) z (n MWOOK > > MO>* 0 0 z C z SIR 0 ZOMO zco�j> T 0 K > 0 m W 0 0 z z 0 0 Z Z > > z F- M ZA 5 5E M (n -TI -n M M — COOmm m 00 -nmcm Omm 70 -0 --j ' I m Im 9 r 0 Z>OZK 0 x Oxzm z m V) M Z r- 1 J2 mm rn m mm m Rmmoc m (1) 0 (n > 0 r- 0 V > X > m z r- __, m M U) rri 0 CD > 0 X rri m m r - z m m : z C jj ;0 A (D 0 450>A® > rri 0 0 C) 0 0 ;0 0 00 C >C > 9: >;O r-1 Ln > (tib —z C: 0 M mm - r. U) UD mox >MO—> m m 0 z OC > > ;u > r-. 3 z r- -n 0 U) r- ;u - m rrI X > A > ;0 > ;C) 0 CD 0 -n r - m > 0 0 0 > 0 m X m: CD 0 A m Fm mm Ow w --j -0-1 mK z m'P >z x 2 (/) -00 r- rr' F > m m ;0 0 (n m rf, rn A Z > (n 21 r- --1 -0 > 2 zcnzmz m r, > > C) Z > LA m z rm 0 ;0>>>m U) MZ80 0 rim rrl > U);u m > -q C- m 0 > M U) ZK =j 0 rrl FIF 9: CC) --19 00 > 50M 0 m 0 m w 0 > m L4 z 0 ;0 m 0 -0' U) m > rTj - Ox Zn< r- < -m-1 0 -'j < m G) Z z m Boo > z r- z U) > m Z r- 0 En 0 112 q -------- - 02 m C 0 9: m _q 0 A 0 OD O>Z Z > z C: m z0 AwwWo Om m g2 0 z z > r -;u 0 z r -4 > m 0 m>O M m LO 0 Fri V) Dw mr-C z 0 00 :r m 0 > 0 z > 00 F CO z ;0 F z 0 0 w m Site Details Al, 1�1z- z 0 *de on Brawley (A 0 Lakesi Brawley School Road Mooresville, NC 28117 (D (:D3"9 -.0 u' 3 -'0 0 (D 0- T (D 0 0 0 cn cn o --3 o- (n 0 to Ln. 0- 0 2, a T (D 3' -::, 0 CD (D IOD W _ (') = 0 0 ( ' D CD J N) CD ID 0 CD (0 =y- CD - C -D .sw ON 0 (D (D (0cn w =70 0 a (n CL 0 0 (n q :3 CD ;1 5 5 (D w Z' (D :2 (D -3 V) >> Go - > Z Z r r. > 0 > r7l z z F - > > r- rrl r F m m b 0 m > X> V) m 0 r- Z:tlz "j•m m sni m m 0 0 00 � r- 0 -111 0 > z ul --i m 9? C- .(nz Z 0 Z X 0 > m Z Z > z --A Ln 4�, M m z 0 X r - mo 0 0 200 0 --1 (Z) 0 0 MX 0 m;u V-1 ZO G) M z m 0 L C m -00 r U) 2 m 0 C) 20M 0 —SH PLAN 20 > 0 rn > m > r—M--i D r -l" (n m 70 !R m 9 0 r— C 00 CD X CO c- oo> E z zo i M 1 --4 \ i '% lip gig Al z < Ica 0 rm, z &E POST� r- F-" �33,_14W1111200 Pos"�' U) > FILTER FABRIC OD - .,9 fh t,a K) 0 0 U) z (n MWOOK > > MO>* 0 0 z C z SIR 0 ZOMO zco�j> T 0 K > 0 m W 0 0 z z 0 0 Z Z > > z F- M ZA 5 5E M (n -TI -n M M — COOmm m 00 -nmcm Omm 70 -0 --j ' I m Im 9 r 0 Z>OZK 0 x Oxzm z m V) M Z r- 1 J2 mm rn m mm m Rmmoc m (1) 0 (n > 0 r- 0 V > X > m z r- __, m M U) rri 0 CD > 0 X rri m m r - z m m : z C jj ;0 A (D 0 450>A® > rri 0 0 C) 0 0 ;0 0 00 C >C > 9: >;O r-1 Ln > (tib —z C: 0 M mm - r. U) UD mox >MO—> m m 0 z OC > > ;u > r-. 3 z r- -n 0 U) r- ;u - m rrI X > A > ;0 > ;C) 0 CD 0 -n r - m > 0 0 0 > 0 m X m: CD 0 A m Fm mm Ow w --j -0-1 mK z m'P >z x 2 (/) -00 r- rr' F > m m ;0 0 (n m rf, rn A Z > (n 21 r- --1 -0 > 2 zcnzmz m r, > > C) Z > LA m z rm 0 ;0>>>m U) MZ80 0 rim rrl > U);u m > -q C- m 0 > M U) ZK =j 0 rrl FIF 9: CC) --19 00 > 50M 0 m 0 m w 0 > m L4 z 0 ;0 m 0 -0' U) m > rTj - Ox Zn< r- < -m-1 0 -'j < m G) Z z m Boo > z r- z U) > m Z r- 0 En 0 112 q -------- - 02 m C 0 9: m _q 0 A 0 OD O>Z Z > z C: m z0 AwwWo Om m g2 0 z z > r -;u 0 z r -4 > m 0 m>O M m LO 0 Fri V) Dw mr-C z 0 00 :r m 0 > 0 z > 00 F CO z ;0 F z 0 0 w m Site Details Al, 1�1z- z 0 *de on Brawley (A 0 Lakesi Brawley School Road Mooresville, NC 28117 (D (:D3"9 -.0 u' 3 -'0 0 (D 0- T (D 0 0 0 cn cn o --3 o- (n 0 to Ln. 0- 0 2, a T (D 3' -::, 0 CD (D IOD W _ (') = 0 0 ( ' D CD J N) CD ID 0 CD (0 =y- CD - C -D .sw ON 0 (D (D (0cn w =70 0 a (n CL 0 0 (n q :3 CD ;1 5 5 (D w Z' (D :2 (D -3 I 8 2 " ---d 73 > �;U OF�> 0 F71 F— ---i F- 0 0 A 0 7- z b � x 0* > @ > —< M F— 0 11WO F— cr 0 0 Le QD - >r- ---i M f 4a > 0 CI) cl) > > > 0 M > M > CA -TI 0 CO ;;U FTI 0 > M OQO (3) > > FT1 Ln 0 (JI G) 0 1 0 x x M M M 00 00 CO CD r7-1 i---2 0 M -T1 0 -Tj z 0 0a 0 0 0 z M h 0 G-) -U CD > 4�- M 0 F C/) -TI 00 0— r— 0 CC) M 0 0 M FT -I < 8 2 " ---d 73 > �;U OF�> 0 F71 F— ---i F- 0 0 A 0 7- z zttz � x 0* > @ > —< M F— 0 11WO F— cr 0 ;�U QD - >r- ---i M 0 > 0 CI) cl) > > > 0 M > M > CA -TI 0 0 0 r\j M M FT1 FTI 0 (JI Z FTI M —A ---j M M CU 00 z M M 0 -Tj z F- -90 0 F- 0 0 0 -U 0 F C/) -TI 0— r— 0 CC) M 0 M M FT -I < CO M 0 M M 0) 0 0 > 0 0 0 co M C M M < -- C) �;U F- C/) 0 U) 0 z Z M K k 0 M A", U) > F- 0 0 G) z > 0 M 00 0 0 M p M r- M < M 8 2 " ---d z G-) �;U OF�> 0 0 % ---i F- R:� 0 A 0 > z zttz � x 0* > @ Fr F-7 —< --j F— 0 11WO F— cr 0 ;�U QD - >r- ---i M 0 > 0 CI) cl) > > > 0 > M > CA K 0 8 2 " Monument Sign. D etails ---d z G-) �;U 0 0 % ---i F- CU 0 A 0 0 > z zttz Lakeside on Brawley x FTI > @ Fr F-7 —< --j M Fq 11WO co cr 0 Brawley School Road MF- >r- 0 0 z Mooresville, NC X8117 Z F- > > F— > M > V) K 0 0 N� r\j M M 0 --4 > FTI M 0-) 0 M CU 00 M M M T1 -Tj z F- -90 0 F- 0 -U 0 --� 0— r— 0 CC) M 0 M M FT -I < CO M FTI M 0) 0 F— < 0 0 co M 0 N M < -- C) �;U F- U) 0 z Z M K 00 0 M M U) F- 0 G) x > 0 M 00 0 0 M M r- M < M Monument Sign. D etails 8--!//4" ---d z G-) �;U 0 0 % ---i F- CU 0 A 0 0 > z zttz Lakeside on Brawley x FTI > @ Fr F-7 —< --j M Fq 11WO co cr 0 Brawley School Road > CC) >r- 0 0 z Mooresville, NC X8117 8--!//4" ---d 4�- G-) �;U 0 —< > ---i F- CU 0 x 0 > OQO zttz M x FTI > @ Fr F-7 —< --j M Fq U) co 00 M > > CC) >r- 0 0 --, 0 Z 0-) -TI F— F- M > 0 CU 0 0 N� r\j M M 0 --4 > FTI M 0-) 0 M CU 00 M M M T1 -Tj z F- -90 0 F- 0 -U 0 --� 0— r— 0 CC) M 0 M M FT -I < FTI M M < Fq U) co = --i M 0 C) r- 8--!//4" U), ---d Cz G-) F -'- 1 0 —< > ---i F- CU 0 Z 0 M zttz Cm x FTI > @ Fr F-7 —< --j M Fq 00 co 00 M > > CC) >r- 0 0 --, M Z 0-) G F— F- M > 0 CU 0 > N� r\j M 0 M > U), ---d Cz G-) F -'- 1 0 —< > ---i Tj CU 0 Z 0 FTI c Cm > FTI > @ Fr F-7 —< --j M Fq M -T, CC) M CD > CC) >r- 0 z > M Cf) r- F— F- 0 > 0 0 0 > M C M > M 0-) > M 0 00 M M rQ C-0 0 M z M U) F- M U) -U r— 0 CC) M 0 M M FT -I < FTI M M < Fq co M U), ---d Cz F -'- 1 0 —< > ---i Tj CU Fr Z 0 FTI Cm > FTI > @ Fr F-7 —< F— F- C-) Fq M -T, > M F- > CC) >r- Cf) r- U) 0 0 > 0 0 > M C M > M 0-) > M 0 00 CC) rQ C-0 0 M z M U) > M U) ERRY '414 LANDSCAPE ARCHITECTURE dennlsterrydesign' il.corn 704-202-8160 160 Wesleyan Dr. Mw cAdenville,NC28101 wwAdesigninc.com ,grnal Planning * Zoning + Permitting * Environmental * Residential * Commercial 0 C: FTI CU Fr F-7 Fq U) 9 CO M F- > F- >r- r- U) M (D C/) 0 0 M C M > M > M 00 CC) M M z M U) > M U) 0 M 0 M FT -I < FTI M Z Fq M -F1 C) r- F- U) 0 z Z M K 00 0 M M F- ERRY '414 LANDSCAPE ARCHITECTURE dennlsterrydesign' il.corn 704-202-8160 160 Wesleyan Dr. Mw cAdenville,NC28101 wwAdesigninc.com ,grnal Planning * Zoning + Permitting * Environmental * Residential * Commercial I I 0 4"-6" z LandscapePlan DENNIS TERRY Lakeside on Brawley Brawley School Road Mooresville, NC 28117 detinisterr-,,design(c,)gi-naii,com i 11 704-202-8160 160 Wesleyan Dr. McAdenville,IAC 28101 www.dtdesigninc.com Planning * Zoning * Z * Environmental + Residential z Z� 0 L� :0 0 LandscapePlan DENNIS TERRY Lakeside on Brawley Brawley School Road Mooresville, NC 28117 detinisterr-,,design(c,)gi-naii,com 704-202-8160 160 Wesleyan Dr. McAdenville,IAC 28101 www.dtdesigninc.com Planning * Zoning * Permitting * Environmental + Residential + Commercial jg @ -9 -J, ID --9 0 0 Cn o 0 0 CD 0 rG 0 3 (OD 'S cD 3 SL ID 0 (D "T w 0— — —50 CL (0 C: 0- Cn -0 'D (D ID a D- @ 0 (D 4 C7 00 :E ID7 0— ,T)4i to 0 (n rl_ j) cn ,„-a n (O 47 'D ID, (D < = W 0 TCDD 0 Q 0,- 0 0CD(n Fn > (D 1 ;7;� N