HomeMy WebLinkAboutWilliamston Subdivision - Williamston Calcs_111817Williamston Subdivision is a proposed 9 lot residential development located off SR 1627 (New Salem Road) approximately 600 feet south of SR 2717 (Polk Mountain Road). The site is in the Yadkin River Basin and drains to Brandon Branch. The site is in Union County Zoning District. The development is proposed as "low density" with a maximum built upon area of 24%. The street cross-sections are shoulder and ditch. This combined with natural swales leaving the site shall provide the required conveyances. The maximum built upon area per lot shall not exceed 9,000 sf for all 9 lots. EROSION CONTROL CALCULATIONS Job: Williamston Subdivision Job No. Date Sheet Subject: REVISED TEMPORARY SEDIMENT TRAPS By Chk By Runoff Intensity Coeff. Tc I(10) TRAP C (min) (in/hr) ST-1 0.60 5 7.6 COMPOSITE RUNOFF "C" BASED ON C(DIST)=0.60 & C(UN-DIST)=0.33 DISCHARGE DETERMINED USING RATIONAL METHOD (Q=CIA) WEIR REQ'D DESIGN PROV'D REQ'D PROV'D WEIR BOTTOM LNTH (FT) 1580 Q(10) 1596 2880 3192 526.0 523.5 28 X 57 X 2.5 4 SURFACE AREA REQUIRED (SQ FT)= Q*435 sf/ac VOLUME REQUIRED (CU FT)= 3600 cubic feet (Area disturbed) VOLUMES PROVIDED BASED ON 2:1 SIDE SLOPES OF TRAP TRAP ELEV'S DIMENSIONS ST-1 DISTURBED 0.80 0.80 (Ac) 10 YEARDRAINAGE AREA PEAKAREA (Ac) 11/18/2017 KEH TRAP 3.63 Q(10) cfs SEDIMENT VOLUME (CF)SURFACE AREA (SF) @ TOP OF WEIR DITCH & DIVERSION CALCULATIONS Job Name Williamston Subdivision Job No. Date 10/20/2017 Sheet Subject DIVERSION CHANNEL SUMMARY SHEET By KEH Chk By <4.5f/s <1.0'Design Diversion Drainage Average Bottom Side Slope Velocity Flow Depth for Top Width Channel Area (Ac) Slope (%) Width(ft) ft/ft ft/s Depth (ft) Liner (ft)T (ft) RD-1(9.0%) 0.93 9.00 0.75 3.5 3.85 0.42 1.00 7.75 RD-2(9.0%) 0.26 9.00 0.50 3.5 2.79 0.25 1.00 7.50 RD-3(8.0%) 0.40 8.00 0.50 3.5 2.99 0.32 1.00 7.50 RD-4(8.0%) 0.32 8.00 0.50 3.5 2.82 0.29 1.00 7.50 PD (5.0%) 0.80 5.00 0.50 3 3.09 0.50 1.00 6.50 SYNTHETIC MAT" TO BE NAG C125 OR EQUAL, STAPLE PATTERN "D" STRAW WITH NET" TO BE NAG S-75 OR EQUAL, STAPLE PATTERN "A" Liner SYNTHETIC MAT Temporary SYNTHETIC MAT SYNTHETIC MAT SYNTHETIC MAT SYNTHETIC MAT Job Name Williamston Subdivison Job No. Date 10/20/2017 Sheet Subject ROADSIDE DITCHES By KEH Chk By DETERMINE TEMPORARY LINER APPROACH: Channel Design calculated using NORMAL DEPTH procedure. Velocity is checked to see if Temporary Liner is required. If required, 2 year storm is used for design. Shear Stress is then compared to Permissable Shear Stress allowed. PROPOSED CHANNEL:RD-1(9.0%) DRAINAGE AREA: 0.93 MAX SHEAR Td allowed: 2.00 AVERAGE SLOPE: 9.00 % VELOCITY CHECK of Channel Design using Manning of 0.02 (Bare Earth) Calculated VELOCITY of 7.02 is GREATER THAN 2 Feet per second TEMPORARY LINER REQUIRED (USING 2 YEAR STORM FOR DESIGN) PROPOSED LINER:SYNTHETIC MAT *MANNINGS (n) of 0.036 used for design Calculated shear of 1.89 is less than the Permissable Shear*** of 2 Therefore can be used as a temporary liner for RD-1(9.0%) *Mannings Coefficient obtained from Table 8.05e **RATIONAL METHOD USED TO DETERMINE DISCHARGE Q=CIA Where C= 0.5 I=7.6 in/hr for channel design,Tc=5.0 min I=5.94 in/hr for 2 year storm REF: NOAA Atlas 14 Data ***Permissable Shear Stress Td obtained from Table 8.05g ****Td=yds Where T=Shear Stress(lb/sq ft), y=unit wt of water, (62.4lb/cubic ft), d=flow depth(ft), s=slope(ft/ft) Tables From the NC Erosion & Sediment Control Manual (unless otherwise noted) v (f/s) 4.27 (Td) **** 1.89 VELOCITYDISCHARGE**Calculated Shear Q (cfs) 2.76 SYNTHETIC MAT d (ft) DEPTH 0.34 Job Name Williamston Subdivison Job No. Date 10/20/2017 Sheet Subject ROADSIDE DITCHES By KEH Chk By DETERMINE GRASS LINER PROPOSED GRASS LINER:TALL FESCUE Use Retardence Class D APPROACH: Channel Design calculated using NORMAL DEPTH procedure. Calculated VELOCITY is compared to MAXIMUM VELOCITY allowed for liner. Calculated VR is then compared to Fig. 8.05c to determine if design is within range for prop.RETARDENCE CLASS PROPOSED CHANNEL:RD-1(9.0%) AVERAGE SLOPE: 9.00 % MAX VELOCITY allowed: 4.00 feet/sec MANNING'S (n) used: 0.045 MAX VR allowed: 2.2 DISCHARGE FLOW WETTED CRITICAL DEPTH Side Slope Bottom VELOCITY Q=CIA AREA PERIMETER DEPTH FROUDE (d) ft ft/ft Width (ft) V (f/s) Q(10) (cfs) (sq ft) (ft) (ft) No. Fr VR 0.42 3.5 0.75 3.85 3.53 0.92 3.78 0.48 1.36 0.94 FLOW IS SUBCRITICAL VELOCITY CHECK Calculated velocity of 3.85 feet/sec is less than permissable velocity of 4.00 feet/sec VR CHECK 0.94 is less than the maximum allowable VR of 2.2 Therefore TALL FESCUE can be used as a grass liner for RD-1(9.0%) *Permissable Velocity Obtained from Table 8.05a **VR = Velocity * Hydraulic Radius = Velocity * Flow Area/Wetted Perimeter Tables From the NC Erosion & Sediment Control Manual (unless otherwise noted) Calculated VR Job Name Williamston Subdivison Job No. Date 10/20/2017 Sheet Subject ROADSIDE DITCHES By KEH Chk By DETERMINE TEMPORARY LINER APPROACH: Channel Design calculated using NORMAL DEPTH procedure. Velocity is checked to see if Temporary Liner is required. If required, 2 year storm is used for design. Shear Stress is then compared to Permissable Shear Stress allowed. PROPOSED CHANNEL:RD-2(9.0%) DRAINAGE AREA: 0.26 Acres MAX SHEAR Td allowed: 2.00 AVERAGE SLOPE: 9.00 % VELOCITY CHECK of Channel Design using Manning of 0.02 (Bare Earth) Calculated VELOCITY of 5.08 is GREATER THAN 2 Feet per second TEMPORARY LINER REQUIRED (USING 2 YEAR STORM FOR DESIGN) PROPOSED LINER:SYNTHETIC MAT *MANNINGS (n) of 0.036 used for design Calculated shear of 1.15 is less than the Permissable Shear*** of 2 Therefore can be used as a temporary liner for RD-2(9.0%) *Mannings Coefficient obtained from Table 8.05e **RATIONAL METHOD USED TO DETERMINE DISCHARGE Q=CIA Where C= 0.5 I=7.6 in/hr for channel design,Tc=5 min I=5.94 in/hr for 2 year storm REF: NOAA Atlas 14 Data ***Permissable Shear Stress Td obtained from Table 8.05g ****Td=yds Where T=Shear Stress(lb/sq ft), y=unit wt of water, (62.4lb/cubic ft), d=flow depth(ft), s=slope(ft/ft) Tables From the NC Erosion & Sediment Control Manual (unless otherwise noted) DISCHARGE** DEPTH Q (cfs) d (ft) v (f/s) SYNTHETIC MAT VELOCITY Calculated Shear 1.15 (Td) **** 0.77 0.21 3.09 Job Name Williamston Subdivison Job No. Date 10/20/2017 Sheet Subject ROADSIDE DITCHES By KEH Chk By DETERMINE GRASS LINER PROPOSED GRASS LINER:TALL FESCUE Use Retardence Class D APPROACH: Channel Design calculated using NORMAL DEPTH procedure. Calculated VELOCITY is compared to MAXIMUM VELOCITY allowed for liner. Calculated VR is then compared to Fig. 8.05c to determine if design is within range for prop.RETARDENCE CLASS PROPOSED CHANNEL:RD-2(9.0%) AVERAGE SLOPE: 9.00 % MAX VELOCITY allowed: 4.00 feet/sec MANNING'S (n) used: 0.045 MAX VR allowed: 2.2 DISCHARGE FLOW WETTED CRITICAL DEPTH Side Slope Bottom VELOCITY Q=CIA AREA PERIMETER DEPTH FROUDE (d) ft ft/ft Width (ft) V (f/s) Q(10) (cfs) (sq ft) (ft) (ft) No. Fr VR 0.26 3.5 0.5 2.79 0.99 0.35 2.35 0.28 1.26 0.42 FLOW IS SUBCRITICAL VELOCITY CHECK Calculated velocity of 2.79 feet/sec is less than permissable velocity of 4.00 feet/sec VR CHECK 0.42 is less than the maximum allowable VR of 2.2 Therefore TALL FESCUE can be used as a grass liner for RD-2(9.0%) *Permissable Velocity Obtained from Table 8.05a **VR = Velocity * Hydraulic Radius = Velocity * Flow Area/Wetted Perimeter Tables From the NC Erosion & Sediment Control Manual (unless otherwise noted) Calculated VR Job Name Williamston Subdivison Job No. Date 10/20/2017 Sheet Subject ROADSIDE DITCHES By KEH Chk By DETERMINE TEMPORARY LINER APPROACH: Channel Design calculated using NORMAL DEPTH procedure. Velocity is checked to see if Temporary Liner is required. If required, 2 year storm is used for design. Shear Stress is then compared to Permissable Shear Stress allowed. PROPOSED CHANNEL:RD-3(8.0%) DRAINAGE AREA: 0.40 Acres MAX SHEAR Td allowed: 2.00 AVERAGE SLOPE: 8.00 % VELOCITY CHECK of Channel Design using Manning of 0.02 (Bare Earth) Calculated VELOCITY of 5.46 is GREATER THAN 2 Feet per second TEMPORARY LINER REQUIRED (USING 2 YEAR STORM FOR DESIGN) PROPOSED LINER:SYNTHETIC MAT *MANNINGS (n) of 0.036 used for design Calculated shear of 1.28 is less than the Permissable Shear*** of 2 Therefore can be used as a temporary liner for RD-3(8.0%) *Mannings Coefficient obtained from Table 8.05e **RATIONAL METHOD USED TO DETERMINE DISCHARGE Q=CIA Where C= 0.5 I=7.6 in/hr for channel design,Tc=5 min I=5.94 in/hr for 2 year storm REF: NOAA Atlas 14 Data ***Permissable Shear Stress Td obtained from Table 8.05g ****Td=yds Where T=Shear Stress(lb/sq ft), y=unit wt of water, (62.4lb/cubic ft), d=flow depth(ft), s=slope(ft/ft) Tables From the NC Erosion & Sediment Control Manual (unless otherwise noted) SYNTHETIC MAT 1.19 v (f/s) 0.26 3.31 1.28 d (ft)Q (cfs)(Td) **** Calculated ShearDISCHARGE** DEPTH VELOCITY Job Name Williamston Subdivison Job No. Date 10/20/2017 Sheet Subject ROADSIDE DITCHES By KEH Chk By DETERMINE GRASS LINER PROPOSED GRASS LINER:TALL FESCUE Use Retardence Class D APPROACH: Channel Design calculated using NORMAL DEPTH procedure. Calculated VELOCITY is compared to MAXIMUM VELOCITY allowed for liner. Calculated VR is then compared to Fig. 8.05c to determine if design is within range for prop.RETARDENCE CLASS PROPOSED CHANNEL:RD-3(8.0%) AVERAGE SLOPE: 8.00 % MAX VELOCITY allowed: 4.00 feet/sec MANNING'S (n) used: 0.045 MAX VR allowed: 2.2 DISCHARGE FLOW WETTED CRITICAL DEPTH Side Slope Bottom VELOCITY Q=CIA AREA PERIMETER DEPTH FROUDE (d) ft ft/ft Width (ft) V (f/s) Q(10) (cfs) (sq ft) (ft) (ft) No. Fr VR 0.32 3.5 0.5 2.99 1.52 0.51 2.80 0.34 1.22 0.54 FLOW IS SUBCRITICAL VELOCITY CHECK Calculated velocity of 2.99 feet/sec is less than permissable velocity of 4.00 feet/sec VR CHECK 0.54 is less than the maximum allowable VR of 2.2 Therefore TALL FESCUE can be used as a grass liner for RD-3(8.0%) *Permissable Velocity Obtained from Table 8.05a **VR = Velocity * Hydraulic Radius = Velocity * Flow Area/Wetted Perimeter Tables From the NC Erosion & Sediment Control Manual (unless otherwise noted) Calculated VR Job Name Williamston Subdivison Job No. Date 10/20/2017 Sheet Subject ROADSIDE DITCHES By KEH Chk By DETERMINE TEMPORARY LINER APPROACH: Channel Design calculated using NORMAL DEPTH procedure. Velocity is checked to see if Temporary Liner is required. If required, 2 year storm is used for design. Shear Stress is then compared to Permissable Shear Stress allowed. PROPOSED CHANNEL:RD-4(8.0%) DRAINAGE AREA: 0.32 Acres MAX SHEAR Td allowed: 2.00 AVERAGE SLOPE: 8.00 % VELOCITY CHECK of Channel Design using Manning of 0.02 (Bare Earth) Calculated VELOCITY of 5.15 is GREATER THAN 2 Feet per second TEMPORARY LINER REQUIRED (USING 2 YEAR STORM FOR DESIGN) PROPOSED LINER:SYNTHETIC MAT *MANNINGS (n) of 0.036 used for design Calculated shear of 1.16 is less than the Permissable Shear*** of 2 Therefore can be used as a temporary liner for RD-4(8.0%) *Mannings Coefficient obtained from Table 8.05e **RATIONAL METHOD USED TO DETERMINE DISCHARGE Q=CIA Where C= 0.5 I=7.6 in/hr for channel design,Tc=5 min I=5.94 in/hr for 2 year storm REF: NOAA Atlas 14 Data ***Permissable Shear Stress Td obtained from Table 8.05g ****Td=yds Where T=Shear Stress(lb/sq ft), y=unit wt of water, (62.4lb/cubic ft), d=flow depth(ft), s=slope(ft/ft) Tables From the NC Erosion & Sediment Control Manual (unless otherwise noted) d (ft) v (f/s) (Td) **** 0.95 0.23 DEPTH 3.12 Calculated Shear 1.16 VELOCITY SYNTHETIC MAT DISCHARGE** Q (cfs) Job Name Williamston Subdivison Job No. Date 10/20/2017 Sheet Subject ROADSIDE DITCHES By KEH Chk By DETERMINE GRASS LINER PROPOSED GRASS LINER:TALL FESCUE Use Retardence Class D APPROACH: Channel Design calculated using NORMAL DEPTH procedure. Calculated VELOCITY is compared to MAXIMUM VELOCITY allowed for liner. Calculated VR is then compared to Fig. 8.05c to determine if design is within range for prop.RETARDENCE CLASS PROPOSED CHANNEL:RD-4(8.0%) AVERAGE SLOPE: 8.00 % MAX VELOCITY allowed: 4.00 feet/sec MANNING'S (n) used: 0.045 MAX VR allowed: 2.2 DISCHARGE FLOW WETTED CRITICAL DEPTH Side Slope Bottom VELOCITY Q=CIA AREA PERIMETER DEPTH FROUDE (d) ft ft/ft Width (ft) V (f/s) Q(10) (cfs) (sq ft) (ft) (ft) No. Fr VR 0.29 3.5 0.5 2.82 1.22 0.43 2.59 0.31 1.21 0.47 FLOW IS SUBCRITICAL VELOCITY CHECK Calculated velocity of 2.82 feet/sec is less than permissable velocity of 4.00 feet/sec VR CHECK 0.47 is less than the maximum allowable VR of 2.2 Therefore TALL FESCUE can be used as a grass liner for RD-4(8.0%) *Permissable Velocity Obtained from Table 8.05a **VR = Velocity * Hydraulic Radius = Velocity * Flow Area/Wetted Perimeter Tables From the NC Erosion & Sediment Control Manual (unless otherwise noted) Calculated VR Job Name Williamston Subdivison Job No. Date 10/20/2017 Sheet Subject PERMANENT DITCHES By KEH Chk By DETERMINE TEMPORARY LINER APPROACH: Channel Design calculated using NORMAL DEPTH procedure. Velocity is checked to see if Temporary Liner is required. If required, 2 year storm is used for design. Shear Stress is then compared to Permissable Shear Stress allowed. PROPOSED CHANNEL:PD (5.0%) DRAINAGE AREA: 0.80 Acres MAX SHEAR Td allowed: 2.00 AVERAGE SLOPE: 5.00 % VELOCITY CHECK of Channel Design using Manning of 0.02 (Bare Earth) Calculated VELOCITY of 5.66 is GREATER THAN 2 Feet per second TEMPORARY LINER REQUIRED (USING 2 YEAR STORM FOR DESIGN) PROPOSED LINER:SYNTHETIC MAT *MANNINGS (n) of 0.036 used for design Calculated shear of 1.26 is less than the Permissable Shear*** of 2 Therefore can be used as a temporary liner for PD (5.0%) *Mannings Coefficient obtained from Table 8.05e **RATIONAL METHOD USED TO DETERMINE DISCHARGE Q=CIA Where C= 0.5 I=7.6 in/hr for channel design,Tc=5 min I=5.94 in/hr for 2 year storm REF: NOAA Atlas 14 Data ***Permissable Shear Stress Td obtained from Table 8.05g ****Td=yds Where T=Shear Stress(lb/sq ft), y=unit wt of water, (62.4lb/cubic ft), d=flow depth(ft), s=slope(ft/ft) Tables From the NC Erosion & Sediment Control Manual (unless otherwise noted) DISCHARGE** DEPTH VELOCITY v (f/s) (Td) ****d (ft) Calculated Shear SYNTHETIC MAT 2.38 0.40 3.43 1.26 Q (cfs) Job Name Williamston Subdivison Job No. Date 10/20/2017 Sheet Subject PERMANENT DITCHES By KEH Chk By DETERMINE GRASS LINER PROPOSED GRASS LINER:TALL FESCUE Use Retardence Class D APPROACH: Channel Design calculated using NORMAL DEPTH procedure. Calculated VELOCITY is compared to MAXIMUM VELOCITY allowed for liner. Calculated VR is then compared to Fig. 8.05c to determine if design is within range for prop.RETARDENCE CLASS PROPOSED CHANNEL:PD (5.0%) AVERAGE SLOPE: 5.00 % MAX VELOCITY allowed: 4.50 feet/sec MANNING'S (n) used: 0.045 MAX VR allowed: 2.2 DISCHARGE FLOW WETTED CRITICAL DEPTH Side Slope Bottom VELOCITY Q=CIA AREA PERIMETER DEPTH FROUDE (d) ft ft/ft Width (ft) V (f/s) Q(10) (cfs) (sq ft) (ft) (ft) No. Fr VR 0.50 3 0.5 3.09 3.04 0.98 3.63 0.50 1.03 0.84 FLOW IS SUBCRITICAL VELOCITY CHECK Calculated velocity of 3.09 feet/sec is less than permissable velocity of 4.50 feet/sec VR CHECK 0.84 is less than the maximum allowable VR of 2.2 Therefore TALL FESCUE can be used as a grass liner for PD (5.0%) *Permissable Velocity Obtained from Table 8.05a **VR = Velocity * Hydraulic Radius = Velocity * Flow Area/Wetted Perimeter Tables From the NC Erosion & Sediment Control Manual (unless otherwise noted) Calculated VR STORM DRAINAGE CALCULATIONS Job: Williamston Subdivision Job No. Date 10/20/2017 Sheet Subject: Tc Calcs - Road Culvert By KEH Chk By DRAINAGE AREA = 5.45 acs PRE-DEVELOPED SHEET FLOW Segment ID:A Surface description (table 3-12):Dense Grass Manning's roughness coeff., n:0.24 Flow length, L (total L<300') (ft):190.00 2yr 24 hour rainfall, P (in):3.59 NOAA Atlas 14 - Monroe Land slope, s (ft/ft):0.037 Tc=0.007 (nL) ^0.8 Tc=0.29 hours P^0.5 x s^0.4 SHALLOW CONCENTRATED FLOW Segment ID:B Flow length, L (ft):500.00 Watercourse slope, s (ft/ft):0.010 Average velocity, V (fig3-5) (ft/s):1.60 Tc=L / (3600xV) Tc=0.087 hours CHANNEL FLOW Segment ID:C Assume velocity, V (ft/s):7.00 Flow length, L (ft):370.00 Tc=L / (3600xV) Tc=0.015 hours Total Tc path = 0.396 hours = 23.7 minutes USE 20 minutes for Analysis APRON CALCULATIONS Job: Williamston Subdivision Job No. Date 10/20/2017 Sheet Subject: Apron By KEH Chk By APRON:(24" RCP) Pipe Diameter, Do 24 Inches or 2 Feet Apron Length, L=12 Feet (from Fig 8.06a) Channel Width, b=0.5 Feet Side Slope, M:1 = 2 :1 H (2/3 Pipe Dia): =1.3 Feet Apron Width, W1 =6 Feet (3 * Pipe Dia.) Apron Width, W2 =5.9 Feet d50 Stone Size = 0.5 Feet (from Fig 8.06a) =6 inches Apron Thickness, t=13.5 inches RECEIVING OUTLET (CHANNEL / SHEET FLOW): CHANNEL SUPPORTING DATA Hydrologic Soil Group—Union County, North Carolina (Williamston Subdivision) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/12/2017 Page 1 of 438836703883720388377038838203883870388392038839703883670388372038837703883820388387038839203883970553520553570553620553670553720553770553820553870553920553970554020 553520 553570 553620 553670 553720 553770 553820 553870 553920 553970 554020 35° 5' 50'' N 80° 24' 46'' W35° 5' 50'' N80° 24' 25'' W35° 5' 39'' N 80° 24' 46'' W35° 5' 39'' N 80° 24' 25'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 100 200 400 600 Feet 0 35 70 140 210 Meters Map Scale: 1:2,420 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Union County, North Carolina Survey Area Data: Version 16, Sep 20, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 11, 2011—Feb 13, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Union County, North Carolina (Williamston Subdivision) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/12/2017 Page 2 of 4 Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Union County, North Carolina (NC179) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI GsB Goldston-Badin complex, 2 to 8 percent slopes D 1.0 10.6% TaC Tarrus gravelly silt loam, 8 to 15 percent slopes B 4.6 47.6% TbB2 Tarrus gravelly silty clay loam, 2 to 8 percent slopes, moderately eroded B 4.0 41.9% Totals for Area of Interest 9.6 100.0% Hydrologic Soil Group—Union County, North Carolina Williamston Subdivision Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/12/2017 Page 3 of 4 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Union County, North Carolina Williamston Subdivision Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/12/2017 Page 4 of 4 SUPPORTING DATA