Loading...
HomeMy WebLinkAbout20070173 Ver 5_More Info Received_20171213 (2)Table of Contents Section 1 PROJECT OVERVIEW 1.1 Narrative ..................................................................................................................3 1.2 Stormwater Management and Sediment Control .....................................................6 1.3 Sequence of Construction ........................................................................................9 1.4 Non-Numeric Effluent Limits ..................................................................................9 1.5 Certification Statement ..........................................................................................13 Section 2 SITE FEATURES AND SENSITIVE AREAS 2.1 Sources of Pollution ...............................................................................................14 2.2 Surface Waters .......................................................................................................15 2.3 Impairments And TMDLs......................................................................................15 2.4 Critical Areas .........................................................................................................15 Section 3 COMPLIANCE REQUIREMENTS 3.1 SWPPP Availability .............................................................................................16 3.2 Pre-Construction Conferences ...............................................................................16 3.3 Inspection Requirements ........................................................................................16 3.4 Maintenance Policies ............................................................................................16 3.5 Record Keeping ....................................................................................................16 3.6 Final Stabilization ..................................................................................................16 Appendices REFERENCE MATERIAL Appendix A - Site Maps ...............................................................................................17 Appendix B - Drainage Maps .......................................................................................27 Appendix C - Hydrology Report (C-SWPPP* Only) ...................................................30 Appendix D - Inspection Log and Reports (OS-SWPPP** Only) .............................300 Appendix E - Rainfall Records (OS-SWPPP** Only) ...............................................303 Appendix F - Additional Site Logs and Records (OS-SWPPP** Only)....................306 Appendix G - Construction General Permit (CGP) - ..................................................315 *C-SWPPP is acronym for Comprehensive Storm Water Pollution Prevention Plan **OS-SWPPP is acronym for On-Site Storm Water Pollution Prevention Plan Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 2 of 315 Section 1 PROJECT OVERVIEW 1.1 Narrative Construction Activities and BMP Summary The project encapsulated within this Storm Water Pollution Prevention Plan is the new construction of the Novo Nordisk Diabetes API-US (DAPI) facility in Johnston County, near Clayton NC. The site is located at coordinates N35º36’58.71” and W78º24’11.6”. The DAPI project is in two phase. The initial Phase 1 will consist of eight buildings (Central Utility Building 1, Fermentation 1, Purification 1, Recovery 1, Office Spine 1, Warehouse1, and Guardhouses 1 & 2), utility corridor, new electrical sub-station, employee parking lots, underground utilities, and ancillary paved roads around the facility. A future Phase 2 is expected to add seven buildings (Central Utility Building 2, Purification 2 & 3, Recovery 2, Office Spine 2, Drug Production, and Warehouse 2), expanded utility corridor, additional employee parking lots, underground utilities, and paved roads around the facility. A layout of the planned facility is shown on the Site Master Plan, drawing CL XX DAPI-US 3 10 00000 02 of the Master Plan drawing set. Study Area The study area covers approximately 178 acres. The site is located along Powhatan Road south east of Clayton, NC, approximately ½ mile from the intersection of U.S. Highway Business 70. The site is east of the existing Novo Nordisk facility and north of the Southern Railroad. The property boundary and existing conditions can be found on CL XX DAPI-US 3 10 00000 01 of the Master Plan drawing set. Pre-Development Conditions The site is divided into four drainage areas for analysis; refer to Drainage Maps in Appendix B. The first drainage area flows via sheet flow towards a wetlands area in the center of the site and discharges along the eastern property line. This drainage area is 123.15 acres. The drainage area consisting of primarily canopy trees within a wetland area (40.83 ac.), and agricultural row crops (82.32 ac.), and the weighted Cn for the watershed is 83. The second drainage area is 26.94 acres consisting of primarily canopy trees within a wetland area (2.18 ac.) and agricultural row crops (24.76 ac.), flows via sheet flow west to be collected within the wetland area and slowly flows into a 24” pipe culvert underneath Powhatan Road into an existing stormwater retention pond on the existing Novo Nordisk site. The weighted Cn number for drainage area #2 is 79. The third drainage area consists of 20.59 acres consisting of primarily canopy trees within a wetland area (2.71 ac.) and agricultural row crops (17.62 ac.) flows via sheet flow south to be collected within the wetland area and slowly flows into a culvert underneath the Southern Railroad where it continues south off of the property. The weighted Cn number for drainage area #3 is 80. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 3 of 315 The fourth drainage area consists of 7.58 acres consisting of primarily agricultural row crops (7.58 ac.) flows via sheet flow southeast off of the property. The weighted Cn number for drainage area #3 is 78. The weighted runoff calculations are located in the Hydrology report in Appendix D Post-Development Conditions Proposed site build out improvements will be as follows: 15 new buildings (Central Utility Building 1&2, Fermentation 1, Guardhouses 1 & 2, Purification 1-3, Recovery 1&2, Spine 1 & 2, Warehouse 1 & 2, and Drug Production), utility corridor to service the facility, new electrical substation, employee parking lots, underground utilities, and ancillary paved roads surrounding the site. The post development basins are divided to maintain consistency with the pre development basins and the four analysis points, refer to Drainage Maps in Appendix B more details. The first drainage area consists of 126.98 acres. This drainage area consists of undeveloped open area, wetlands (38.61 acres), the Phase 1 portion of the facility, and the new NC DOT Road from Gordan Road (3.44 acres). The undeveloped part of the drainage area will flow via sheet flow towards the wetlands (35.28 acres) and then off- site along the eastern property line. The developed portions of the basin will flow via underground piping to different detention basins. 14.56 acres will be directed into stormwater management basin 2, 36.79 acres will be directed into stormwater management basin 3, and 0.7 acres will flow into the small basin to the east of the warehouse. The outflow from the detention basins will enter the wetlands and flow over land towards the same discharge point along the eastern property line. The weighted Cn number for the analysis is 89 to incorporate future buildout to the site. The second drainage area is 36.60 acres primarily consisting of the future Phase 2 development. Storm water, during construction, will flow via sheet flow to diversion ditches and then flow underground pipes towards Storm Water Management Basin #1. The flow from the basin will exit the outflow structure into the pipe under Powhatan Road and will discharge into the existing stormwater pond on the Novo Nordisk property west of Powhatan Road. The weighted Cn number for the analysis is 90 to incorporate future buildout to the site. The third drainage area is 9.07 acres consisting of parking area and wetlands. 4.24 acres of the area will be directed into to the southwest parking lot basin. 2.66 acres will be directed into the southeast parking lot basin. All stormwater entering the basins will be managed for quantity control prior to release into the wetlands. Storm water will continue through the wetlands into a 36” culvert under the Southern Railroad easement. The weighted Cn number for the analysis is 94. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 4 of 315 The fourth drainage area consists of 5.35 acres consisting of pervious maintained areas flows via sheet flow southeast off of the property. The weighted Cn number for drainage area #4 is 78. The improved site was evaluated to analyze the effect of the change in land use upon stormwater runoff rates. Per 15A NCAC 02B.0235 and Johnston County regulations, post-development discharge rates shall not exceed pre-development discharge rates for the 1-yr frequency 24-hour duration storm events. Peak runoff rates were calculated for pre-development and post-development conditions. The SCS 24 hour storm was used to develop the hydrology model and predict runoff rates for storms with average return frequencies of 1, 2, 10, 25, and 100 years for pre- and post-development conditions. After analyzing the study area, it shows that post-development flows are below above pre-development rates. Please refer to the summary table below, and the Appendices for detailed information. Table #1 - Peak Runoff Rates Pre Construction:   DA (acres) CN 1-Year (cfs) 2-Year (cfs) 10-Year (cfs) 100-Year (cfs) Pre to DA#1 123.15 83 78.5 108.81 200.05 355.25 Pre to WS #2 26.94 79 26.24 37.8 73.73 136.41 Pre to WS #3 20.59 80 28.69 40.67 77.29 140.21 Pre to WS #4 7.58 78 7.45 10.83 21.52 40.3 Table #2 - Peak Runoff Rates Post Construction (Pre Detention):   DA (acres) CN 1-Year (cfs) 2-Year (cfs) 10-Year (cfs) 100-Year (cfs) Post to DA #1 126.98 89 123.85 161.83 271.44 451.30 Post to WS #2 36.60 90 48.80 63.14 104.17 171.17 Post to WS #3 9.07 94 27.38 34.12 53.13 84.07 Post to WS #4 5.35 78 6.06 8.80 17.41 32.48 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 5 of 315 Table #3 - Peak Runoff Rates Post Construction (Post Detention):   DA (acres) CN 1-Year (cfs) 2-Year (cfs) 10-Year (cfs) 100-Year (cfs) Post DA#1 Detention Outflow 126.98 89 37.95 51.29 90.39 165.42 Post DA#2 Detention Outflow 36.60 90 0.34 3.19 21.35 44.78 Post DA#3 Detention Outflow 9.07 94 10.25 21.12 36.24 81.36 Post DA#4 Detention Outflow 5.35 78 6.06 8.80 17.41 32.48 Stormwater Conveyance System The proposed underground stormwater system has been analyzed using Hydraflow Storm Sewers. This includes approximately 11,500 linear feet of HDPE ranging in size from 12” to 60”, as well as structures including manholes, junction boxes, clean outs, and flared end sections. The system has been sized to convey the 10-year, 24-hour storm event. It was also analyzed to determine the functionality of the system during the 100- year, 24-hour storm event. During the 10-year storm, the system was sufficient to convey all stormwater with no flooding. Flooding did occur during the 100-year storm, but was released before damaging stormwater elevations occurred. Refer to Appendix B for land use and watershed maps and to Appendix D for Hydrology Report and all stormwater calculations. Flooding Issues The proposed project is not located in a FEMA flood zone. Refer to Appendix A for further information. 1.2 Stormwater Management and Sediment Control Erosion Prevention BMPs As the existing site is cleared, grubbed and graded to the proposed contours shown on the construction site plans, erosion prevention BMPs shall be placed throughout the construction site to aid in the prevention of sediment-laden stormwater runoff. These BMPs shall be focused in areas with high potential of erosion, areas preceding infiltration practices. Each erosion prevention measure shall be selected on a site-specific basis and details have been provided on the construction site plans. The plans identify all proposed Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 6 of 315 Erosion Prevention BMPs and the recommended installation, maintenance, and inspection procedures. In order to minimize soil erosion, a phased construction approach is being implemented in order to install sediment controls prior to any major land disturbance. Refer to Early Works drawing set and Final Grading and Paving set for construction schedule. Sediment Control BMPs Sediment Control BMPs are designed to remove some of the sediment accumulated within stormwater runoff, to the best extent practicable. These BMPs help prevent sediment impacts to adjacent properties and water bodies from stormwater discharges originating from construction sites. Typically these BMPs are placed near each of the site’s outfalls and are installed prior to clearing and grubbing of the site (before large areas of soil are exposed). However, these BMPs can also be located throughout the construction site and, in these circumstances, are installed after roadway grading has occurred. Placement, sizing and modifications of Sediment Control BMPs should be left to the SWPPP preparer and/or the Site Engineer. Contractors must consult the SWPPP Preparer as listed at the front of this SWPPP before making any significant changes to these BMPs. Sediment control BMP’s to be utilized onsite are, but not limited to silt fence, sediment traps, inlet protection and sediment basins. Structural Control BMPs This site-specific SWPPP utilizes the following structural control BMPs: sediment silt fence and dry detention basin with a skimmer. These practices have been designed to either divert flows from exposed soils, to retain/detain flows, and to otherwise limit the runoff and the discharge of pollutants from disturbed areas of the construction site. Throughout the lifespan of the construction project these BMPs will be installed and maintained, as required by the SWPPP and the construction site plans, until final stabilization has been achieved for the areas draining to each BMP. Upon final stabilization, each structural control BMP must be modified to the post-construction conditions shown within the approved construction site plans or removed, if the structural BMP was a temporary structure. Silt fence will encompass the perimeter of the project in order to prevent sediment from entering the wetlands or migrating off site. The silt fence which is solely being used for sediment control has been designed to handle ¼ acre per 100 feet of silt fence. A double row of silt fence has been incorporated within the site along the wetland boarders. The double row of silt fence provides an 86% trapping rate which is greater than the 54% provided by a 75’ filter strip. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 7 of 315 Construction Entrances and Dust Control All access areas into and out of the limits of disturbance, as shown on the construction site plans, require the installation of a construction entrances and wheel washes. Any tracked sediment, along with any attached pollutants, deposited on impervious areas could be washed downstream during the next rain event. Each construction entrance must be installed as shown in the details section of the construction site plans. If a new entrance or exit is required, that is not shown on the plans, install the construction entrance as noted by the construction entrance detail, mark the location on the plans and make a record of this minor modification in the SWPPP’s modification log, which is located within one of the appendices of the On-site SWPPP. Each stabilized construction entrance should be used in conjunction with Street Sweeping measures if it becomes apparent that sediment is still being tracked onto adjacent impervious areas, even with the use of the construction entrance. During extremely dry conditions, drought, and/or excessive winds, the construction site should be treated for dust control to prevent the suspension of fine sediment particles into the air, being carried offsite, and deposited on adjacent properties or surface waters. This practice may not be directly called out for on the construction site plans. A water tanker used to spray the soil down may be an effective way to prevent excessive dust at a construction site. Water Quality BMPs During Construction During construction, water quality will be controlled with the following measures: sediment and detention basins, sediment traps, concrete washouts, and construction entrances. Should construction require maintenance facilities, berms and additional hazardous material storage and containment measures shall be constructed to prevent runoff into the drainage system. Water Quality Post Construction Total Suspended Solids No post construction water quality is required for this project. The nitrogen export from the site is under the limit of 10 lbs/year requirement. See calculation in Appendix II of the Hydrology report. Wet detention ponds have been incorporated into the design of the site in order to remove total suspended solids. The three wet detention ponds will remove 90% TSS. Surface area to drainage area ratios are provided in the table below. Surface Area (acres) Drainage Area (acres) Provided SA/DA (%) Required SA/DA (%) Pond #1 (A&B) 1.30 35.8 3.63 3.5 Pond #2 0.91 14.93 6.07 3.2 Pond #3 2.88 39.48 7.30 2.4 All three ponds exceed the required SA/DA ratios prescribed be NCDEQ for 90% removal of Total Suspended Solids (TSS). Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 8 of 315 Nitrogen Loading In accordance with 15A NCAC 02B.0235 developments in the Neuse River Basin must address the amount of Nitrogen exported from the site to address nutrient loading in the watershed. Developments are permitted to export up 3.6 pounds/acre/year without any mitigation. For industrial developments Nitrogen loading between 3.6 and 10.0 pounds/acre/year may either mitigate Nitrogen with on site BMP’s or purchase credits from an approved source. For industrial developments Nitrogen loading cannot exceed 10.0 pounds/acre/year. A nitrogen analysis was completed, in accordance with the guidelines provided by Johnston County, to determine the amount of nitrogen released from the site per year for the initial Phase 1 development and the Phase 2 build out. The analysis showed that the nitrogen released was managed to 3.93 and 5.78 pounds of nitrogen per acre per year, respectively. Refer to Appendix II of the Hydrology Report for supporting calculations. Other Stormwater Management Procedures Two dry detention ponds have been proposed to mitigate runoff from portions of the parking lots on the southwestern side of the property. The existing sediment trap to the east of the warehouse will remain in place to provide additional detention for future parking areas. 1.3 Sequence of Construction This project will be phased in order to minimize the soil erosion impact from the site. 1.4 Non-Numeric Effluent Limits Stormwater Volume and Velocity Control During the implementation of construction activities, all parties performing work at this construction site whose work may affect the implementation of the SWPPP must be informed of and directed on how to comply with this Non-Numeric Effluent Limit, which requires the management of stormwater runoff within the construction site and at each outfall. The purpose of this requirement is to control the stormwater volume and velocity at these locations to minimize erosion. Specifically, each responsible party should be made aware of the practices that have been or should be implemented at the construction site to accomplish these particular stormwater management practices. Below is a list of practices that may be utilized within the disturbed area and at each outfall at construction sites to control stormwater volume and velocity: Volume Control  Limiting the amount of disturbed area and exposed soils  Staging and/or Phasing of the Construction Sequence;  Sediment Basins and Excavated Inlets  Diverting off-site flow around the construction site; Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 9 of 315  Controlling the Drainage Patterns within the Construction Site;  Temporary Stabilization of Disturbed Areas. Velocity Control  Surface Roughening and/or other Slope Stabilization Practices;  Level Spreaders, Riprap Plunge Pools and/or other Velocity Dissipation BMPS located at the Construction Site's and Sediment Basin Outfalls.  Use of Rock Checks, Sediment Tubes, Etc. in Temporary Diversions Swales and Ditches.  Use of Erosion Control Blankets, Turf Reinforcement Mats, and other Non- Vegetative BMPs that can be used to Quickly Stabilize Disturbed Areas. The SWPPP Preparer/Engineer should approve any modifications (Additional BMPs or Changes to Existing BMPs) to address the management of stormwater volume and velocity prior to implementation. All approved SWPPPs that were issued coverage under the CGP should include ample BMPs and other control measures to address this specific Non-Numeric Effluent Limit. Soil Exposure, Compaction and Preservation Throughout construction activities, the amount of soil exposed during construction should be kept to a minimum. This may be accomplished by minimizing the amount the disturbed area within the permitted Limits of Disturbance (shown on the approved construction site plans) to only that which is necessary to complete the proposed work. For areas that have already been disturbed and where construction activities will not begin for a period of 14 days or more, temporary stabilization techniques must be implemented. Prior to implementation of any major grading activities, topsoil is to be preserved by placing it in areas designated for stockpiling until final grades are reached. Each stockpile must be equipped with proper sediment and erosion controls to preserve the topsoil and protect adjacent areas from impacts. Once final grades have been reached, the preserved topsoil should be utilized to apply to areas identified for stabilization. Topsoil contains nutrients and organisms that aid in the growth of vegetation. The Compaction of Soil should also be minimized to the degree practicable during grading activities. This is especially important during the replacement of topsoil to aid in a quick establishment of vegetative cover. Compaction of soil may also reduce rainfall's ability to infiltrate into the soil, increasing the amount of stormwater runoff. Soil Stabilization Throughout construction activities, soil stabilization techniques are to be initiated as soon as practicable whenever any clearing, grading, excavating, or other land-disturbing activities have permanently or temporarily ceased on any portion of the construction site and will not resume for a period exceeding 14 calendar days. For areas where initiating stabilization measures is infeasible, (e.g., where snow cover, frozen ground, or drought conditions preclude stabilization), initiate vegetative or non-vegetative stabilization measures as soon as practicable. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 10 of 315 Steep Slopes (Slopes of 30% grade or greater) All disturbed steep slopes (30% grade, ~3H:1V, or greater), and steep slopes to be created through grading activities must be managed in a fashion that limits the potential of erosion along the slopes. All parties whose work is/was responsible for the creation/disturbance of steep slopes must comply with the following items:  Minimize the Disturbance of all steep slopes, when possible.  Divert Concentrated or Channelized Flows of stormwater away from and around steep slope disturbances.  Use Specialized BMP Controls including temporary and permanent seeding with soil binders, erosion control blankets, surface roughening, reducing continuous slope length with terracing or diversions, gradient terraces, interceptor dikes and swales, grass-lined channels, pipe slope drains, subsurface drains, level spreaders, check dams, seep berms, and triangular silt dikes to minimize erosion.  Initiate Stabilization Measures as soon as practicable on any disturbed steep slope areas where construction activities have permanently or temporarily ceased, and will not resume for a period exceeding 7 calendar days.  A Vegetative and/or Non-Vegetative Cover must be established within 3 working days from the time that stabilization measures were initiated. Stabilization of steep slopes should be a priority for those performing work at the construction site. At the very least, runoff control BMPs should be implemented to transport stormwater runoff from the top of the slope to the toe of the slope. An example of this is to install diversion swales along the top of slope and direct the runoff towards pipe slopes drains to transports the runoff to the toe of the slope. All pipe slope drain outlets are to be equipped with proper outlet protection. Sediment Discharge Minimization Permittees, Contractors, and all other parties responsible for conducting land-disturbing activities are required to install and maintain all erosion and sediment BMPs that are identified on the approved construction site plans. These BMPs have been designed and approved to address such factors as the amount, frequency, intensity and duration of precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of soils particle sizes expected to be present on the construction site. Proper installation, inspection, and maintenance will allow these BMPs to operate at maximum efficiencies in order to minimize sediment discharges to the maximum extent practical. Pollutant Discharge Minimization Permittees, Contractors, and all other parties responsible for conducting land-disturbing activities are required to install, implement, and maintain effective pollution prevention measures to minimize the discharge of pollutants. At a minimum, the following items must be implemented:  Minimize the discharge of pollutants from dewatering trenches and excavations by managing runoff with the appropriate controls. Otherwise these discharges are Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 11 of 315 prohibited;  Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge;  Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste and other materials present on the site to precipitation and to stormwater; and  Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures. Prohibited Discharges Permittees, Contractors, and all other responsible parties for conducting land-disturbing activities are prohibited from discharging, from the construction site, the following items:  Wastewater from washout of concrete, unless managed by an appropriate control;  Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds and other construction materials;  Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and  Soaps or solvents used in vehicle and equipment washing. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 12 of 315 Section 2 SITE FEATURES AND SENSITIVE AREAS 2.1 Sources of Pollution Throughout construction activities, each permittee, contractor, and person responsible for conducting work will need to ensure that sources of pollution are managed to prevent their discharge from the construction site. Expected pollution sources during construction have been identified in Table 2.1-A, but due to the nature of construction activities, it is often tough to predict all pollution sources that may appear throughout the life of a construction project. For that reason, the following table has also been provided to help all those performing work at this construction site identify possible sources of pollution Stormwater runoff subjected to the identified pollution sources must be treated by the appropriate BMPs as directed by this SWPPP. In the event that any additional sources of pollution are identified during construction, the person(s) with day-to-day operational control at the site is to add the new source(s) to Table 2.1-A and consult with the SWPPP Preparer to properly address this source and to prevent the discharge of it's pollutant through stormwater runoff. Table 2.1-A: Potential Sources of Pollution Source Material or Chemical Location* Appropriate Control Measures Loose soil exposed/disturbed during clearing, grubbing and grading activities Sediment All areas within the Limits of Disturbance As directed by the construction plans. This includes Silt Fence, sediment tubes, sediment basins, and sediment traps. Areas where construction equipment are cleaned, a.k.a. concrete washout Heavy Metals & pH Located adjacent to each construction entrance Concrete Washout Basin as shown in the construction plans. Water encountered during trenching Nutrients & Sediment In and around any trenching activities. Direct water into impoundments such as basins or traps to allow for the sedimentation of the listed pollutants. Paving Operations Sediment & Trash All areas to be paved. Inlet protection. Material Delivery and Storage Areas Nutrients, pH, Sediment, Heavy Metals, oils & grease All areas used as storage areas Silt fence and/or sediment dikes Equipment fueling and maintenance areas Metals, hydrocarbons, oils and greases Areas surrounding fuel tanks Provide secondary containments, locate in upland areas. Repair leaking and broken hoses. *Area where material/chemical is used on site. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 14 of 315 2.2 Surface Waters There are no rivers or open bodies of water on the site. 2.3 Impairments and TMDLs This site is within the Neuse River watershed. A special water resource plan has been implemented to protect this watershed. The Neuse River is included on the current North Carolina 303D list. The proposed construction site needs to consider the nitrogen export and reduce it below the allowable 10 pounds per year limit set for industrial sites. The site in its final configuration produced just less than 10 pounds per year, and will not require any additional water quality in order to meet the set targets. The calculations for the site are shown in Appendix II of the Hydrology Report. 2.4 Critical Areas The site has wetlands located on it, but the wetlands are not considered critical areas as defined by the North Carolina Department of Environmental Quality. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 15 of 315 Section 3 Compliance Requirements 3.1 SWPPP Availability The On-Site SWPPP (OS-SWPPP) will be located onsite during construction. 3.2 Pre-Construction Conferences A pre-construction conference will be held on-site prior to starting land disturbing activity. The Primary/Secondary Permittee or SWPPP Preparer are responsible for notifying the appropriate parties and holding the pre-construction conference. Each contractor, subcontractor, blanket utility provider, etc., who will work at the site is to attend the pre-construction meeting in person. 3.3 Inspection Requirements Site to be inspected weekly until final stabilization has been reached. Upon final stabilization the inspections may be reduced to once a month until the Notice of Termination has been submitted. Inspector to be the SWPPP Preparer, an individual directly under the SWPPP Preparer’s authority, or an individual with a registration equivalent to the SWPPP Preparer. Inspection reports are to be kept onsite with the OS- SWPPP. Refer to Appendix E for forms. Inspector to install and maintain a rain gauge and rainfall log during construction. Refer to Appendix F for rainfall log. 3.4 Maintenance Requirements Contractor to maintain silt fence, construction entrance, and other temporary BMP’s, as shown on the site plans, during construction. A detention pond maintenance agreement for the permanent ponds will be provided. 3.5 Record Keeping Appendix E, F, and G are to be utilized by all parties working onsite to track site related issues, were applicable, and document site changes as they occur. All records to remain with the OS-SWPPP at all times during construction. 3.6 Final Stabilization Final stabilization to be addressed per the site plans through the use of landscaping, grassing, and the track surface. Once final stabilization has been reached on all disturbed areas, the Notice of Termination is to be submitted. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 16 of 315 Appendix A Site Maps Location Map USGS Map County GIS Map Soils Map FEMA FIRM Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 17 of 315 Location Map Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 18 of 315 Benson Selma Garner FourOaks Powhatan FlowersClayton Edmondson FourOaks NE ADJOINING 7.5' QUADRANGLES Imagery................................................NAIP, January 2010Roads..............................................©2006-2010 Tele AtlasNames...............................................................GNIS, 2010Hydrography.................National Hydrography Dataset, 2010Contours............................National Elevation Dataset, 2010 USGS:USFS: !( #!" #!" #!" #!" #!" #!" #!" █n F 300300 300 250 250 250300 2 0 0200 150200 300200200 250 250 250250200 200 300 300200 150250 300 30 0300 250200 200150 250 300 200250200 20015 0 150 250300 300300 250250300 25025020015 0 250 250 300 250 2002 0 0 250200250 200200150150200250250200 250 250 2 0 0 200 250 300250 2001 5 0 250200 250250250250250250 150250250 300 300 250250200 150 1501501 7 5 150 125250 300 200 200 200 150 1 5 0 200250 150150 300 250 150200300250200 20 0 150 250 200 250 200150175 225 175 200 150 250 200 20 0 200 200250150250 250 300 2501 5 0 2 0 0 250 300 20 0 200200 150 200200200200250200 200 150175150 Johnston County Airport £¤Bus70 £¤Bus70 £¤Bus70 £¤70 £¤70 £¤70 £¤Bus70 £¤Bus70 ¬«210 ¬«210 ¬«210 ¬«210 ¬«210 S NEADDRWINDSOR GREEN DRCORBETTRDC O U N T RY L NBARBERMILLRD WILDWOODDRAMELIACHURCHRD LITTLECREEKCHURCHRDGL ENL AUREL RDWILTSHIREDRPA L M ERDRHEREFORD DR HOGANCI R LASSITERRDJACKRDKORATLN H I L L S I D E D R BEA D L E C TS PA N I E L LN P O WE LLDRDUCKP O N D LNI RONWOODLNLEEFARMLNCANTERBURYRD ELM DR N A T HANDR I R VA N ST PEARTREELNPOPLARDRLITTLE C R E E K CHURCH RDS A N TA G E RT R U DIS DR S WIF T C R E E K R D HOME STEAD LNCREEKSIDE DRWATER OAK DRC LOVERDALE DR LAKEWOOD RD AMY DRRUBERT A V EBLACK CREEK RDJESSE DR C R A N TO C K R D TA R A D R ALTA V ISTA CTCOLE RDAPPLEWOOD DR RACHELS WAY WILLOW LNWAHOO DR C R O OKED CREEK RDL E E T RACE DR WILSONS MILLS RDCORBETT RDSADISCO RD GLEN LAUREL RDDICKINSON RDVI LNS O M M E R S E T DR WILSON JONES RD WESTERMAN PLMAJESTIC LNH U GH DRRED B U D D R LOIS LNLEE ST CO HOME RDILLINOIS DRAYDEN DR W ILSO M M IL L S R D JULIAN LNWELLONS RDMETA DR SALLIE DRJASPER D R JACK RD V A L L E Y C R EEK DR COLONIAL D R LEE RD SUNRAY DROGBURN RDLANCASH IR E R U NARTHURDR OLD ENGLISH CT N T ECH DRHAPPY TRAILS RD ALEXANDER LN RED OAK DRT IFFANY CT L I TTL E CR E E K C H U R C H R D CLAYTON POINTE DRR ED STAR LNCHALMERS DR RI DGE RDCLEVELAND RD IN D I A N C A M P RDSHADY MEA D OW LNOPAL LNS H O R T J O U R N E Y R D FREEDOM RDMONROE RDOLD YOGI LNWEATHERSPOON LN HOME STEAD LNENCHANTEDTRLCLEVELANDRD JESSICA DR BEE LN IO WA DRT W IN ACRES RD C O U N T R Y L N P O W H A T A N R D B E NNY RD G LEN ST GALILEE RDC A NYON R DLEEWAY CT BIG PINE RDHEDGEROW LNMARSHALL LNPEELE RDLITTLE CREEK CHURCH R D TRAM LNEXIDE RD T R E N B U R G P L PLANTATION RDRUSTIC DRAUSTIN FARM LNU Z Z I E D R P O N Y F A R M RDH U N T E R ESTSNELSON C T WOOD S I DE DRROCK PILLAR RD ROBIN LN AUTUMN CTRANCH RDW OLIVE R D SERENITY DRNOR R I S R D P O L E N TA R D HO R ATIO CT SMITH RDS T E E L B R I D G E R D G O RDON RD CLEVELAND RD M UELLER DR HILLTOP DRG R E E N P A T H GOVERNMENT RDGLASGO W D R HARRIS RDCASEY RDB A R B O U R R D S AI N T L A WRENCE WAYMILLARD DRCONTENDE R DRSTEPHANIE LN NI COLET LNMCCOY DRB A R N E S R ID G E D R SETH WAYMENDEL DRCHARLIE LNS N O W B E R RY LNESSEXLNSINNSBRUCK DRBARBER MILL RDRUSS RD CAROLINA O A KS AVE DEER RUN PATRICIA DRWAY M O N WAY PEELE RD RANCH RDSW IFT C R E E K R DSTERLING DRPENNY LNSWIFT CREEK DRWILDWOOD LNK A R E N DR BOULD ER DR BARBOURRD W IL S OMMILLS RDSTRICKLAND RDPAY DAY L N GREENLYN DRFARRINGTON D R BESS DRLAND O V ER LN DEEP CREEK DRDEEP CANYON DRR O C K PILL A R R D SA N DY LNIRVAN ST CITA T ION LNMOHI CAN TRLHICKOR Y DR SL A T E TOP RDCONNER DR SMITHFIELD SMITHFIELDCooper BrSteep Hill Br Sassa r i x a S w a m p Little Po plar C r Steep Hill Br Reedy BrCooper BrSassari x a S w am pLittle CrLittle CrS t e e p Hill B r Little Cr Reedy BrReedy Br S t e e p H i l l B r LittlePoplarCrLittle Poplar CrReedy BrS wi ftC r S w i f t Cr Neuse R i v e rSwift CrSwift C r Swift Cr Neuse RiverS w i f t C r M iddle Cr Middle C r Middle C r PowellLake Johnson CountyWildlife Pond BrownsPond Tar H e e l Farm P o n d PantherLake LangdonPond DavisCem PineyGrove Cem OakeyGrove Cem BarhamCem Knollwood Cem LangdonCem PooleCem Powhatan Rose M a n o r Westview Whitley Heights 37 000m 7 35° 25' 000 34 38 39 29 35 30" 36 35' 777 39 42 40 27 7 N 7 7 45 7 39 30' 39 7 180 7 39 39 28 30" 39 33 78° 30' 39 640 35° 35 37' FEET 39 31 39 29 32 37' 7 34 7 38 30" FEET 32 000 E 35' 39 30' 42 FEET 39 39 44 41 7 30 7 78°36 39 39 30" 000 35° 39 78° 39 39 22' 35 32' 7 30' 2 37 39 43 000m 40 000 30"33 N 7 39 39 37 39 000m 43 27' 7 35° 37 32 3439 28 27'25' 39 35 78° 39 2730" 30" 33 E 7 33 32' 44 73032 FEET 39 000m 39 30" 31 150 7 39 347 45 680 2 22' POWHATAN, NC 2013 Expressway Local Connector ROAD CLASSIFICATION Ramp 4WD Secondary Hwy Local Road Interstate Route State RouteUS RouteWX./H POWHATAN, NC 2013 ROAD CLASSIFICATION Check with local Forest Service unitfor current travel conditions and restrictions. FS Primary Route FS HighClearance Route FS PassengerRouteJK L Interstate Route State RouteUS RouteWX./H Expressway Local Connector Ramp 4WD Secondary Hwy Local Road POWHATAN QUADRANGLENORTH CAROLINA-JOHNSTON CO.7.5-MINUTE SERIES U.S. DEPARTMENT OF THE INTERIOR U. S. GEOLOGICAL SURVEY NORTHCAROLINA QUADRANGLE LOCATION This map was produced to conform with the National Geospatial Program US Topo Product Standard, 2011.A metadata file associated with this product is draft version 0.6.11 CONTOUR INTERVAL 10 FEETNORTH AMERICAN VERTICAL DATUM OF 1988 SCALE 1:24 000 1 0.5 0 MILES 1 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 FEET 1000 500 0 METERS 1000 2000 21KILOMETERS00.51 Imagery...................................................NAIP, May 2012Roads..............................................©2006-2012 TomTomNames..........................................................GNIS, 2013Hydrography....................National Hydrography Dataset, 2012Contours............................National Elevation Dataset, 2008Boundaries....................Census, IBWC, IBC, USGS, 1972 - 2012 North American Datum of 1983 (NAD83)World Geodetic System of 1984 (WGS84). Projection and1 000-meter grid: Universal Transverse Mercator, Zone 17S Produced by the United States Geological Survey 10 000-foot ticks: North Carolina Coordinate System of 1983 North American Datum of 1983 (NAD83)World Geodetic System of 1984 (WGS84). Projection and1 000-meter grid: Universal Transverse Mercator, Zone 17S Produced by the United States Geological Survey 10 000-foot ticks: North Carolina Coordinate System of 1983 Imagery<IMG_LEADER><IMG_CITATION>Roads<TRANS_LEADER>©2006-2012 TomTomRoads within US Forest Service Lands.............FSTopo Datawith limited Forest Service updates, 2013Names...............................................................GNIS, 2013Hydrography<HYDRO_LEADER>National Hydrography Dataset, <HYDRO_DATE>Contours<HYPSO_LEADER><HYPSO_CITATION>Boundaries....................Census, IBWC, IBC, USGS, 1972 - 2012<OPTIONAL_CITATIONS> U.S. National Grid 100,000-m Square ID Grid Zone Designation QV 17S × ØMN GN UTM GRID AND 2013 MAGNETIC NORTHDECLINATION AT CENTER OF SHEET 1° 29´26 MILS 9° 10´163 MILS Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 19 of 315 * * * DISCLAIMER * * * Johnston County assumes no legal responsibility for the information represented here. Scale: 1:20120 - 1 in. = 1676.66 feet (The scale is only accurate when printed landscape on a 8 1/2 x 11 size sheet with no page scaling.) Johnston County GIS January 11, 2016 Result 1 id:05I05008A Tag:05I05008A Tax Unique Id:4418463 NCPin:167804-60-8595 Mapsheet No:167804 Owner Name 1:NOVO NORDISK PHARM IND Owner Name 2: Mail Address 1:3612 POWHATAN RD Mail Address 2: Mail Address 3:CLAYTON, NC 27527-0000 Site Address 1: Site Address 2: Book:01486 Page:0001 Market Value:1615650 Assessed Acreage:174.92 Calc. Acreage:174.92 Sales Price:1556500 Sale Date:1995-12-15 Powered by TCPDF (www.tcpdf.org) Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 20 of 315 Hydrologic Soil Group—Johnston County, North Carolina (DAPI Soil Map) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/5/2016 Page 1 of 4394380039440003944200394440039446003944800394500039438003944000394420039444003944600394480039450003945200734000734200734400734600734800735000735200735400735600735800736000736200 734000 734200 734400 734600 734800 735000 735200 735400 735600 735800 736000 736200 35° 37' 21'' N 78° 25' 0'' W35° 37' 21'' N78° 23' 27'' W35° 36' 32'' N 78° 25' 0'' W35° 36' 32'' N 78° 23' 27'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 500 1000 2000 3000 Feet 0 150 300 600 900 Meters Map Scale: 1:10,700 if printed on A landscape (11" x 8.5") sheet. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 21 of 315 MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Johnston County, North Carolina Survey Area Data: Version 19, Sep 29, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 14, 2011—Mar 3, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Johnston County, North Carolina (DAPI Soil Map) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/5/2016 Page 2 of 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 22 of 315 Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Johnston County, North Carolina (NC101) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI AmB Appling-Marlboro complex, 1 to 6 percent slopes B 1.2 0.3% Bb Bibb sandy loam, 0 to 2 percent slopes, frequently flooded A/D 0.2 0.1% CoB Cowarts loamy sand, 2 to 6 percent slopes C 8.4 1.9% FaB Faceville sandy loam, 2 to 6 percent slopes B 1.8 0.4% GeB Gilead sandy loam, 2 to 8 percent slopes C 8.3 1.9% GoA Goldsboro sandy loam, 0 to 2 percent slopes B 14.4 3.2% MaB Marlboro sandy loam, 2 to 8 percent slopes B 10.8 2.4% McB Marlboro-Cecil complex, 2 to 8 percent slopes B 4.0 0.9% NoA Norfolk loamy sand, 0 to 2 percent slopes A 97.4 21.6% NoB Norfolk loamy sand, 2 to 6 percent slopes A 11.8 2.6% PaE Pacolet loam, 15 to 25 percent slopes B 3.1 0.7% Ra Rains sandy loam, 0 to 2 percent slopes A/D 155.2 34.5% Tn Toisnot loam, 0 to 2 percent slopes C/D 25.6 5.7% VrA Varina loamy sand, 0 to 2 percent slopes C 99.7 22.1% VrB Varina loamy sand, 2 to 6 percent slopes C 8.2 1.8% Totals for Area of Interest 450.2 100.0% Hydrologic Soil Group—Johnston County, North Carolina DAPI Soil Map Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/5/2016 Page 3 of 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 23 of 315 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Johnston County, North Carolina DAPI Soil Map Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/5/2016 Page 4 of 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 24 of 315 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 25 of 315 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 26 of 315 Appendix B Drainage Maps Pre Development Watershed Map Post Development Watershed Map Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 27 of 315 PLOT DATE:P:\CAD\210\DWG\XREF\Watershed maps 170525.dwg 06-20-17 8:11 am Printed By: mcc13489ROWROWEFDEE Engineering Professional Corporation 100 Fluor Daniel Drive, Greenville, SC 29607 License No. C-0742FIGURE 1 OF 2C-SWPPP APPENDIX BEXISTING DRAINAGE AREAMAP 08JUN17ACMAFZGRAPHICNovo NordiskDiabetes API-USDrawn By:Scale:Page no.:Design By:Revision date:Creation date:Novo Nordisk A/SPowhatan RoadClayton, North CarolinaUSAPOWHATAN ROAD POWHATAN ROAD NORTH CAROLINA RAILROAD COMPANYEXISTING DRAINAGEAREA #2AREA = 26.94 ACCN=79EXISTING DRAINAGEAREA #1AREA = 123.15 ACCN=83EXISTING DRAINAGEAREA #4AREA = 7.58 ACCN=78EXISTING DRAINAGEAREA #3AREA = 20.27 ACCN=80Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 28 of 315 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX"G" STREET"F" STREET"J" AVENUE"G" AVENUE PHASE 2 "N" AVENUE "L" AVENUE EAST STREETXXXXXXXXXX XXX XXXXXXXXXX "E" STREET"F" STREET PHASE 2"H" STREET PHASE 2"E" STREET PHASE 2"H" STREETXX X X X X X X X X X X X X X X XGENERATOR 1GENERATOR 2GENERATOR 3GENERATOR 4WASTESTORAGEXFMRCONTROLBLDGSTRBLDGSWGRXXXXXX 291.50PLOT DATE:P:\CAD\210\DWG\XREF\Watershed maps 170525.dwg 09-25-17 5:15 pm Printed By: mcc13489ROWROWEFDEE Engineering Professional Corporation 100 Fluor Daniel Drive, Greenville, SC 29607 License No. C-0742FIGURE 2 OF 2C-SWPPP APPENDIX BPROPOSED DRAINAGE AREAMAP 08JUN17ACMAFZGRAPHICNovo NordiskDiabetes API-USDrawn By:Scale:Page no.:Design By:Revision date:Creation date:Novo Nordisk A/SPowhatan RoadClayton, North CarolinaUSACOUNTY: JOHNSTONWATERWAY: RIVER BASIN: NEUSE RIVERDATE OF PUBLIC NOTICE:POWHATAN ROADPOWHATAN ROAD NORTH CAROLINA RAILROAD COMPANYPROPOSED DRAINAGEAREA #4AREA = 5.35 ACCN=78PROPOSED DRAINAGEAREA #1AREA = 126.97 ACCN=88PROPOSED DRAINAGEAREA #3AREA = 9.03 ACCN=95.87PROPOSED DRAINAGEAREA #2AREA = 36.65 ACCN=92PROPOSED DRAINAGE AREA #1SUB BASIN #3AREA = 14.56 ACCN=91PROPOSED DRAINAGE AREA #1SUB BASIN #2AREA = 36.79 ACCN=91PROPOSED DRAINAGE AREA #1SUB BASIN #1AREA = 74.87 ACCN=86PROPOSED DRAINAGE AREA #1SUB BASIN #4AREA = 0.75 ACCN=90PROPOSED DRAINAGE AREA #3SUB BASIN #3AREA = 2.66 ACCN=98PROPOSED DRAINAGE AREA #3SUB BASIN #2AREA = 2.13 ACCN=89PROPOSED DRAINAGE AREA #3SUB BASIN #1AREA = 4.24 ACCN=98Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 29 of 315 Appendix C Engineering Reports Hydrology Report Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 30 of 315 HYDROLOGY REPORT for Diabetes API Project for Novo Nordisk Powhatan Road Clayton, NC Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 31 of 315 Novo Nordisk Clayton, NC TABLE OF CONTENTS Project Narrative 3-7 Soil Information 7 FEMA 8 Waters of the State 8 Hydrological Analysis 8-10 Detention Analysis 10 As-built 10 Detention Waiver 10 Permanent Water Quality 10-11 Sedimentology 11 Navigable Waters 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 32 of 315 Novo Nordisk Clayton, NC Stormwater Hydrographs Appendix I Existing Conditions Hydraflow Table of Contents Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1-Year Hyrdrographs 3-7 2-Year Hydrographs 8-12 5-Year Hydrographs 13-17 10-Year Hydrographs 18-22 25- Year Hydrographs 23-27 50-Year Hydrographs 28-32 100- Year Hydrographs 33-37 Proposed Condition Pre Detention Hydraflow Table of Contents Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1-Year Hyrdrographs 3-7 2-Year Hydrographs 8-12 5-Year Hydrographs 13-17 10-Year Hydrographs 18-22 25- Year Hydrographs 23-27 50-Year Hydrographs 28-32 100- Year Hydrographs 33-37 Proposed Condition Post Detention Hydraflow Table of Contents Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1-Year Hyrdrographs 3-31 2-Year Hydrographs 32-49 5-Year Hydrographs 50-67 10-Year Hydrographs 68-85 25- Year Hydrographs 86-103 50-Year Hydrographs 104-121 100- Year Hydrographs 122-139 Nitrogen Calculations Appendix II Pipe and Swale Calculations Appendix III Silt Fence Calculations Appendix IV Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 33 of 315 Novo Nordisk Clayton, NC Project Narrative: The project on this site is to construct a new pharmaceutical facility for Novo Nordisk to manufacture an oral tablet to treat type 2 diabetes. The main facility will include four buildings attached within the main plant (Purification, Recovery, Fermentation, and Office Spine). Associated buildings on the site will include a Warehouse, Central Utility Building, Drug Production Building and two guardhouses. Additional improvements to the site include a utility corridor, a new electrical substation, parking lots, and a network of roads. Development of the site is planned in two phases. The current development, Phase 1, will establish the production facility on the eastern portion of the site between the wetlands and the railroad. A future Phase 2 development, not yet determined, will expand the plant west to Powhatan Road. This analysis accounts for anticipated future development and the predicted build out of the facility. Site Description: Pre The site is divided into four drainage areas for analysis; refer to Drainage Maps in Appendix B. The first drainage area flows via sheet flow towards a wetlands area in the center of the site and discharges along the eastern property line. This drainage area is 123.15 acres. The drainage area consisting of primarily canopy trees within a wetland area (40.83 ac.), and agricultural row crops (82.32 ac.), and the weighted Cn for the watershed is 83. The second drainage area is 26.94 acres consisting of primarily canopy trees within a wetland area (2.18 ac.) and agricultural row crops (24.76 ac.), flows via sheet flow west to be collected within the wetland area and slowly flows into a 24” pipe culvert underneath Powhatan Road into an existing stormwater retention pond on the existing Novo Nordisk site. The weighted Cn number for drainage area #2 is 79. The third drainage area consists of 20.59 acres consisting of primarily canopy trees within a wetland area (2.71 ac.) and agricultural row crops (17.62 ac.) flows via sheet flow south to be collected within the wetland area and slowly flows into a culvert underneath the Southern Railroad where it continues south off of the property. The weighted Cn number for drainage area #3 is 80. The fourth drainage area consists of 7.58 acres consisting of primarily agricultural row crops (7.58 ac.) flows via sheet flow southeast off of the property. The weighted Cn number for drainage area #3 is 78. The weighted runoff calculations are located in the Hydrology report in Appendix D Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 34 of 315 Novo Nordisk Clayton, NC Site Description: Post Proposed site build out improvements will be as follows: 15 new buildings (Central Utility Building 1&2, Fermentation 1, Guardhouses 1 & 2, Purification 1-3, Recovery 1&2, Spine 1 & 2, Warehouse 1 & 2, and Drug Production), utility corridor to service the facility, new electrical substation, employee parking lots, underground utilities, and ancillary paved roads surrounding the site. The post development basins are divided to maintain consistency with the pre development basins and the four analysis points, refer to Drainage Maps in Appendix B more details. The first drainage area consists of 126.98 acres. This drainage area consists of undeveloped open area, wetlands (38.61 acres), the Phase 1 portion of the facility, and the new NC DOT Road from Gordan Road (3.44 acres). The undeveloped part of the drainage area will flow via sheet flow towards the wetlands (35.28 acres) and then off- site along the eastern property line. The developed portions of the basin will flow via underground piping to different detention basins. 14.56 acres will be directed into stormwater management basin 2, 36.79 acres will be directed into stormwater management basin 3, and 0.7 acres will flow into the small basin to the east of the warehouse. The outflow from the detention basins will enter the wetlands and flow over land towards the same discharge point along the eastern property line. The weighted Cn number for the analysis is 89 to incorporate future buildout to the site. The second drainage area is 36.60 acres primarily consisting of the future Phase 2 development. Storm water, during construction, will flow via sheet flow to diversion ditches and then flow underground pipes towards Storm Water Management Basin #1. The flow from the basin will exit the outflow structure into the pipe under Powhatan Road and will discharge into the existing stormwater pond on the Novo Nordisk property west of Powhatan Road. The weighted Cn number for the analysis is 90 to incorporate future buildout to the site. The third drainage area is 9.07 acres consisting of parking area and wetlands. 4.24 acres of the area will be directed into to the southwest parking lot basin. 2.66 acres will be directed into the southeast parking lot basin. All stormwater entering the basins will be managed for quantity control prior to release into the wetlands. Storm water will continue through the wetlands into a 36” culvert under the Southern Railroad easement. The weighted Cn number for the analysis is 94. The fourth drainage area consists of 5.35 acres consisting of pervious maintained areas flows via sheet flow southeast off of the property. The weighted Cn number for drainage area #4 is 78. The improved site was evaluated to analyze the effect of the change in land use upon stormwater runoff rates. Per 15A NCAC 02B.0235 and Johnston County regulations, Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 35 of 315 Novo Nordisk Clayton, NC post-development discharge rates shall not exceed pre-development discharge rates for the 1-yr frequency 24-hour duration storm events. Peak runoff rates were calculated for pre-development and post-development conditions. The SCS 24 hour storm was used to develop the hydrology model and predict runoff rates for storms with average return frequencies of 1, 2, 10, 25, and 100 years for pre- and post-development conditions. After analyzing the study area, it shows that post-development flows are below above pre-development rates. Please refer to the summary table below, and the Appendices for detailed information. Table #1 - Peak Runoff Rates Pre Construction:   DA (acres) CN 1-Year (cfs) 2-Year (cfs) 10-Year (cfs) 100-Year (cfs) Pre to DA#1 123.15 83 78.5 108.81 200.05 355.25 Pre to WS #2 26.94 79 26.24 37.8 73.73 136.41 Pre to WS #3 20.59 80 28.69 40.67 77.29 140.21 Pre to WS #4 7.58 78 7.45 10.83 21.52 40.3 Table #2 - Peak Runoff Rates Post Construction (Pre Detention):   DA (acres) CN 1-Year (cfs) 2-Year (cfs) 10-Year (cfs) 100-Year (cfs) Post to DA #1 126.98 89 123.85 161.83 271.44 451.30 Post to WS #2 36.60 90 48.80 63.14 104.17 171.17 Post to WS #3 9.07 94 27.38 34.12 53.13 84.07 Post to WS #4 5.35 78 6.06 8.80 17.41 32.48 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 36 of 315 Novo Nordisk Clayton, NC Table #3 - Peak Runoff Rates Post Construction (Post Detention):   DA (acres) CN 1-Year (cfs) 2-Year (cfs) 10-Year (cfs) 100-Year (cfs) Post DA#1 Detention Outflow 126.98 89 37.95 51.29 90.39 165.42 Post DA#2 Detention Outflow 36.60 90 0.34 3.19 21.35 44.78 Post DA#3 Detention Outflow 9.07 94 10.25 21.12 36.24 81.36 Post DA#4 Detention Outflow 5.35 78 6.06 8.80 17.41 32.48 Table #4 - Percent Reduction Peak Runoff Rates Pre Construction to Post Detention  1-Year 2-Year 10-Year 100-Year DA#1 51.66 52.86 54.82 53.44 DA#2 98.70 91.56 71.04 67.17 DA#3 64.27 48.07 53.11 41.97 DA#4 18.66 18.74 19.10 19.40 Soils Information: Soils for the project watershed area as follows: Goldsboro Sandy loam, 0-2% slopes, Classification B Marlboro Sandy loam, 2-8%, Classification B Marlboro-Cecil Sandy loam, 2-8%, Classification B Norfolk Loamy Sand, 0-2% slopes, Classification A Norfolk Loamy Sand, 2-6% slopes, Classification A Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 37 of 315 Novo Nordisk Clayton, NC Rains Sandy Loam, 0-2% slopes, Classification A/D Toisnot Loam, 0-2% slopes, Classification C/D Varina Loamy Sand, 0-2% slopes, Classification C Varina Loamy Sand, 2-6% slopes, Classification C Refer to Appendix A of the C-SWPPP for further information. FEMA: The proposed disturbance from the project is located in Zone X, a non-flooding area. Refer to Appendix A of the C-SWPPP for FEMA maps. Waters of the State: There are wetlands located upon the site. A permit has been filed with the US Army Corps of Engineers; refer to permit # SAW-2015-02127. Hydrological Analysis: Proposed development conditions will drain to the same 4 drainage areas, although the sizes of the drainage areas may change slightly. An SCS 24-hour storm analysis was performed using Hydraflow 2016 modeling software. Refer to Appendix I for hydrographs. Following is a summary of the data input. Soils: Agricultural Soils (Soils group A), Wetlands (Soils group D) Curve Numbers1: 93 Wetlands 78 Agricultural 98 Pavement & Buildings 85 Gravel 61 Grass (Good condition) 99 Ponds 88 DOT ROW Rainfall Data: 1 Year = 2.89 inches (NOAA Atlas 14) 2 Year = 3.50 inches (Clayton, NC) 5 Year = 4.46 inches 10 Year = 5.24 inches 25 Year = 6.32 inches 50 Year = 7.19 100 Year = 8.11 inches 1 Refer to Hydrographs in Appendix I for Cn calculations Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 38 of 315 Novo Nordisk Clayton, NC Pre Area to DA #1: Total Area: 123.15 Ac. Wetland 40.83 Ac. Agricultural 82.32 Ac. Curve Number: 83 Post Area to DA #1: Total Area: 126.98 Ac. Impervious 28.22 Ac. Pervious 49.39 Ac. Wetlands 38.61 Ac. Ponds 7.33 Ac. ROW 3.44 Ac. Curve Number: 89 Pre Area to DA #2: Total Area: 26.94 acres Wetland 2.18 Ac. Agricultural 24.76 Ac. Curve Number: 79 Post Area to DA #2: Total Area: 36.60 acres Impervious 16.28 Ac. Pervious 17.41 Ac. Ponds 2.91 Ac. Curve Number: 90 Pre Area to DA #3: Total Area: 20.27 acres Wetland 2.71 Ac. Agricultural 17.88 Ac. Curve Number: 80 Post Area to DA #3: Total Area: 7.59 acres Impervious 5.55 Ac. Pervious 1.50 Ac. Wetlands 1.52 Ponds 0.52 Ac. Curve Number: 94 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 39 of 315 Novo Nordisk Clayton, NC Pre Area to DA #4: Total Area: 7.58 acres Wetland 0 Ac. Agricultural 7.58 Ac. Curve Number: 78 Post Area to DA #4: Total Area: 5.35 acres Impervious 0.00 Ac. Pervious 5.35 Ac. Curve Number: 78 Detention Analysis: There are five stormwater management basins on the property serving three of the drainage areas. Three of the basins will be wet basins and two will be dry basins. All will provide peak runoff attenuation. Refer to Appendix I for the hydrographs showing the peak runoff attenuation. The ponds have been designed to handle a 10 year storm with a foot of freeboard. The ponds have been routed for the 100 year storm and all ponds contain the 100 year storm with at least ½’ of freeboard. One drainage area does not have a stormwater management basin since it is to be returned to an undeveloped state after construction. Detention Waiver: The site does not qualify for a detention waiver as the final constructed condition will have an increase peak runoff discharges from the pre-development existing conditions. Five retention/detention basins have been proposed to reduce peak runoff and volume. Per 15A NCAC 02B.0235 and Johnston County regulations, post-development discharge rates do not exceed pre-development discharge rates for the 1-yr frequency 24-hour duration storm events. Permanent Water Quality: No post construction water quality is required for this project. An analysis indicates that the nitrogen released was managed to 3.93 and 5.78 pounds of nitrogen per acre per year, for the Phase 1 and Phase 2 development, respectively. The nitrogen export from the site is under the limit of 10 lbs/ac/year required by 15A NCAC 02B.0235. Refer to the calculation in Appendix II of the Hydrology report. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 40 of 315 Novo Nordisk Clayton, NC Wet detention ponds have been incorporated into the design of the site in order to remove total suspended solids. The three wet detention ponds will remove 90% TSS. Surface area to drainage area ratios are provided in the table below. Surface Area (acres) Drainage Area (acres) Provided SA/DA (%) Required SA/DA (%) Pond #1 (A&B) 1.30 35.8 3.63 3.5 Pond #2 0.91 14.93 6.07 3.2 Pond #3 2.88 39.48 7.30 2.4 All three ponds exceed the required SA/DA ratios prescribed be NCDEQ for 90% TSS removal. Sedimentology: Silt fence will encompass the perimeter of the project in order to prevent sediment from entering the wetlands or off site. The silt fence which is solely being used for sediment control has been designed to handle ¼ acre per 100 feet of silt fence. A double row of silt fence has been incorporated within the site along the wetland boarders. The double row of silt fence provides an 86% trapping rate which is greater than the 54% provided by a 75’ filter strip. In addition to the silt fence, the site has been designed with 3 wet detention basins and 2 dry basins which will double as sediment basins during construction. Four sediment traps have been designed for use on the site as well, with each area trapping 5 acres of runoff and designed to hold 3,600 cu/ft of sediment per acre. The requirements for a sediment basin, per the NC DENR BMP Manual, are the basin needs to store 1,800 cu-ft of sediment per contributing acre. Refer to table below for basin details. Contributing Area (acres) Volume Provided (cu-ft) Volume Required (cu-ft) Basin 1 (wet) 35.8 196,357 64,440 Basin 2 (wet) 14.93 209,362 26,874 Basin 3 (wet) 35.29 919,626 63,522 Basin 4 (SW dry) 4.24 9,038 7,632 Basin 5 (SE dry) 2.66 7,472 4,680 Navigable Waters: There are no navigable waters on the property. Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 41 of 315 Novo Nordisk Clayton, NC Appendix I Hydrographs Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 42 of 315 Novo Nordisk Clayton, NC Existing Conditions Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 43 of 315 Hydraflow Table of Contents Novo Nordisk Existing.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year Summary Report......................................................................................................................... 3 Hydrograph Reports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Existing Watershed #1.......................................................... 4 Hydrograph No. 2, SCS Runoff, Existing Watershed #2.......................................................... 5 Hydrograph No. 3, SCS Runoff, Existing Watershed #3 - South under RR............................. 6 Hydrograph No. 4, SCS Runoff, Existing Watershed #4.......................................................... 7 2 - Year Summary Report......................................................................................................................... 8 Hydrograph Reports................................................................................................................... 9 Hydrograph No. 1, SCS Runoff, Existing Watershed #1.......................................................... 9 Hydrograph No. 2, SCS Runoff, Existing Watershed #2........................................................ 10 Hydrograph No. 3, SCS Runoff, Existing Watershed #3 - South under RR........................... 11 Hydrograph No. 4, SCS Runoff, Existing Watershed #4........................................................ 12 5 - Year Summary Report....................................................................................................................... 13 Hydrograph Reports................................................................................................................. 14 Hydrograph No. 1, SCS Runoff, Existing Watershed #1........................................................ 14 Hydrograph No. 2, SCS Runoff, Existing Watershed #2........................................................ 15 Hydrograph No. 3, SCS Runoff, Existing Watershed #3 - South under RR........................... 16 Hydrograph No. 4, SCS Runoff, Existing Watershed #4........................................................ 17 10 - Year Summary Report....................................................................................................................... 18 Hydrograph Reports................................................................................................................. 19 Hydrograph No. 1, SCS Runoff, Existing Watershed #1........................................................ 19 Hydrograph No. 2, SCS Runoff, Existing Watershed #2........................................................ 20 Hydrograph No. 3, SCS Runoff, Existing Watershed #3 - South under RR........................... 21 Hydrograph No. 4, SCS Runoff, Existing Watershed #4........................................................ 22 25 - Year Summary Report....................................................................................................................... 23 Hydrograph Reports................................................................................................................. 24 Hydrograph No. 1, SCS Runoff, Existing Watershed #1........................................................ 24 Hydrograph No. 2, SCS Runoff, Existing Watershed #2........................................................ 25 Hydrograph No. 3, SCS Runoff, Existing Watershed #3 - South under RR........................... 26 Hydrograph No. 4, SCS Runoff, Existing Watershed #4........................................................ 27 50 - Year Summary Report....................................................................................................................... 28 Hydrograph Reports................................................................................................................. 29 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 44 of 315 Contents continued...Novo Nordisk Existing.gpw Hydrograph No. 1, SCS Runoff, Existing Watershed #1........................................................ 29 Hydrograph No. 2, SCS Runoff, Existing Watershed #2........................................................ 30 Hydrograph No. 3, SCS Runoff, Existing Watershed #3 - South under RR........................... 31 Hydrograph No. 4, SCS Runoff, Existing Watershed #4........................................................ 32 100 - Year Summary Report....................................................................................................................... 33 Hydrograph Reports................................................................................................................. 34 Hydrograph No. 1, SCS Runoff, Existing Watershed #1........................................................ 34 Hydrograph No. 2, SCS Runoff, Existing Watershed #2........................................................ 35 Hydrograph No. 3, SCS Runoff, Existing Watershed #3 - South under RR........................... 36 Hydrograph No. 4, SCS Runoff, Existing Watershed #4........................................................ 37 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 45 of 315 1234 1 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Project: Novo Nordisk Existing.gpw Friday, 09 / 22 / 2017 Hyd.Origin Description Legend 1 SCS Runoff Existing Watershed #1 2 SCS Runoff Existing Watershed #2 3 SCS Runoff Existing Watershed #3 - South under RR 4 SCS Runoff Existing Watershed #4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 46 of 315 Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs)Hydrograph No. type hyd(s)Description (origin)1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 78.50 108.80 ------- 158.58 200.05 258.17 305.31 355.25 Existing Watershed #1 2 SCS Runoff ------ 26.24 37.80 ------- 57.25 73.73 97.09 116.15 136.41 Existing Watershed #2 3 SCS Runoff ------ 28.32 40.16 ------- 59.82 76.32 99.55 118.43 138.44 Existing Watershed #3 - South under 4 SCS Runoff ------ 7.450 10.83 ------- 16.61 21.52 28.51 34.22 40.30 Existing Watershed #4 Proj. file: Novo Nordisk Existing.gpw Friday, 09 / 22 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 47 of 315 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 78.50 1 759 607,311 ------ ------------ Existing Watershed #1 2 SCS Runoff 26.24 1 732 108,421 ------ ------------ Existing Watershed #2 3 SCS Runoff 28.32 1 724 85,225 ------ ------------ Existing Watershed #3 - South under 4 SCS Runoff 7.450 2 730 28,472 ------ ------------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 1 Year Friday, 09 / 22 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 48 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 78.50 cfs Storm frequency = 1 yrs Time to peak = 759 min Time interval = 1 min Hyd. volume = 607,311 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5 % Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 4 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) Existing Watershed #1 Hyd. No. 1 -- 1 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 49 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 26.24 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 1 min Hyd. volume = 108,421 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6 % Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] / 26.940 5 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (min) Existing Watershed #2 Hyd. No. 2 -- 1 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 50 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 3 Existing Watershed #3 - South under RR Hydrograph type = SCS Runoff Peak discharge = 28.32 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 85,225 cuft Drainage area = 20.330 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.330 6 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 Q (cfs) Time (min) Existing Watershed #3 - South under RR Hyd. No. 3 -- 1 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 51 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 7.450 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 28,472 cuft Drainage area = 7.580 ac Curve number = 78 Basin Slope = 0.8 % Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 7 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 Q (cfs) Time (min) Existing Watershed #4 Hyd. No. 4 -- 1 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 52 of 315 Hydrograph Summary Report 8 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 108.80 1 759 830,841 ------ ------------ Existing Watershed #1 2 SCS Runoff 37.80 1 732 153,141 ------ ------------ Existing Watershed #2 3 SCS Runoff 40.16 1 724 119,388 ------ ------------ Existing Watershed #3 - South under 4 SCS Runoff 10.83 2 730 40,557 ------ ------------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 2 Year Friday, 09 / 22 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 53 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 108.80 cfs Storm frequency = 2 yrs Time to peak = 759 min Time interval = 1 min Hyd. volume = 830,841 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5 % Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 9 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) Existing Watershed #1 Hyd. No. 1 -- 2 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 54 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 37.80 cfs Storm frequency = 2 yrs Time to peak = 732 min Time interval = 1 min Hyd. volume = 153,141 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6 % Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] / 26.940 10 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (min) Existing Watershed #2 Hyd. No. 2 -- 2 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 55 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 3 Existing Watershed #3 - South under RR Hydrograph type = SCS Runoff Peak discharge = 40.16 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 119,388 cuft Drainage area = 20.330 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.330 11 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (min) Existing Watershed #3 - South under RR Hyd. No. 3 -- 2 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 56 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 10.83 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 40,557 cuft Drainage area = 7.580 ac Curve number = 78 Basin Slope = 0.8 % Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 12 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (min) Existing Watershed #4 Hyd. No. 4 -- 2 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 57 of 315 Hydrograph Summary Report 13 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 158.58 1 759 1,202,546 ------ ------------ Existing Watershed #1 2 SCS Runoff 57.25 1 731 229,121 ------ ------------ Existing Watershed #2 3 SCS Runoff 59.82 1 724 177,108 ------ ------------ Existing Watershed #3 - South under 4 SCS Runoff 16.61 2 728 61,209 ------ ------------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 5 Year Friday, 09 / 22 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 58 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 158.58 cfs Storm frequency = 5 yrs Time to peak = 759 min Time interval = 1 min Hyd. volume = 1,202,546 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5 % Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 14 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (min) Existing Watershed #1 Hyd. No. 1 -- 5 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 59 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 57.25 cfs Storm frequency = 5 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 229,121 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6 % Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] / 26.940 15 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (min) Existing Watershed #2 Hyd. No. 2 -- 5 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 60 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 3 Existing Watershed #3 - South under RR Hydrograph type = SCS Runoff Peak discharge = 59.82 cfs Storm frequency = 5 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 177,108 cuft Drainage area = 20.330 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.330 16 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (min) Existing Watershed #3 - South under RR Hyd. No. 3 -- 5 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 61 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 16.61 cfs Storm frequency = 5 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 61,209 cuft Drainage area = 7.580 ac Curve number = 78 Basin Slope = 0.8 % Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 17 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) Existing Watershed #4 Hyd. No. 4 -- 5 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 62 of 315 Hydrograph Summary Report 18 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 200.05 1 759 1,516,362 ------ ------------ Existing Watershed #1 2 SCS Runoff 73.73 1 731 294,291 ------ ------------ Existing Watershed #2 3 SCS Runoff 76.32 1 724 226,412 ------ ------------ Existing Watershed #3 - South under 4 SCS Runoff 21.52 2 728 78,997 ------ ------------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 10 Year Friday, 09 / 22 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 63 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 200.05 cfs Storm frequency = 10 yrs Time to peak = 759 min Time interval = 1 min Hyd. volume = 1,516,362 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5 % Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 19 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (min) Existing Watershed #1 Hyd. No. 1 -- 10 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 64 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 73.73 cfs Storm frequency = 10 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 294,291 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6 % Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] / 26.940 20 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) Existing Watershed #2 Hyd. No. 2 -- 10 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 65 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 3 Existing Watershed #3 - South under RR Hydrograph type = SCS Runoff Peak discharge = 76.32 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 226,412 cuft Drainage area = 20.330 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.330 21 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) Existing Watershed #3 - South under RR Hyd. No. 3 -- 10 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 66 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 21.52 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 78,997 cuft Drainage area = 7.580 ac Curve number = 78 Basin Slope = 0.8 % Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 22 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (min) Existing Watershed #4 Hyd. No. 4 -- 10 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 67 of 315 Hydrograph Summary Report 23 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 258.17 1 759 1,962,161 ------ ------------ Existing Watershed #1 2 SCS Runoff 97.09 1 731 387,911 ------ ------------ Existing Watershed #2 3 SCS Runoff 99.55 1 724 297,032 ------ ------------ Existing Watershed #3 - South under 4 SCS Runoff 28.51 2 728 104,630 ------ ------------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 25 Year Friday, 09 / 22 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 68 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 258.17 cfs Storm frequency = 25 yrs Time to peak = 759 min Time interval = 1 min Hyd. volume = 1,962,161 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5 % Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 24 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (min) Existing Watershed #1 Hyd. No. 1 -- 25 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 69 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 97.09 cfs Storm frequency = 25 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 387,911 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6 % Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] / 26.940 25 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 100.00 100.00 Q (cfs) Time (min) Existing Watershed #2 Hyd. No. 2 -- 25 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 70 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 3 Existing Watershed #3 - South under RR Hydrograph type = SCS Runoff Peak discharge = 99.55 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 297,032 cuft Drainage area = 20.330 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.330 26 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 Q (cfs) Time (min) Existing Watershed #3 - South under RR Hyd. No. 3 -- 25 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 71 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 28.51 cfs Storm frequency = 25 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 104,630 cuft Drainage area = 7.580 ac Curve number = 78 Basin Slope = 0.8 % Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 27 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 Q (cfs) Time (min) Existing Watershed #4 Hyd. No. 4 -- 25 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 72 of 315 Hydrograph Summary Report 28 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 305.31 1 758 2,327,860 ------ ------------ Existing Watershed #1 2 SCS Runoff 116.15 1 731 465,352 ------ ------------ Existing Watershed #2 3 SCS Runoff 118.43 1 724 355,318 ------ ------------ Existing Watershed #3 - South under 4 SCS Runoff 34.22 2 728 125,881 ------ ------------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 50 Year Friday, 09 / 22 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 73 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 305.31 cfs Storm frequency = 50 yrs Time to peak = 758 min Time interval = 1 min Hyd. volume = 2,327,860 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5 % Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 29 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 320.00 320.00 Q (cfs) Time (min) Existing Watershed #1 Hyd. No. 1 -- 50 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 74 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 116.15 cfs Storm frequency = 50 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 465,352 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6 % Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] / 26.940 30 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) Existing Watershed #2 Hyd. No. 2 -- 50 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 75 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 3 Existing Watershed #3 - South under RR Hydrograph type = SCS Runoff Peak discharge = 118.43 cfs Storm frequency = 50 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 355,318 cuft Drainage area = 20.330 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.330 31 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) Existing Watershed #3 - South under RR Hyd. No. 3 -- 50 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 76 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 34.22 cfs Storm frequency = 50 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 125,881 cuft Drainage area = 7.580 ac Curve number = 78 Basin Slope = 0.8 % Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 32 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (min) Existing Watershed #4 Hyd. No. 4 -- 50 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 77 of 315 Hydrograph Summary Report 33 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 355.25 1 758 2,719,086 ------ ------------ Existing Watershed #1 2 SCS Runoff 136.41 1 731 548,654 ------ ------------ Existing Watershed #2 3 SCS Runoff 138.44 1 724 417,925 ------ ------------ Existing Watershed #3 - South under 4 SCS Runoff 40.30 2 728 148,775 ------ ------------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 100 Year Friday, 09 / 22 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 78 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 355.25 cfs Storm frequency = 100 yrs Time to peak = 758 min Time interval = 1 min Hyd. volume = 2,719,086 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5 % Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 34 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 400.00 400.00 Q (cfs) Time (min) Existing Watershed #1 Hyd. No. 1 -- 100 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 79 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 136.41 cfs Storm frequency = 100 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 548,654 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6 % Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] / 26.940 35 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) Existing Watershed #2 Hyd. No. 2 -- 100 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 80 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 3 Existing Watershed #3 - South under RR Hydrograph type = SCS Runoff Peak discharge = 138.44 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 417,925 cuft Drainage area = 20.330 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.330 36 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) Existing Watershed #3 - South under RR Hyd. No. 3 -- 100 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 81 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Friday, 09 / 22 / 2017 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 40.30 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 148,775 cuft Drainage area = 7.580 ac Curve number = 78 Basin Slope = 0.8 % Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 37 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (min) Existing Watershed #4 Hyd. No. 4 -- 100 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 82 of 315 Novo Nordisk Clayton, NC Proposed Conditions Pre-Detention Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 83 of 315 Hydraflow Table of Contents Novo Nordisk Proposed1.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year Summary Report......................................................................................................................... 3 Hydrograph Reports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Proposed DA#1..................................................................... 4 Hydrograph No. 2, SCS Runoff, Proposed DA#2..................................................................... 5 Hydrograph No. 3, SCS Runoff, Proposed DA#3..................................................................... 6 Hydrograph No. 4, SCS Runoff, Proposed DA#4..................................................................... 7 2 - Year Summary Report......................................................................................................................... 8 Hydrograph Reports................................................................................................................... 9 Hydrograph No. 1, SCS Runoff, Proposed DA#1..................................................................... 9 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 10 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 11 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 12 5 - Year Summary Report....................................................................................................................... 13 Hydrograph Reports................................................................................................................. 14 Hydrograph No. 1, SCS Runoff, Proposed DA#1................................................................... 14 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 15 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 16 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 17 10 - Year Summary Report....................................................................................................................... 18 Hydrograph Reports................................................................................................................. 19 Hydrograph No. 1, SCS Runoff, Proposed DA#1................................................................... 19 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 20 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 21 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 22 25 - Year Summary Report....................................................................................................................... 23 Hydrograph Reports................................................................................................................. 24 Hydrograph No. 1, SCS Runoff, Proposed DA#1................................................................... 24 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 25 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 26 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 27 50 - Year Summary Report....................................................................................................................... 28 Hydrograph Reports................................................................................................................. 29 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 84 of 315 Contents continued...Novo Nordisk Proposed1.gpw Hydrograph No. 1, SCS Runoff, Proposed DA#1................................................................... 29 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 30 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 31 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 32 100 - Year Summary Report....................................................................................................................... 33 Hydrograph Reports................................................................................................................. 34 Hydrograph No. 1, SCS Runoff, Proposed DA#1................................................................... 34 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 35 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 36 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 37 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 85 of 315 1234 1 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Project: Novo Nordisk Proposed1.gpw Monday, 09 / 25 / 2017Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 86 of 315 Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs)Hydrograph No. type hyd(s)Description (origin)1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 123.85 161.83 ------- 222.26 271.44 339.38 393.89 451.30 Proposed DA#1 2 SCS Runoff ------ 48.80 63.14 ------- 85.79 104.17 129.49 149.80 171.17 Proposed DA#2 3 SCS Runoff ------ 27.38 34.12 ------- 44.64 53.13 64.82 74.19 84.07 Proposed DA#3 4 SCS Runoff ------ 6.061 8.803 ------- 13.46 17.41 23.02 27.60 32.48 Proposed DA#4 Proj. file: Novo Nordisk Proposed1.gpw Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 87 of 315 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 123.85 1 752 827,274 ------ ------------ Proposed DA#1 2 SCS Runoff 48.80 1 739 249,017 ------ ------------ Proposed DA#2 3 SCS Runoff 27.38 1 721 72,722 ------ ------------ Proposed DA#3 4 SCS Runoff 6.061 1 727 20,611 ------ ------------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 1 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 88 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 123.85 cfs Storm frequency = 1 yrs Time to peak = 12.53 hrs Time interval = 1 min Hyd. volume = 827,274 cuft Drainage area = 126.980 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(28.310 x 98) + (50.900 x 78) + (38.610 x 93) + (7.330 x 100) + (3.440 x 89)] / 126.980 4 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) Proposed DA#1 Hyd. No. 1 -- 1 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 89 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 48.80 cfs Storm frequency = 1 yrs Time to peak = 12.32 hrs Time interval = 1 min Hyd. volume = 249,017 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.790 x 98) + (11.100 x 78) + (2.910 x 100)] / 36.600 5 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) Proposed DA#2 Hyd. No. 2 -- 1 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 90 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 27.38 cfs Storm frequency = 1 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 72,722 cuft Drainage area = 9.070 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.540 x 98) + (1.010 x 78) + (1.520 x 93) + (0.520 x 100)] / 9.070 6 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) Proposed DA#3 Hyd. No. 3 -- 1 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 91 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 6.061 cfs Storm frequency = 1 yrs Time to peak = 12.12 hrs Time interval = 1 min Hyd. volume = 20,611 cuft Drainage area = 5.350 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(5.350 x 78)] / 5.350 7 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (hrs) Proposed DA#4 Hyd. No. 4 -- 1 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 92 of 315 Hydrograph Summary Report 8 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 161.83 1 751 1,082,933 ------ ------------ Proposed DA#1 2 SCS Runoff 63.14 1 739 323,668 ------ ------------ Proposed DA#2 3 SCS Runoff 34.12 1 721 91,902 ------ ------------ Proposed DA#3 4 SCS Runoff 8.803 1 726 29,359 ------ ------------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 2 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 93 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 161.83 cfs Storm frequency = 2 yrs Time to peak = 12.52 hrs Time interval = 1 min Hyd. volume = 1,082,933 cuft Drainage area = 126.980 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(28.310 x 98) + (50.900 x 78) + (38.610 x 93) + (7.330 x 100) + (3.440 x 89)] / 126.980 9 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 180.00 180.00 Q (cfs) Time (hrs) Proposed DA#1 Hyd. No. 1 -- 2 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 94 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 63.14 cfs Storm frequency = 2 yrs Time to peak = 12.32 hrs Time interval = 1 min Hyd. volume = 323,668 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.790 x 98) + (11.100 x 78) + (2.910 x 100)] / 36.600 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) Proposed DA#2 Hyd. No. 2 -- 2 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 95 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 34.12 cfs Storm frequency = 2 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 91,902 cuft Drainage area = 9.070 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.540 x 98) + (1.010 x 78) + (1.520 x 93) + (0.520 x 100)] / 9.070 11 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) Proposed DA#3 Hyd. No. 3 -- 2 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 96 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 8.803 cfs Storm frequency = 2 yrs Time to peak = 12.10 hrs Time interval = 1 min Hyd. volume = 29,359 cuft Drainage area = 5.350 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(5.350 x 78)] / 5.350 12 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) Proposed DA#4 Hyd. No. 4 -- 2 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 97 of 315 Hydrograph Summary Report 13 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 222.26 1 751 1,496,430 ------ ------------ Proposed DA#1 2 SCS Runoff 85.79 1 739 443,923 ------ ------------ Proposed DA#2 3 SCS Runoff 44.64 1 721 122,379 ------ ------------ Proposed DA#3 4 SCS Runoff 13.46 1 726 44,309 ------ ------------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 5 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 98 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 222.26 cfs Storm frequency = 5 yrs Time to peak = 12.52 hrs Time interval = 1 min Hyd. volume = 1,496,430 cuft Drainage area = 126.980 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(28.310 x 98) + (50.900 x 78) + (38.610 x 93) + (7.330 x 100) + (3.440 x 89)] / 126.980 14 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 240.00 240.00 Q (cfs) Time (hrs) Proposed DA#1 Hyd. No. 1 -- 5 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 99 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 85.79 cfs Storm frequency = 5 yrs Time to peak = 12.32 hrs Time interval = 1 min Hyd. volume = 443,923 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.790 x 98) + (11.100 x 78) + (2.910 x 100)] / 36.600 15 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) Proposed DA#2 Hyd. No. 2 -- 5 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 100 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 44.64 cfs Storm frequency = 5 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 122,379 cuft Drainage area = 9.070 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.540 x 98) + (1.010 x 78) + (1.520 x 93) + (0.520 x 100)] / 9.070 16 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) Proposed DA#3 Hyd. No. 3 -- 5 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 101 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 13.46 cfs Storm frequency = 5 yrs Time to peak = 12.10 hrs Time interval = 1 min Hyd. volume = 44,309 cuft Drainage area = 5.350 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(5.350 x 78)] / 5.350 17 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (hrs) Proposed DA#4 Hyd. No. 4 -- 5 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 102 of 315 Hydrograph Summary Report 18 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 271.44 1 751 1,838,649 ------ ------------ Proposed DA#1 2 SCS Runoff 104.17 1 739 543,170 ------ ------------ Proposed DA#2 3 SCS Runoff 53.13 1 721 147,298 ------ ------------ Proposed DA#3 4 SCS Runoff 17.41 1 726 57,186 ------ ------------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 10 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 103 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 271.44 cfs Storm frequency = 10 yrs Time to peak = 12.52 hrs Time interval = 1 min Hyd. volume = 1,838,649 cuft Drainage area = 126.980 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(28.310 x 98) + (50.900 x 78) + (38.610 x 93) + (7.330 x 100) + (3.440 x 89)] / 126.980 19 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (hrs) Proposed DA#1 Hyd. No. 1 -- 10 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 104 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 104.17 cfs Storm frequency = 10 yrs Time to peak = 12.32 hrs Time interval = 1 min Hyd. volume = 543,170 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.790 x 98) + (11.100 x 78) + (2.910 x 100)] / 36.600 20 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) Proposed DA#2 Hyd. No. 2 -- 10 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 105 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 53.13 cfs Storm frequency = 10 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 147,298 cuft Drainage area = 9.070 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.540 x 98) + (1.010 x 78) + (1.520 x 93) + (0.520 x 100)] / 9.070 21 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) Proposed DA#3 Hyd. No. 3 -- 10 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 106 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 17.41 cfs Storm frequency = 10 yrs Time to peak = 12.10 hrs Time interval = 1 min Hyd. volume = 57,186 cuft Drainage area = 5.350 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(5.350 x 78)] / 5.350 22 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) Proposed DA#4 Hyd. No. 4 -- 10 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 107 of 315 Hydrograph Summary Report 23 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 339.38 1 751 2,318,174 ------ ------------ Proposed DA#1 2 SCS Runoff 129.49 1 739 681,978 ------ ------------ Proposed DA#2 3 SCS Runoff 64.82 1 721 181,938 ------ ------------ Proposed DA#3 4 SCS Runoff 23.02 1 726 75,742 ------ ------------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 25 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 108 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 339.38 cfs Storm frequency = 25 yrs Time to peak = 12.52 hrs Time interval = 1 min Hyd. volume = 2,318,174 cuft Drainage area = 126.980 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(28.310 x 98) + (50.900 x 78) + (38.610 x 93) + (7.330 x 100) + (3.440 x 89)] / 126.980 24 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 Q (cfs) Time (hrs) Proposed DA#1 Hyd. No. 1 -- 25 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 109 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 129.49 cfs Storm frequency = 25 yrs Time to peak = 12.32 hrs Time interval = 1 min Hyd. volume = 681,978 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.790 x 98) + (11.100 x 78) + (2.910 x 100)] / 36.600 25 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) Proposed DA#2 Hyd. No. 2 -- 25 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 110 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 64.82 cfs Storm frequency = 25 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 181,938 cuft Drainage area = 9.070 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.540 x 98) + (1.010 x 78) + (1.520 x 93) + (0.520 x 100)] / 9.070 26 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) Proposed DA#3 Hyd. No. 3 -- 25 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 111 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 23.02 cfs Storm frequency = 25 yrs Time to peak = 12.10 hrs Time interval = 1 min Hyd. volume = 75,742 cuft Drainage area = 5.350 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(5.350 x 78)] / 5.350 27 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) Proposed DA#4 Hyd. No. 4 -- 25 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 112 of 315 Hydrograph Summary Report 28 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 393.89 1 751 2,707,657 ------ ------------ Proposed DA#1 2 SCS Runoff 149.80 1 739 794,569 ------ ------------ Proposed DA#2 3 SCS Runoff 74.19 1 721 209,916 ------ ------------ Proposed DA#3 4 SCS Runoff 27.60 1 726 91,125 ------ ------------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 50 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 113 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 393.89 cfs Storm frequency = 50 yrs Time to peak = 12.52 hrs Time interval = 1 min Hyd. volume = 2,707,657 cuft Drainage area = 126.980 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(28.310 x 98) + (50.900 x 78) + (38.610 x 93) + (7.330 x 100) + (3.440 x 89)] / 126.980 29 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 60.00 60.00 120.00 120.00 180.00 180.00 240.00 240.00 300.00 300.00 360.00 360.00 420.00 420.00 Q (cfs) Time (hrs) Proposed DA#1 Hyd. No. 1 -- 50 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 114 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 149.80 cfs Storm frequency = 50 yrs Time to peak = 12.32 hrs Time interval = 1 min Hyd. volume = 794,569 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.790 x 98) + (11.100 x 78) + (2.910 x 100)] / 36.600 30 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) Proposed DA#2 Hyd. No. 2 -- 50 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 115 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 74.19 cfs Storm frequency = 50 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 209,916 cuft Drainage area = 9.070 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.540 x 98) + (1.010 x 78) + (1.520 x 93) + (0.520 x 100)] / 9.070 31 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) Proposed DA#3 Hyd. No. 3 -- 50 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 116 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 27.60 cfs Storm frequency = 50 yrs Time to peak = 12.10 hrs Time interval = 1 min Hyd. volume = 91,125 cuft Drainage area = 5.350 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(5.350 x 78)] / 5.350 32 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) Proposed DA#4 Hyd. No. 4 -- 50 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 117 of 315 Hydrograph Summary Report 33 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 451.30 1 751 3,121,645 ------ ------------ Proposed DA#1 2 SCS Runoff 171.17 1 739 914,145 ------ ------------ Proposed DA#2 3 SCS Runoff 84.07 1 721 239,550 ------ ------------ Proposed DA#3 4 SCS Runoff 32.48 1 726 107,699 ------ ------------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 100 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 118 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 451.30 cfs Storm frequency = 100 yrs Time to peak = 12.52 hrs Time interval = 1 min Hyd. volume = 3,121,645 cuft Drainage area = 126.980 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(28.310 x 98) + (50.900 x 78) + (38.610 x 93) + (7.330 x 100) + (3.440 x 89)] / 126.980 34 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 60.00 60.00 120.00 120.00 180.00 180.00 240.00 240.00 300.00 300.00 360.00 360.00 420.00 420.00 480.00 480.00 Q (cfs) Time (hrs) Proposed DA#1 Hyd. No. 1 -- 100 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 119 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 171.17 cfs Storm frequency = 100 yrs Time to peak = 12.32 hrs Time interval = 1 min Hyd. volume = 914,145 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.790 x 98) + (11.100 x 78) + (2.910 x 100)] / 36.600 35 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 180.00 180.00 Q (cfs) Time (hrs) Proposed DA#2 Hyd. No. 2 -- 100 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 120 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 84.07 cfs Storm frequency = 100 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 239,550 cuft Drainage area = 9.070 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.540 x 98) + (1.010 x 78) + (1.520 x 93) + (0.520 x 100)] / 9.070 36 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) Proposed DA#3 Hyd. No. 3 -- 100 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 121 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 32.48 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 1 min Hyd. volume = 107,699 cuft Drainage area = 5.350 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(5.350 x 78)] / 5.350 37 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) Proposed DA#4 Hyd. No. 4 -- 100 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 122 of 315 Novo Nordisk Clayton, NC Proposed Conditions Post-Detention Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 123 of 315 Hydraflow Table of Contents Novo Nordisk Proposed wbasins Rev 6JWH.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year Summary Report......................................................................................................................... 3 Hydrograph Reports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Post Dev Analysis Pt#4......................................................... 4 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin #1............................................................... 5 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin #2............................................................... 6 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin #3............................................................... 7 Hydrograph No. 5, SCS Runoff, DA#1 Sub Basin #4............................................................... 8 Hydrograph No. 6, SCS Runoff, DA #3 Sub Basin #1.............................................................. 9 Hydrograph No. 7, SCS Runoff, DA #3 Sub Basin #2............................................................ 10 Hydrograph No. 8, SCS Runoff, DA #3 Sub Basin #3............................................................ 11 Hydrograph No. 9, Reservoir, SWMB#3................................................................................ 12 Hydrograph No. 10, Reservoir, SWMB#2.............................................................................. 13 Hydrograph No. 11, Reservoir, WAREHOUSE POND........................................................... 14 Hydrograph No. 12, Reservoir, SW PKLOT POND................................................................ 15 Hydrograph No. 13, Reservoir, SE PKLOT POND................................................................. 16 Hydrograph No. 14, Combine, Post Dev Analysis Pt#1......................................................... 17 Hydrograph No. 15, SCS Runoff, Proposed Drainage Area #2............................................. 18 Hydrograph No. 16, Reservoir, Post Dev Analysis Pt#2........................................................ 19 Hydrograph No. 17, Combine, Post Dev Analysis Pt#3......................................................... 20 2 - Year Summary Report....................................................................................................................... 21 Hydrograph Reports................................................................................................................. 22 Hydrograph No. 1, SCS Runoff, Post Dev Analysis Pt#4....................................................... 22 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin #1............................................................. 23 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin #2............................................................. 24 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin #3............................................................. 25 Hydrograph No. 5, SCS Runoff, DA#1 Sub Basin #4............................................................. 26 Hydrograph No. 6, SCS Runoff, DA #3 Sub Basin #1............................................................ 27 Hydrograph No. 7, SCS Runoff, DA #3 Sub Basin #2............................................................ 28 Hydrograph No. 8, SCS Runoff, DA #3 Sub Basin #3............................................................ 29 Hydrograph No. 9, Reservoir, SWMB#3................................................................................ 30 Hydrograph No. 10, Reservoir, SWMB#2.............................................................................. 31 Hydrograph No. 11, Reservoir, WAREHOUSE POND........................................................... 32 Hydrograph No. 12, Reservoir, SW PKLOT POND................................................................ 33 Hydrograph No. 13, Reservoir, SE PKLOT POND................................................................. 34 Hydrograph No. 14, Combine, Post Dev Analysis Pt#1......................................................... 35 Hydrograph No. 15, SCS Runoff, Proposed Drainage Area #2............................................. 36 Hydrograph No. 16, Reservoir, Post Dev Analysis Pt#2........................................................ 37 Hydrograph No. 17, Combine, Post Dev Analysis Pt#3......................................................... 38 5 - Year Summary Report....................................................................................................................... 39Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 124 of 315 Contents continued...Novo Nordisk Proposed wbasins Rev 6JWH.gpw Hydrograph Reports................................................................................................................. 40 Hydrograph No. 1, SCS Runoff, Post Dev Analysis Pt#4....................................................... 40 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin #1............................................................. 41 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin #2............................................................. 42 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin #3............................................................. 43 Hydrograph No. 5, SCS Runoff, DA#1 Sub Basin #4............................................................. 44 Hydrograph No. 6, SCS Runoff, DA #3 Sub Basin #1............................................................ 45 Hydrograph No. 7, SCS Runoff, DA #3 Sub Basin #2............................................................ 46 Hydrograph No. 8, SCS Runoff, DA #3 Sub Basin #3............................................................ 47 Hydrograph No. 9, Reservoir, SWMB#3................................................................................ 48 Hydrograph No. 10, Reservoir, SWMB#2.............................................................................. 49 Hydrograph No. 11, Reservoir, WAREHOUSE POND........................................................... 50 Hydrograph No. 12, Reservoir, SW PKLOT POND................................................................ 51 Hydrograph No. 13, Reservoir, SE PKLOT POND................................................................. 52 Hydrograph No. 14, Combine, Post Dev Analysis Pt#1......................................................... 53 Hydrograph No. 15, SCS Runoff, Proposed Drainage Area #2............................................. 54 Hydrograph No. 16, Reservoir, Post Dev Analysis Pt#2........................................................ 55 Hydrograph No. 17, Combine, Post Dev Analysis Pt#3......................................................... 56 10 - Year Summary Report....................................................................................................................... 57 Hydrograph Reports................................................................................................................. 58 Hydrograph No. 1, SCS Runoff, Post Dev Analysis Pt#4....................................................... 58 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin #1............................................................. 59 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin #2............................................................. 60 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin #3............................................................. 61 Hydrograph No. 5, SCS Runoff, DA#1 Sub Basin #4............................................................. 62 Hydrograph No. 6, SCS Runoff, DA #3 Sub Basin #1............................................................ 63 Hydrograph No. 7, SCS Runoff, DA #3 Sub Basin #2............................................................ 64 Hydrograph No. 8, SCS Runoff, DA #3 Sub Basin #3............................................................ 65 Hydrograph No. 9, Reservoir, SWMB#3................................................................................ 66 Hydrograph No. 10, Reservoir, SWMB#2.............................................................................. 67 Hydrograph No. 11, Reservoir, WAREHOUSE POND........................................................... 68 Hydrograph No. 12, Reservoir, SW PKLOT POND................................................................ 69 Hydrograph No. 13, Reservoir, SE PKLOT POND................................................................. 70 Hydrograph No. 14, Combine, Post Dev Analysis Pt#1......................................................... 71 Hydrograph No. 15, SCS Runoff, Proposed Drainage Area #2............................................. 72 Hydrograph No. 16, Reservoir, Post Dev Analysis Pt#2........................................................ 73 Hydrograph No. 17, Combine, Post Dev Analysis Pt#3......................................................... 74 25 - Year Summary Report....................................................................................................................... 75 Hydrograph Reports................................................................................................................. 76 Hydrograph No. 1, SCS Runoff, Post Dev Analysis Pt#4....................................................... 76 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin #1............................................................. 77 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin #2............................................................. 78 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin #3............................................................. 79 Hydrograph No. 5, SCS Runoff, DA#1 Sub Basin #4............................................................. 80 Hydrograph No. 6, SCS Runoff, DA #3 Sub Basin #1............................................................ 81 Hydrograph No. 7, SCS Runoff, DA #3 Sub Basin #2............................................................ 82 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 125 of 315 Contents continued...Novo Nordisk Proposed wbasins Rev 6JWH.gpw Hydrograph No. 8, SCS Runoff, DA #3 Sub Basin #3............................................................ 83 Hydrograph No. 9, Reservoir, SWMB#3................................................................................ 84 Hydrograph No. 10, Reservoir, SWMB#2.............................................................................. 85 Hydrograph No. 11, Reservoir, WAREHOUSE POND........................................................... 86 Hydrograph No. 12, Reservoir, SW PKLOT POND................................................................ 87 Hydrograph No. 13, Reservoir, SE PKLOT POND................................................................. 88 Hydrograph No. 14, Combine, Post Dev Analysis Pt#1......................................................... 89 Hydrograph No. 15, SCS Runoff, Proposed Drainage Area #2............................................. 90 Hydrograph No. 16, Reservoir, Post Dev Analysis Pt#2........................................................ 91 Hydrograph No. 17, Combine, Post Dev Analysis Pt#3......................................................... 92 50 - Year Summary Report....................................................................................................................... 93 Hydrograph Reports................................................................................................................. 94 Hydrograph No. 1, SCS Runoff, Post Dev Analysis Pt#4....................................................... 94 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin #1............................................................. 95 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin #2............................................................. 96 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin #3............................................................. 97 Hydrograph No. 5, SCS Runoff, DA#1 Sub Basin #4............................................................. 98 Hydrograph No. 6, SCS Runoff, DA #3 Sub Basin #1............................................................ 99 Hydrograph No. 7, SCS Runoff, DA #3 Sub Basin #2.......................................................... 100 Hydrograph No. 8, SCS Runoff, DA #3 Sub Basin #3.......................................................... 101 Hydrograph No. 9, Reservoir, SWMB#3.............................................................................. 102 Hydrograph No. 10, Reservoir, SWMB#2............................................................................ 103 Hydrograph No. 11, Reservoir, WAREHOUSE POND......................................................... 104 Hydrograph No. 12, Reservoir, SW PKLOT POND.............................................................. 105 Hydrograph No. 13, Reservoir, SE PKLOT POND............................................................... 106 Hydrograph No. 14, Combine, Post Dev Analysis Pt#1....................................................... 107 Hydrograph No. 15, SCS Runoff, Proposed Drainage Area #2........................................... 108 Hydrograph No. 16, Reservoir, Post Dev Analysis Pt#2...................................................... 109 Hydrograph No. 17, Combine, Post Dev Analysis Pt#3....................................................... 110 100 - Year Summary Report..................................................................................................................... 111 Hydrograph Reports............................................................................................................... 112 Hydrograph No. 1, SCS Runoff, Post Dev Analysis Pt#4..................................................... 112 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin #1........................................................... 113 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin #2........................................................... 114 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin #3........................................................... 115 Hydrograph No. 5, SCS Runoff, DA#1 Sub Basin #4........................................................... 116 Hydrograph No. 6, SCS Runoff, DA #3 Sub Basin #1.......................................................... 117 Hydrograph No. 7, SCS Runoff, DA #3 Sub Basin #2.......................................................... 118 Hydrograph No. 8, SCS Runoff, DA #3 Sub Basin #3.......................................................... 119 Hydrograph No. 9, Reservoir, SWMB#3.............................................................................. 120 Hydrograph No. 10, Reservoir, SWMB#2............................................................................ 121 Hydrograph No. 11, Reservoir, WAREHOUSE POND......................................................... 122 Hydrograph No. 12, Reservoir, SW PKLOT POND.............................................................. 123 Hydrograph No. 13, Reservoir, SE PKLOT POND............................................................... 124 Hydrograph No. 14, Combine, Post Dev Analysis Pt#1....................................................... 125 Hydrograph No. 15, SCS Runoff, Proposed Drainage Area #2........................................... 126 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 126 of 315 Contents continued...Novo Nordisk Proposed wbasins Rev 6JWH.gpw Hydrograph No. 16, Reservoir, Post Dev Analysis Pt#2...................................................... 127 Hydrograph No. 17, Combine, Post Dev Analysis Pt#3....................................................... 128 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 127 of 315 12345678 9 10 11 12 13 14 15 16 17 1 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Project: Novo Nordisk Proposed wbasins Rev 6JWH.gpw Monday, 09 / 25 / 2017Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 128 of 315 Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs)Hydrograph No. type hyd(s)Description (origin)1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 6.061 8.803 ------- 13.46 17.41 23.02 27.60 32.48 Post Dev Analysis Pt#4 2 SCS Runoff ------ 37.21 50.13 ------- 71.07 88.33 112.37 131.75 152.23 DA#1 Sub Basin #1 3 SCS Runoff ------ 121.32 152.18 ------- 200.40 239.28 292.79 335.67 380.84 DA#1 Sub Basin #2 4 SCS Runoff ------ 44.60 54.85 ------- 70.91 83.89 101.79 116.16 131.33 DA#1 Sub Basin #3 5 SCS Runoff ------ 3.069 3.790 ------- 4.916 5.825 7.078 8.083 9.144 DA#1 Sub Basin #4 6 SCS Runoff ------ 13.64 16.77 ------- 21.67 25.62 31.08 35.46 40.09 DA #3 Sub Basin #1 7 SCS Runoff ------ 4.918 6.388 ------- 8.711 10.60 13.19 15.28 17.47 DA #3 Sub Basin #2 8 SCS Runoff ------ 8.478 10.43 ------- 13.47 15.93 19.32 22.04 24.91 DA #3 Sub Basin #3 9 Reservoir 3 0.190 0.338 ------- 0.547 1.012 1.361 1.601 1.776 SWMB#3 10 Reservoir 4 0.736 1.206 ------- 1.455 1.619 3.211 7.990 13.32 SWMB#2 11 Reservoir 5 0.000 0.000 ------- 0.000 0.000 0.000 0.000 0.108 WAREHOUSE POND 12 Reservoir 6 5.691 9.666 ------- 12.61 14.72 26.12 33.38 39.23 SW PKLOT POND 13 Reservoir 8 1.561 6.133 ------- 11.25 12.60 18.36 21.52 24.73 SE PKLOT POND 14 Combine 2, 9, 10, 11, 37.95 51.29 ------- 72.82 90.39 114.85 140.69 165.42 Post Dev Analysis Pt#1 15 SCS Runoff ------ 79.57 102.57 ------- 138.82 168.19 208.78 241.30 275.53 Proposed Drainage Area #2 16 Reservoir 15 0.343 3.188 ------- 12.77 21.35 30.00 35.53 44.78 Post Dev Analysis Pt#2 17 Combine 7, 12, 13, 10.25 21.12 ------- 32.09 36.24 56.95 69.89 81.36 Post Dev Analysis Pt#3 Proj. file: Novo Nordisk Proposed wbasins Rev 6JWH.gpw Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 129 of 315 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 6.061 1 727 20,611 ------ ------------ Post Dev Analysis Pt#4 2 SCS Runoff 37.21 1 792 425,517 ------ ------------ DA#1 Sub Basin #1 3 SCS Runoff 121.32 1 719 287,151 ------ ------------ DA#1 Sub Basin #2 4 SCS Runoff 44.60 1 722 129,254 ------ ------------ DA#1 Sub Basin #3 5 SCS Runoff 3.069 1 715 5,978 ------ ------------ DA#1 Sub Basin #4 6 SCS Runoff 13.64 1 721 37,376 ------ ------------ DA #3 Sub Basin #1 7 SCS Runoff 4.918 1 723 14,097 ------ ------------ DA #3 Sub Basin #2 8 SCS Runoff 8.478 1 721 23,229 ------ ------------ DA #3 Sub Basin #3 9 Reservoir 0.190 1 1450 20,329 3 278.64 281,656 SWMB#3 10 Reservoir 0.736 1 1098 85,159 4 284.38 99,555 SWMB#2 11 Reservoir 0.000 1 n/a 0 5 285.84 5,978 WAREHOUSE POND 12 Reservoir 5.691 1 730 36,732 6 290.97 15,682 SW PKLOT POND 13 Reservoir 1.561 1 736 20,660 8 291.07 13,699 SE PKLOT POND 14 Combine 37.95 1 792 531,005 2, 9, 10, 11, ------------ Post Dev Analysis Pt#1 15 SCS Runoff 79.57 1 725 250,220 ------ ------------ Proposed Drainage Area #2 16 Reservoir 0.343 1 1225 39,707 15 289.83 237,038 Post Dev Analysis Pt#2 17 Combine 10.25 1 725 71,489 7, 12, 13, ------------ Post Dev Analysis Pt#3 Novo Nordisk Proposed wbasins Rev 6JWH.gpwReturn Period: 1 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 130 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Post Dev Analysis Pt#4 Hydrograph type = SCS Runoff Peak discharge = 6.061 cfs Storm frequency = 1 yrs Time to peak = 727 min Time interval = 1 min Hyd. volume = 20,611 cuft Drainage area = 5.350 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 4 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (min) Post Dev Analysis Pt#4 Hyd. No. 1 -- 1 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 131 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 37.21 cfs Storm frequency = 1 yrs Time to peak = 792 min Time interval = 1 min Hyd. volume = 425,517 cuft Drainage area = 74.850 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(35.630 x 78) + (38.780 x 93)] / 74.850 5 0 180 360 540 720 900 1080 1260 1440 1620 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (min) DA#1 Sub Basin #1 Hyd. No. 2 -- 1 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 132 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 121.32 cfs Storm frequency = 1 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 287,151 cuft Drainage area = 36.810 ac Curve number = 93 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 6 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) DA#1 Sub Basin #2 Hyd. No. 3 -- 1 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 133 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 44.60 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 129,254 cuft Drainage area = 14.570 ac Curve number = 96 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 7 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (min) DA#1 Sub Basin #3 Hyd. No. 4 -- 1 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 134 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 5 DA#1 Sub Basin #4 Hydrograph type = SCS Runoff Peak discharge = 3.069 cfs Storm frequency = 1 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 5,978 cuft Drainage area = 0.750 ac Curve number = 95 Basin Slope = 3.0 % Hydraulic length = 202 ft Tc method = LAG Time of conc. (Tc) = 2.80 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 8 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (min) DA#1 Sub Basin #4 Hyd. No. 5 -- 1 Year Hyd No. 5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 135 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 6 DA #3 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 13.64 cfs Storm frequency = 1 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 37,376 cuft Drainage area = 4.280 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 500 ft Tc method = LAG Time of conc. (Tc) = 13.00 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 9 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (min) DA #3 Sub Basin #1 Hyd. No. 6 -- 1 Year Hyd No. 6 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 136 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 7 DA #3 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 4.918 cfs Storm frequency = 1 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 14,097 cuft Drainage area = 2.130 ac Curve number = 89 Basin Slope = 0.3 % Hydraulic length = 300 ft Tc method = LAG Time of conc. (Tc) = 15.40 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 10 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (min) DA #3 Sub Basin #2 Hyd. No. 7 -- 1 Year Hyd No. 7 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 137 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 8 DA #3 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 8.478 cfs Storm frequency = 1 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 23,229 cuft Drainage area = 2.660 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 450 ft Tc method = LAG Time of conc. (Tc) = 12.00 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 11 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (min) DA #3 Sub Basin #3 Hyd. No. 8 -- 1 Year Hyd No. 8 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 138 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 9 SWMB#3 Hydrograph type = Reservoir Peak discharge = 0.190 cfs Storm frequency = 1 yrs Time to peak = 1450 min Time interval = 1 min Hyd. volume = 20,329 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 278.64 ft Reservoir name = SWMB#3 Max. Storage = 281,656 cuft Storage Indication method used. 12 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) SWMB#3 Hyd. No. 9 -- 1 Year Hyd No. 9 Hyd No. 3 Total storage used = 281,656 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 139 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 10 SWMB#2 Hydrograph type = Reservoir Peak discharge = 0.736 cfs Storm frequency = 1 yrs Time to peak = 1098 min Time interval = 1 min Hyd. volume = 85,159 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 284.38 ft Reservoir name = SWMB#2 Max. Storage = 99,555 cuft Storage Indication method used. 13 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (min) SWMB#2 Hyd. No. 10 -- 1 Year Hyd No. 10 Hyd No. 4 Total storage used = 99,555 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 140 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 11 WAREHOUSE POND Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - DA#1 Sub Basin #4 Max. Elevation = 285.84 ft Reservoir name = WAREHOUSE POND Max. Storage = 5,978 cuft Storage Indication method used. 14 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (min) WAREHOUSE POND Hyd. No. 11 -- 1 Year Hyd No. 11 Hyd No. 5 Total storage used = 5,978 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 141 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 12 SW PKLOT POND Hydrograph type = Reservoir Peak discharge = 5.691 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 1 min Hyd. volume = 36,732 cuft Inflow hyd. No. = 6 - DA #3 Sub Basin #1 Max. Elevation = 290.97 ft Reservoir name = SW PKLOT POND Max. Storage = 15,682 cuft Storage Indication method used. 15 0 180 360 540 720 900 1080 1260 1440 1620 1800 1980 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (min) SW PKLOT POND Hyd. No. 12 -- 1 Year Hyd No. 12 Hyd No. 6 Total storage used = 15,682 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 142 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 13 SE PKLOT POND Hydrograph type = Reservoir Peak discharge = 1.561 cfs Storm frequency = 1 yrs Time to peak = 736 min Time interval = 1 min Hyd. volume = 20,660 cuft Inflow hyd. No. = 8 - DA #3 Sub Basin #3 Max. Elevation = 291.07 ft Reservoir name = SE PKLOT POND Max. Storage = 13,699 cuft Storage Indication method used. 16 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (min) SE PKLOT POND Hyd. No. 13 -- 1 Year Hyd No. 13 Hyd No. 8 Total storage used = 13,699 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 143 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 14 Post Dev Analysis Pt#1 Hydrograph type = Combine Peak discharge = 37.95 cfs Storm frequency = 1 yrs Time to peak = 792 min Time interval = 1 min Hyd. volume = 531,005 cuft Inflow hyds. = 2, 9, 10, 11 Contrib. drain. area = 74.850 ac 17 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (min) Post Dev Analysis Pt#1 Hyd. No. 14 -- 1 Year Hyd No. 14 Hyd No. 2 Hyd No. 9 Hyd No. 10 Hyd No. 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 144 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 15 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 79.57 cfs Storm frequency = 1 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 250,220 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 36.600 18 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) Proposed Drainage Area #2 Hyd. No. 15 -- 1 Year Hyd No. 15 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 145 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 16 Post Dev Analysis Pt#2 Hydrograph type = Reservoir Peak discharge = 0.343 cfs Storm frequency = 1 yrs Time to peak = 1225 min Time interval = 1 min Hyd. volume = 39,707 cuft Inflow hyd. No. = 15 - Proposed Drainage Area #2Max. Elevation = 289.83 ft Reservoir name = SWMB#1 Max. Storage = 237,038 cuft Storage Indication method used. 19 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) Post Dev Analysis Pt#2 Hyd. No. 16 -- 1 Year Hyd No. 16 Hyd No. 15 Total storage used = 237,038 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 146 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 17 Post Dev Analysis Pt#3 Hydrograph type = Combine Peak discharge = 10.25 cfs Storm frequency = 1 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 71,489 cuft Inflow hyds. = 7, 12, 13 Contrib. drain. area = 2.130 ac 20 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (min) Post Dev Analysis Pt#3 Hyd. No. 17 -- 1 Year Hyd No. 17 Hyd No. 7 Hyd No. 12 Hyd No. 13 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 147 of 315 Hydrograph Summary Report 21 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 8.803 1 726 29,359 ------ ------------ Post Dev Analysis Pt#4 2 SCS Runoff 50.13 1 791 569,207 ------ ------------ DA#1 Sub Basin #1 3 SCS Runoff 152.18 1 719 365,436 ------ ------------ DA#1 Sub Basin #2 4 SCS Runoff 54.85 1 722 161,063 ------ ------------ DA#1 Sub Basin #3 5 SCS Runoff 3.790 1 715 7,502 ------ ------------ DA#1 Sub Basin #4 6 SCS Runoff 16.77 1 721 46,574 ------ ------------ DA #3 Sub Basin #1 7 SCS Runoff 6.388 1 723 18,453 ------ ------------ DA #3 Sub Basin #2 8 SCS Runoff 10.43 1 721 28,945 ------ ------------ DA #3 Sub Basin #3 9 Reservoir 0.338 1 1449 38,294 3 279.04 353,975 SWMB#3 10 Reservoir 1.206 1 964 106,840 4 284.65 120,110 SWMB#2 11 Reservoir 0.000 1 n/a 0 5 286.04 7,502 WAREHOUSE POND 12 Reservoir 9.666 1 728 45,907 6 291.19 17,835 SW PKLOT POND 13 Reservoir 6.133 1 728 26,209 8 291.20 14,691 SE PKLOT POND 14 Combine 51.29 1 792 714,341 2, 9, 10, 11, ------------ Post Dev Analysis Pt#1 15 SCS Runoff 102.57 1 725 325,231 ------ ------------ Proposed Drainage Area #2 16 Reservoir 3.188 1 941 72,540 15 290.04 256,736 Post Dev Analysis Pt#2 17 Combine 21.12 1 727 90,568 7, 12, 13, ------------ Post Dev Analysis Pt#3 Novo Nordisk Proposed wbasins Rev 6JWH.gpwReturn Period: 2 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 148 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Post Dev Analysis Pt#4 Hydrograph type = SCS Runoff Peak discharge = 8.803 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 29,359 cuft Drainage area = 5.350 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 22 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (min) Post Dev Analysis Pt#4 Hyd. No. 1 -- 2 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 149 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 50.13 cfs Storm frequency = 2 yrs Time to peak = 791 min Time interval = 1 min Hyd. volume = 569,207 cuft Drainage area = 74.850 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(35.630 x 78) + (38.780 x 93)] / 74.850 23 0 180 360 540 720 900 1080 1260 1440 1620 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (min) DA#1 Sub Basin #1 Hyd. No. 2 -- 2 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 150 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 152.18 cfs Storm frequency = 2 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 365,436 cuft Drainage area = 36.810 ac Curve number = 93 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 24 0 120 240 360 480 600 720 840 960 1080 1200 1320 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (min) DA#1 Sub Basin #2 Hyd. No. 3 -- 2 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 151 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 54.85 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 161,063 cuft Drainage area = 14.570 ac Curve number = 96 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 25 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (min) DA#1 Sub Basin #3 Hyd. No. 4 -- 2 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 152 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 5 DA#1 Sub Basin #4 Hydrograph type = SCS Runoff Peak discharge = 3.790 cfs Storm frequency = 2 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 7,502 cuft Drainage area = 0.750 ac Curve number = 95 Basin Slope = 3.0 % Hydraulic length = 202 ft Tc method = LAG Time of conc. (Tc) = 2.80 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 26 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (min) DA#1 Sub Basin #4 Hyd. No. 5 -- 2 Year Hyd No. 5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 153 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 6 DA #3 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 16.77 cfs Storm frequency = 2 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 46,574 cuft Drainage area = 4.280 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 500 ft Tc method = LAG Time of conc. (Tc) = 13.00 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 27 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) DA #3 Sub Basin #1 Hyd. No. 6 -- 2 Year Hyd No. 6 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 154 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 7 DA #3 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 6.388 cfs Storm frequency = 2 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 18,453 cuft Drainage area = 2.130 ac Curve number = 89 Basin Slope = 0.3 % Hydraulic length = 300 ft Tc method = LAG Time of conc. (Tc) = 15.40 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 28 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (min) DA #3 Sub Basin #2 Hyd. No. 7 -- 2 Year Hyd No. 7 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 155 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 8 DA #3 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 10.43 cfs Storm frequency = 2 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 28,945 cuft Drainage area = 2.660 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 450 ft Tc method = LAG Time of conc. (Tc) = 12.00 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 29 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (min) DA #3 Sub Basin #3 Hyd. No. 8 -- 2 Year Hyd No. 8 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 156 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 9 SWMB#3 Hydrograph type = Reservoir Peak discharge = 0.338 cfs Storm frequency = 2 yrs Time to peak = 1449 min Time interval = 1 min Hyd. volume = 38,294 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 279.04 ft Reservoir name = SWMB#3 Max. Storage = 353,975 cuft Storage Indication method used. 30 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (min) SWMB#3 Hyd. No. 9 -- 2 Year Hyd No. 9 Hyd No. 3 Total storage used = 353,975 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 157 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 10 SWMB#2 Hydrograph type = Reservoir Peak discharge = 1.206 cfs Storm frequency = 2 yrs Time to peak = 964 min Time interval = 1 min Hyd. volume = 106,840 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 284.65 ft Reservoir name = SWMB#2 Max. Storage = 120,110 cuft Storage Indication method used. 31 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (min) SWMB#2 Hyd. No. 10 -- 2 Year Hyd No. 10 Hyd No. 4 Total storage used = 120,110 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 158 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 11 WAREHOUSE POND Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - DA#1 Sub Basin #4 Max. Elevation = 286.04 ft Reservoir name = WAREHOUSE POND Max. Storage = 7,502 cuft Storage Indication method used. 32 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (min) WAREHOUSE POND Hyd. No. 11 -- 2 Year Hyd No. 11 Hyd No. 5 Total storage used = 7,502 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 159 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 12 SW PKLOT POND Hydrograph type = Reservoir Peak discharge = 9.666 cfs Storm frequency = 2 yrs Time to peak = 728 min Time interval = 1 min Hyd. volume = 45,907 cuft Inflow hyd. No. = 6 - DA #3 Sub Basin #1 Max. Elevation = 291.19 ft Reservoir name = SW PKLOT POND Max. Storage = 17,835 cuft Storage Indication method used. 33 0 180 360 540 720 900 1080 1260 1440 1620 1800 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) SW PKLOT POND Hyd. No. 12 -- 2 Year Hyd No. 12 Hyd No. 6 Total storage used = 17,835 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 160 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 13 SE PKLOT POND Hydrograph type = Reservoir Peak discharge = 6.133 cfs Storm frequency = 2 yrs Time to peak = 728 min Time interval = 1 min Hyd. volume = 26,209 cuft Inflow hyd. No. = 8 - DA #3 Sub Basin #3 Max. Elevation = 291.20 ft Reservoir name = SE PKLOT POND Max. Storage = 14,691 cuft Storage Indication method used. 34 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (min) SE PKLOT POND Hyd. No. 13 -- 2 Year Hyd No. 13 Hyd No. 8 Total storage used = 14,691 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 161 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 14 Post Dev Analysis Pt#1 Hydrograph type = Combine Peak discharge = 51.29 cfs Storm frequency = 2 yrs Time to peak = 792 min Time interval = 1 min Hyd. volume = 714,341 cuft Inflow hyds. = 2, 9, 10, 11 Contrib. drain. area = 74.850 ac 35 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (min) Post Dev Analysis Pt#1 Hyd. No. 14 -- 2 Year Hyd No. 14 Hyd No. 2 Hyd No. 9 Hyd No. 10 Hyd No. 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 162 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 15 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 102.57 cfs Storm frequency = 2 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 325,231 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 36.600 36 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) Proposed Drainage Area #2 Hyd. No. 15 -- 2 Year Hyd No. 15 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 163 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 16 Post Dev Analysis Pt#2 Hydrograph type = Reservoir Peak discharge = 3.188 cfs Storm frequency = 2 yrs Time to peak = 941 min Time interval = 1 min Hyd. volume = 72,540 cuft Inflow hyd. No. = 15 - Proposed Drainage Area #2Max. Elevation = 290.04 ft Reservoir name = SWMB#1 Max. Storage = 256,736 cuft Storage Indication method used. 37 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) Post Dev Analysis Pt#2 Hyd. No. 16 -- 2 Year Hyd No. 16 Hyd No. 15 Total storage used = 256,736 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 164 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 17 Post Dev Analysis Pt#3 Hydrograph type = Combine Peak discharge = 21.12 cfs Storm frequency = 2 yrs Time to peak = 727 min Time interval = 1 min Hyd. volume = 90,568 cuft Inflow hyds. = 7, 12, 13 Contrib. drain. area = 2.130 ac 38 0 180 360 540 720 900 1080 1260 1440 1620 1800 1980 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (min) Post Dev Analysis Pt#3 Hyd. No. 17 -- 2 Year Hyd No. 17 Hyd No. 7 Hyd No. 12 Hyd No. 13 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 165 of 315 Hydrograph Summary Report 39 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 13.46 1 726 44,309 ------ ------------ Post Dev Analysis Pt#4 2 SCS Runoff 71.07 1 791 804,682 ------ ------------ DA#1 Sub Basin #1 3 SCS Runoff 200.40 1 719 490,212 ------ ------------ DA#1 Sub Basin #2 4 SCS Runoff 70.91 1 721 211,356 ------ ------------ DA#1 Sub Basin #3 5 SCS Runoff 4.916 1 715 9,916 ------ ------------ DA#1 Sub Basin #4 6 SCS Runoff 21.67 1 721 61,117 ------ ------------ DA #3 Sub Basin #1 7 SCS Runoff 8.711 1 723 25,499 ------ ------------ DA #3 Sub Basin #2 8 SCS Runoff 13.47 1 721 37,984 ------ ------------ DA #3 Sub Basin #3 9 Reservoir 0.547 1 1448 63,761 3 279.64 469,946 SWMB#3 10 Reservoir 1.455 1 984 141,105 4 285.15 157,655 SWMB#2 11 Reservoir 0.000 1 n/a 0 5 286.28 9,916 WAREHOUSE POND 12 Reservoir 12.61 1 728 60,431 6 291.47 20,726 SW PKLOT POND 13 Reservoir 11.25 1 725 35,043 8 291.33 15,636 SE PKLOT POND 14 Combine 72.82 1 791 1,009,548 2, 9, 10, 11, ------------ Post Dev Analysis Pt#1 15 SCS Runoff 138.82 1 725 446,068 ------ ------------ Proposed Drainage Area #2 16 Reservoir 12.77 1 771 193,375 15 290.28 279,841 Post Dev Analysis Pt#2 17 Combine 32.09 1 724 120,972 7, 12, 13, ------------ Post Dev Analysis Pt#3 Novo Nordisk Proposed wbasins Rev 6JWH.gpwReturn Period: 5 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 166 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Post Dev Analysis Pt#4 Hydrograph type = SCS Runoff Peak discharge = 13.46 cfs Storm frequency = 5 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 44,309 cuft Drainage area = 5.350 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 40 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (min) Post Dev Analysis Pt#4 Hyd. No. 1 -- 5 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 167 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 71.07 cfs Storm frequency = 5 yrs Time to peak = 791 min Time interval = 1 min Hyd. volume = 804,682 cuft Drainage area = 74.850 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(35.630 x 78) + (38.780 x 93)] / 74.850 41 0 180 360 540 720 900 1080 1260 1440 1620 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) DA#1 Sub Basin #1 Hyd. No. 2 -- 5 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 168 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 200.40 cfs Storm frequency = 5 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 490,212 cuft Drainage area = 36.810 ac Curve number = 93 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 42 0 120 240 360 480 600 720 840 960 1080 1200 1320 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (min) DA#1 Sub Basin #2 Hyd. No. 3 -- 5 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 169 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 70.91 cfs Storm frequency = 5 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 211,356 cuft Drainage area = 14.570 ac Curve number = 96 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 43 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) DA#1 Sub Basin #3 Hyd. No. 4 -- 5 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 170 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 5 DA#1 Sub Basin #4 Hydrograph type = SCS Runoff Peak discharge = 4.916 cfs Storm frequency = 5 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 9,916 cuft Drainage area = 0.750 ac Curve number = 95 Basin Slope = 3.0 % Hydraulic length = 202 ft Tc method = LAG Time of conc. (Tc) = 2.80 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 44 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (min) DA#1 Sub Basin #4 Hyd. No. 5 -- 5 Year Hyd No. 5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 171 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 6 DA #3 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 21.67 cfs Storm frequency = 5 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 61,117 cuft Drainage area = 4.280 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 500 ft Tc method = LAG Time of conc. (Tc) = 13.00 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 45 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (min) DA #3 Sub Basin #1 Hyd. No. 6 -- 5 Year Hyd No. 6 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 172 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 7 DA #3 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 8.711 cfs Storm frequency = 5 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 25,499 cuft Drainage area = 2.130 ac Curve number = 89 Basin Slope = 0.3 % Hydraulic length = 300 ft Tc method = LAG Time of conc. (Tc) = 15.40 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 46 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (min) DA #3 Sub Basin #2 Hyd. No. 7 -- 5 Year Hyd No. 7 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 173 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 8 DA #3 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 13.47 cfs Storm frequency = 5 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 37,984 cuft Drainage area = 2.660 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 450 ft Tc method = LAG Time of conc. (Tc) = 12.00 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 47 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (min) DA #3 Sub Basin #3 Hyd. No. 8 -- 5 Year Hyd No. 8 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 174 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 9 SWMB#3 Hydrograph type = Reservoir Peak discharge = 0.547 cfs Storm frequency = 5 yrs Time to peak = 1448 min Time interval = 1 min Hyd. volume = 63,761 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 279.64 ft Reservoir name = SWMB#3 Max. Storage = 469,946 cuft Storage Indication method used. 48 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (min) SWMB#3 Hyd. No. 9 -- 5 Year Hyd No. 9 Hyd No. 3 Total storage used = 469,946 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 175 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 10 SWMB#2 Hydrograph type = Reservoir Peak discharge = 1.455 cfs Storm frequency = 5 yrs Time to peak = 984 min Time interval = 1 min Hyd. volume = 141,105 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 285.15 ft Reservoir name = SWMB#2 Max. Storage = 157,655 cuft Storage Indication method used. 49 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) SWMB#2 Hyd. No. 10 -- 5 Year Hyd No. 10 Hyd No. 4 Total storage used = 157,655 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 176 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 11 WAREHOUSE POND Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 5 yrs Time to peak = n/a Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - DA#1 Sub Basin #4 Max. Elevation = 286.28 ft Reservoir name = WAREHOUSE POND Max. Storage = 9,916 cuft Storage Indication method used. 50 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (min) WAREHOUSE POND Hyd. No. 11 -- 5 Year Hyd No. 11 Hyd No. 5 Total storage used = 9,916 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 177 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 12 SW PKLOT POND Hydrograph type = Reservoir Peak discharge = 12.61 cfs Storm frequency = 5 yrs Time to peak = 728 min Time interval = 1 min Hyd. volume = 60,431 cuft Inflow hyd. No. = 6 - DA #3 Sub Basin #1 Max. Elevation = 291.47 ft Reservoir name = SW PKLOT POND Max. Storage = 20,726 cuft Storage Indication method used. 51 0 180 360 540 720 900 1080 1260 1440 1620 1800 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (min) SW PKLOT POND Hyd. No. 12 -- 5 Year Hyd No. 12 Hyd No. 6 Total storage used = 20,726 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 178 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 13 SE PKLOT POND Hydrograph type = Reservoir Peak discharge = 11.25 cfs Storm frequency = 5 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 35,043 cuft Inflow hyd. No. = 8 - DA #3 Sub Basin #3 Max. Elevation = 291.33 ft Reservoir name = SE PKLOT POND Max. Storage = 15,636 cuft Storage Indication method used. 52 0 240 480 720 960 1200 1440 1680 1920 2160 2400 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (min) SE PKLOT POND Hyd. No. 13 -- 5 Year Hyd No. 13 Hyd No. 8 Total storage used = 15,636 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 179 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 14 Post Dev Analysis Pt#1 Hydrograph type = Combine Peak discharge = 72.82 cfs Storm frequency = 5 yrs Time to peak = 791 min Time interval = 1 min Hyd. volume = 1,009,548 cuft Inflow hyds. = 2, 9, 10, 11 Contrib. drain. area = 74.850 ac 53 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) Post Dev Analysis Pt#1 Hyd. No. 14 -- 5 Year Hyd No. 14 Hyd No. 2 Hyd No. 9 Hyd No. 10 Hyd No. 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 180 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 15 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 138.82 cfs Storm frequency = 5 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 446,068 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 4.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 36.600 54 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) Proposed Drainage Area #2 Hyd. No. 15 -- 5 Year Hyd No. 15 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 181 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 16 Post Dev Analysis Pt#2 Hydrograph type = Reservoir Peak discharge = 12.77 cfs Storm frequency = 5 yrs Time to peak = 771 min Time interval = 1 min Hyd. volume = 193,375 cuft Inflow hyd. No. = 15 - Proposed Drainage Area #2Max. Elevation = 290.28 ft Reservoir name = SWMB#1 Max. Storage = 279,841 cuft Storage Indication method used. 55 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) Post Dev Analysis Pt#2 Hyd. No. 16 -- 5 Year Hyd No. 16 Hyd No. 15 Total storage used = 279,841 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 182 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 17 Post Dev Analysis Pt#3 Hydrograph type = Combine Peak discharge = 32.09 cfs Storm frequency = 5 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 120,972 cuft Inflow hyds. = 7, 12, 13 Contrib. drain. area = 2.130 ac 56 0 180 360 540 720 900 1080 1260 1440 1620 1800 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (min) Post Dev Analysis Pt#3 Hyd. No. 17 -- 5 Year Hyd No. 17 Hyd No. 7 Hyd No. 12 Hyd No. 13 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 183 of 315 Hydrograph Summary Report 57 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 17.41 1 726 57,186 ------ ------------ Post Dev Analysis Pt#4 2 SCS Runoff 88.33 1 791 1,001,395 ------ ------------ DA#1 Sub Basin #1 3 SCS Runoff 239.28 1 719 592,439 ------ ------------ DA#1 Sub Basin #2 4 SCS Runoff 83.89 1 721 252,342 ------ ------------ DA#1 Sub Basin #3 5 SCS Runoff 5.825 1 715 11,887 ------ ------------ DA#1 Sub Basin #4 6 SCS Runoff 25.62 1 721 72,968 ------ ------------ DA #3 Sub Basin #1 7 SCS Runoff 10.60 1 723 31,331 ------ ------------ DA #3 Sub Basin #2 8 SCS Runoff 15.93 1 721 45,349 ------ ------------ DA #3 Sub Basin #3 9 Reservoir 1.012 1 1447 90,119 3 280.12 562,403 SWMB#3 10 Reservoir 1.619 1 1014 167,998 4 285.56 189,938 SWMB#2 11 Reservoir 0.000 1 n/a 0 5 286.47 11,887 WAREHOUSE POND 12 Reservoir 14.72 1 728 72,280 6 291.74 23,513 SW PKLOT POND 13 Reservoir 12.60 1 725 42,295 8 291.48 16,732 SE PKLOT POND 14 Combine 90.39 1 791 1,259,513 2, 9, 10, 11, ------------ Post Dev Analysis Pt#1 15 SCS Runoff 168.19 1 724 545,794 ------ ------------ Proposed Drainage Area #2 16 Reservoir 21.35 1 756 293,101 15 290.78 328,161 Post Dev Analysis Pt#2 17 Combine 36.24 1 724 145,906 7, 12, 13, ------------ Post Dev Analysis Pt#3 Novo Nordisk Proposed wbasins Rev 6JWH.gpwReturn Period: 10 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 184 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Post Dev Analysis Pt#4 Hydrograph type = SCS Runoff Peak discharge = 17.41 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 57,186 cuft Drainage area = 5.350 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 58 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) Post Dev Analysis Pt#4 Hyd. No. 1 -- 10 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 185 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 88.33 cfs Storm frequency = 10 yrs Time to peak = 791 min Time interval = 1 min Hyd. volume = 1,001,395 cuft Drainage area = 74.850 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(35.630 x 78) + (38.780 x 93)] / 74.850 59 0 180 360 540 720 900 1080 1260 1440 1620 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (min) DA#1 Sub Basin #1 Hyd. No. 2 -- 10 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 186 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 239.28 cfs Storm frequency = 10 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 592,439 cuft Drainage area = 36.810 ac Curve number = 93 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 60 0 120 240 360 480 600 720 840 960 1080 1200 1320 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 Q (cfs) Time (min) DA#1 Sub Basin #2 Hyd. No. 3 -- 10 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 187 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 83.89 cfs Storm frequency = 10 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 252,342 cuft Drainage area = 14.570 ac Curve number = 96 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 61 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (min) DA#1 Sub Basin #3 Hyd. No. 4 -- 10 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 188 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 5 DA#1 Sub Basin #4 Hydrograph type = SCS Runoff Peak discharge = 5.825 cfs Storm frequency = 10 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 11,887 cuft Drainage area = 0.750 ac Curve number = 95 Basin Slope = 3.0 % Hydraulic length = 202 ft Tc method = LAG Time of conc. (Tc) = 2.80 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 62 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 Q (cfs) Time (min) DA#1 Sub Basin #4 Hyd. No. 5 -- 10 Year Hyd No. 5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 189 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 6 DA #3 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 25.62 cfs Storm frequency = 10 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 72,968 cuft Drainage area = 4.280 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 500 ft Tc method = LAG Time of conc. (Tc) = 13.00 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 63 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (min) DA #3 Sub Basin #1 Hyd. No. 6 -- 10 Year Hyd No. 6 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 190 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 7 DA #3 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 10.60 cfs Storm frequency = 10 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 31,331 cuft Drainage area = 2.130 ac Curve number = 89 Basin Slope = 0.3 % Hydraulic length = 300 ft Tc method = LAG Time of conc. (Tc) = 15.40 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 64 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (min) DA #3 Sub Basin #2 Hyd. No. 7 -- 10 Year Hyd No. 7 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 191 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 8 DA #3 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 15.93 cfs Storm frequency = 10 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 45,349 cuft Drainage area = 2.660 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 450 ft Tc method = LAG Time of conc. (Tc) = 12.00 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 65 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) DA #3 Sub Basin #3 Hyd. No. 8 -- 10 Year Hyd No. 8 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 192 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 9 SWMB#3 Hydrograph type = Reservoir Peak discharge = 1.012 cfs Storm frequency = 10 yrs Time to peak = 1447 min Time interval = 1 min Hyd. volume = 90,119 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 280.12 ft Reservoir name = SWMB#3 Max. Storage = 562,403 cuft Storage Indication method used. 66 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 Q (cfs) Time (min) SWMB#3 Hyd. No. 9 -- 10 Year Hyd No. 9 Hyd No. 3 Total storage used = 562,403 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 193 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 10 SWMB#2 Hydrograph type = Reservoir Peak discharge = 1.619 cfs Storm frequency = 10 yrs Time to peak = 1014 min Time interval = 1 min Hyd. volume = 167,998 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 285.56 ft Reservoir name = SWMB#2 Max. Storage = 189,938 cuft Storage Indication method used. 67 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (min) SWMB#2 Hyd. No. 10 -- 10 Year Hyd No. 10 Hyd No. 4 Total storage used = 189,938 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 194 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 11 WAREHOUSE POND Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - DA#1 Sub Basin #4 Max. Elevation = 286.47 ft Reservoir name = WAREHOUSE POND Max. Storage = 11,887 cuft Storage Indication method used. 68 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 Q (cfs) Time (min) WAREHOUSE POND Hyd. No. 11 -- 10 Year Hyd No. 11 Hyd No. 5 Total storage used = 11,887 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 195 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 12 SW PKLOT POND Hydrograph type = Reservoir Peak discharge = 14.72 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 1 min Hyd. volume = 72,280 cuft Inflow hyd. No. = 6 - DA #3 Sub Basin #1 Max. Elevation = 291.74 ft Reservoir name = SW PKLOT POND Max. Storage = 23,513 cuft Storage Indication method used. 69 0 180 360 540 720 900 1080 1260 1440 1620 1800 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (min) SW PKLOT POND Hyd. No. 12 -- 10 Year Hyd No. 12 Hyd No. 6 Total storage used = 23,513 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 196 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 13 SE PKLOT POND Hydrograph type = Reservoir Peak discharge = 12.60 cfs Storm frequency = 10 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 42,295 cuft Inflow hyd. No. = 8 - DA #3 Sub Basin #3 Max. Elevation = 291.48 ft Reservoir name = SE PKLOT POND Max. Storage = 16,732 cuft Storage Indication method used. 70 0 240 480 720 960 1200 1440 1680 1920 2160 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) SE PKLOT POND Hyd. No. 13 -- 10 Year Hyd No. 13 Hyd No. 8 Total storage used = 16,732 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 197 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 14 Post Dev Analysis Pt#1 Hydrograph type = Combine Peak discharge = 90.39 cfs Storm frequency = 10 yrs Time to peak = 791 min Time interval = 1 min Hyd. volume = 1,259,513 cuft Inflow hyds. = 2, 9, 10, 11 Contrib. drain. area = 74.850 ac 71 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 100.00 100.00 Q (cfs) Time (min) Post Dev Analysis Pt#1 Hyd. No. 14 -- 10 Year Hyd No. 14 Hyd No. 2 Hyd No. 9 Hyd No. 10 Hyd No. 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 198 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 15 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 168.19 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 545,794 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 36.600 72 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 180.00 180.00 Q (cfs) Time (min) Proposed Drainage Area #2 Hyd. No. 15 -- 10 Year Hyd No. 15 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 199 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 16 Post Dev Analysis Pt#2 Hydrograph type = Reservoir Peak discharge = 21.35 cfs Storm frequency = 10 yrs Time to peak = 756 min Time interval = 1 min Hyd. volume = 293,101 cuft Inflow hyd. No. = 15 - Proposed Drainage Area #2Max. Elevation = 290.78 ft Reservoir name = SWMB#1 Max. Storage = 328,161 cuft Storage Indication method used. 73 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 180.00 180.00 Q (cfs) Time (min) Post Dev Analysis Pt#2 Hyd. No. 16 -- 10 Year Hyd No. 16 Hyd No. 15 Total storage used = 328,161 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 200 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 17 Post Dev Analysis Pt#3 Hydrograph type = Combine Peak discharge = 36.24 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 145,906 cuft Inflow hyds. = 7, 12, 13 Contrib. drain. area = 2.130 ac 74 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (min) Post Dev Analysis Pt#3 Hyd. No. 17 -- 10 Year Hyd No. 17 Hyd No. 7 Hyd No. 12 Hyd No. 13 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 201 of 315 Hydrograph Summary Report 75 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 23.02 1 726 75,742 ------ ------------ Post Dev Analysis Pt#4 2 SCS Runoff 112.37 1 791 1,278,791 ------ ------------ DA#1 Sub Basin #1 3 SCS Runoff 292.79 1 719 734,727 ------ ------------ DA#1 Sub Basin #2 4 SCS Runoff 101.79 1 721 309,195 ------ ------------ DA#1 Sub Basin #3 5 SCS Runoff 7.078 1 715 14,624 ------ ------------ DA#1 Sub Basin #4 6 SCS Runoff 31.08 1 721 89,408 ------ ------------ DA #3 Sub Basin #1 7 SCS Runoff 13.19 1 723 39,502 ------ ------------ DA #3 Sub Basin #2 8 SCS Runoff 19.32 1 721 55,567 ------ ------------ DA #3 Sub Basin #3 9 Reservoir 1.361 1 1446 154,878 3 280.72 683,301 SWMB#3 10 Reservoir 3.211 1 870 208,787 4 286.03 226,920 SWMB#2 11 Reservoir 0.000 1 n/a 0 5 286.73 14,624 WAREHOUSE POND 12 Reservoir 26.12 1 725 88,718 6 291.88 24,927 SW PKLOT POND 13 Reservoir 18.36 1 723 52,493 8 291.57 17,358 SE PKLOT POND 14 Combine 114.85 1 791 1,642,458 2, 9, 10, 11, ------------ Post Dev Analysis Pt#1 15 SCS Runoff 208.78 1 724 685,271 ------ ------------ Proposed Drainage Area #2 16 Reservoir 30.00 1 752 432,579 15 291.53 405,154 Post Dev Analysis Pt#2 17 Combine 56.95 1 724 180,713 7, 12, 13, ------------ Post Dev Analysis Pt#3 Novo Nordisk Proposed wbasins Rev 6JWH.gpwReturn Period: 25 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 202 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Post Dev Analysis Pt#4 Hydrograph type = SCS Runoff Peak discharge = 23.02 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 75,742 cuft Drainage area = 5.350 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 76 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (min) Post Dev Analysis Pt#4 Hyd. No. 1 -- 25 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 203 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 112.37 cfs Storm frequency = 25 yrs Time to peak = 791 min Time interval = 1 min Hyd. volume = 1,278,791 cuft Drainage area = 74.850 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(35.630 x 78) + (38.780 x 93)] / 74.850 77 0 180 360 540 720 900 1080 1260 1440 1620 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) DA#1 Sub Basin #1 Hyd. No. 2 -- 25 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 204 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 292.79 cfs Storm frequency = 25 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 734,727 cuft Drainage area = 36.810 ac Curve number = 93 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 78 0 120 240 360 480 600 720 840 960 1080 1200 1320 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 320.00 320.00 Q (cfs) Time (min) DA#1 Sub Basin #2 Hyd. No. 3 -- 25 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 205 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 101.79 cfs Storm frequency = 25 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 309,195 cuft Drainage area = 14.570 ac Curve number = 96 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 79 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) DA#1 Sub Basin #3 Hyd. No. 4 -- 25 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 206 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 5 DA#1 Sub Basin #4 Hydrograph type = SCS Runoff Peak discharge = 7.078 cfs Storm frequency = 25 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 14,624 cuft Drainage area = 0.750 ac Curve number = 95 Basin Slope = 3.0 % Hydraulic length = 202 ft Tc method = LAG Time of conc. (Tc) = 2.80 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 80 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 Q (cfs) Time (min) DA#1 Sub Basin #4 Hyd. No. 5 -- 25 Year Hyd No. 5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 207 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 6 DA #3 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 31.08 cfs Storm frequency = 25 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 89,408 cuft Drainage area = 4.280 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 500 ft Tc method = LAG Time of conc. (Tc) = 13.00 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 81 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (min) DA #3 Sub Basin #1 Hyd. No. 6 -- 25 Year Hyd No. 6 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 208 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 7 DA #3 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 13.19 cfs Storm frequency = 25 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 39,502 cuft Drainage area = 2.130 ac Curve number = 89 Basin Slope = 0.3 % Hydraulic length = 300 ft Tc method = LAG Time of conc. (Tc) = 15.40 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 82 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (min) DA #3 Sub Basin #2 Hyd. No. 7 -- 25 Year Hyd No. 7 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 209 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 8 DA #3 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 19.32 cfs Storm frequency = 25 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 55,567 cuft Drainage area = 2.660 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 450 ft Tc method = LAG Time of conc. (Tc) = 12.00 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 83 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 21.00 21.00 Q (cfs) Time (min) DA #3 Sub Basin #3 Hyd. No. 8 -- 25 Year Hyd No. 8 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 210 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 9 SWMB#3 Hydrograph type = Reservoir Peak discharge = 1.361 cfs Storm frequency = 25 yrs Time to peak = 1446 min Time interval = 1 min Hyd. volume = 154,878 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 280.72 ft Reservoir name = SWMB#3 Max. Storage = 683,301 cuft Storage Indication method used. 84 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 320.00 320.00 Q (cfs) Time (min) SWMB#3 Hyd. No. 9 -- 25 Year Hyd No. 9 Hyd No. 3 Total storage used = 683,301 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 211 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 10 SWMB#2 Hydrograph type = Reservoir Peak discharge = 3.211 cfs Storm frequency = 25 yrs Time to peak = 870 min Time interval = 1 min Hyd. volume = 208,787 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 286.03 ft Reservoir name = SWMB#2 Max. Storage = 226,920 cuft Storage Indication method used. 85 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) SWMB#2 Hyd. No. 10 -- 25 Year Hyd No. 10 Hyd No. 4 Total storage used = 226,920 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 212 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 11 WAREHOUSE POND Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 25 yrs Time to peak = n/a Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - DA#1 Sub Basin #4 Max. Elevation = 286.73 ft Reservoir name = WAREHOUSE POND Max. Storage = 14,624 cuft Storage Indication method used. 86 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 Q (cfs) Time (min) WAREHOUSE POND Hyd. No. 11 -- 25 Year Hyd No. 11 Hyd No. 5 Total storage used = 14,624 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 213 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 12 SW PKLOT POND Hydrograph type = Reservoir Peak discharge = 26.12 cfs Storm frequency = 25 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 88,718 cuft Inflow hyd. No. = 6 - DA #3 Sub Basin #1 Max. Elevation = 291.88 ft Reservoir name = SW PKLOT POND Max. Storage = 24,927 cuft Storage Indication method used. 87 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (min) SW PKLOT POND Hyd. No. 12 -- 25 Year Hyd No. 12 Hyd No. 6 Total storage used = 24,927 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 214 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 13 SE PKLOT POND Hydrograph type = Reservoir Peak discharge = 18.36 cfs Storm frequency = 25 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 52,493 cuft Inflow hyd. No. = 8 - DA #3 Sub Basin #3 Max. Elevation = 291.57 ft Reservoir name = SE PKLOT POND Max. Storage = 17,358 cuft Storage Indication method used. 88 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 21.00 21.00 Q (cfs) Time (min) SE PKLOT POND Hyd. No. 13 -- 25 Year Hyd No. 13 Hyd No. 8 Total storage used = 17,358 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 215 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 14 Post Dev Analysis Pt#1 Hydrograph type = Combine Peak discharge = 114.85 cfs Storm frequency = 25 yrs Time to peak = 791 min Time interval = 1 min Hyd. volume = 1,642,458 cuft Inflow hyds. = 2, 9, 10, 11 Contrib. drain. area = 74.850 ac 89 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) Post Dev Analysis Pt#1 Hyd. No. 14 -- 25 Year Hyd No. 14 Hyd No. 2 Hyd No. 9 Hyd No. 10 Hyd No. 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 216 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 15 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 208.78 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 685,271 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 36.600 90 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (min) Proposed Drainage Area #2 Hyd. No. 15 -- 25 Year Hyd No. 15 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 217 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 16 Post Dev Analysis Pt#2 Hydrograph type = Reservoir Peak discharge = 30.00 cfs Storm frequency = 25 yrs Time to peak = 752 min Time interval = 1 min Hyd. volume = 432,579 cuft Inflow hyd. No. = 15 - Proposed Drainage Area #2Max. Elevation = 291.53 ft Reservoir name = SWMB#1 Max. Storage = 405,154 cuft Storage Indication method used. 91 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (min) Post Dev Analysis Pt#2 Hyd. No. 16 -- 25 Year Hyd No. 16 Hyd No. 15 Total storage used = 405,154 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 218 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 17 Post Dev Analysis Pt#3 Hydrograph type = Combine Peak discharge = 56.95 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 180,713 cuft Inflow hyds. = 7, 12, 13 Contrib. drain. area = 2.130 ac 92 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (min) Post Dev Analysis Pt#3 Hyd. No. 17 -- 25 Year Hyd No. 17 Hyd No. 7 Hyd No. 12 Hyd No. 13 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 219 of 315 Hydrograph Summary Report 93 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 27.60 1 726 91,125 ------ ------------ Post Dev Analysis Pt#4 2 SCS Runoff 131.75 1 791 1,505,130 ------ ------------ DA#1 Sub Basin #1 3 SCS Runoff 335.67 1 719 849,756 ------ ------------ DA#1 Sub Basin #2 4 SCS Runoff 116.16 1 721 355,048 ------ ------------ DA#1 Sub Basin #3 5 SCS Runoff 8.083 1 715 16,832 ------ ------------ DA#1 Sub Basin #4 6 SCS Runoff 35.46 1 721 102,667 ------ ------------ DA #3 Sub Basin #1 7 SCS Runoff 15.28 1 723 46,139 ------ ------------ DA #3 Sub Basin #2 8 SCS Runoff 22.04 1 721 63,807 ------ ------------ DA #3 Sub Basin #3 9 Reservoir 1.601 1 1446 188,264 3 281.23 786,251 SWMB#3 10 Reservoir 7.990 1 773 253,143 4 286.14 235,956 SWMB#2 11 Reservoir 0.000 1 n/a 0 5 286.95 16,832 WAREHOUSE POND 12 Reservoir 33.38 1 723 101,975 6 291.92 25,426 SW PKLOT POND 13 Reservoir 21.52 1 722 60,729 8 291.60 17,621 SE PKLOT POND 14 Combine 140.69 1 791 1,946,537 2, 9, 10, 11, ------------ Post Dev Analysis Pt#1 15 SCS Runoff 241.30 1 724 798,407 ------ ------------ Proposed Drainage Area #2 16 Reservoir 35.53 1 751 545,715 15 292.15 470,214 Post Dev Analysis Pt#2 17 Combine 69.89 1 723 208,843 7, 12, 13, ------------ Post Dev Analysis Pt#3 Novo Nordisk Proposed wbasins Rev 6JWH.gpwReturn Period: 50 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 220 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Post Dev Analysis Pt#4 Hydrograph type = SCS Runoff Peak discharge = 27.60 cfs Storm frequency = 50 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 91,125 cuft Drainage area = 5.350 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 94 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (min) Post Dev Analysis Pt#4 Hyd. No. 1 -- 50 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 221 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 131.75 cfs Storm frequency = 50 yrs Time to peak = 791 min Time interval = 1 min Hyd. volume = 1,505,130 cuft Drainage area = 74.850 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(35.630 x 78) + (38.780 x 93)] / 74.850 95 0 180 360 540 720 900 1080 1260 1440 1620 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) DA#1 Sub Basin #1 Hyd. No. 2 -- 50 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 222 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 335.67 cfs Storm frequency = 50 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 849,756 cuft Drainage area = 36.810 ac Curve number = 93 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 96 0 120 240 360 480 600 720 840 960 1080 1200 1320 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 Q (cfs) Time (min) DA#1 Sub Basin #2 Hyd. No. 3 -- 50 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 223 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 116.16 cfs Storm frequency = 50 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 355,048 cuft Drainage area = 14.570 ac Curve number = 96 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 97 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) DA#1 Sub Basin #3 Hyd. No. 4 -- 50 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 224 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 5 DA#1 Sub Basin #4 Hydrograph type = SCS Runoff Peak discharge = 8.083 cfs Storm frequency = 50 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 16,832 cuft Drainage area = 0.750 ac Curve number = 95 Basin Slope = 3.0 % Hydraulic length = 202 ft Tc method = LAG Time of conc. (Tc) = 2.80 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 98 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (min) DA#1 Sub Basin #4 Hyd. No. 5 -- 50 Year Hyd No. 5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 225 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 6 DA #3 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 35.46 cfs Storm frequency = 50 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 102,667 cuft Drainage area = 4.280 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 500 ft Tc method = LAG Time of conc. (Tc) = 13.00 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 99 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (min) DA #3 Sub Basin #1 Hyd. No. 6 -- 50 Year Hyd No. 6 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 226 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 7 DA #3 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 15.28 cfs Storm frequency = 50 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 46,139 cuft Drainage area = 2.130 ac Curve number = 89 Basin Slope = 0.3 % Hydraulic length = 300 ft Tc method = LAG Time of conc. (Tc) = 15.40 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 100 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) DA #3 Sub Basin #2 Hyd. No. 7 -- 50 Year Hyd No. 7 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 227 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 8 DA #3 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 22.04 cfs Storm frequency = 50 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 63,807 cuft Drainage area = 2.660 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 450 ft Tc method = LAG Time of conc. (Tc) = 12.00 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 101 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (min) DA #3 Sub Basin #3 Hyd. No. 8 -- 50 Year Hyd No. 8 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 228 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 9 SWMB#3 Hydrograph type = Reservoir Peak discharge = 1.601 cfs Storm frequency = 50 yrs Time to peak = 1446 min Time interval = 1 min Hyd. volume = 188,264 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 281.23 ft Reservoir name = SWMB#3 Max. Storage = 786,251 cuft Storage Indication method used. 102 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 Q (cfs) Time (min) SWMB#3 Hyd. No. 9 -- 50 Year Hyd No. 9 Hyd No. 3 Total storage used = 786,251 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 229 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 10 SWMB#2 Hydrograph type = Reservoir Peak discharge = 7.990 cfs Storm frequency = 50 yrs Time to peak = 773 min Time interval = 1 min Hyd. volume = 253,143 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 286.14 ft Reservoir name = SWMB#2 Max. Storage = 235,956 cuft Storage Indication method used. 103 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) SWMB#2 Hyd. No. 10 -- 50 Year Hyd No. 10 Hyd No. 4 Total storage used = 235,956 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 230 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 11 WAREHOUSE POND Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 50 yrs Time to peak = n/a Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - DA#1 Sub Basin #4 Max. Elevation = 286.95 ft Reservoir name = WAREHOUSE POND Max. Storage = 16,832 cuft Storage Indication method used. 104 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (min) WAREHOUSE POND Hyd. No. 11 -- 50 Year Hyd No. 11 Hyd No. 5 Total storage used = 16,832 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 231 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 12 SW PKLOT POND Hydrograph type = Reservoir Peak discharge = 33.38 cfs Storm frequency = 50 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 101,975 cuft Inflow hyd. No. = 6 - DA #3 Sub Basin #1 Max. Elevation = 291.92 ft Reservoir name = SW PKLOT POND Max. Storage = 25,426 cuft Storage Indication method used. 105 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (min) SW PKLOT POND Hyd. No. 12 -- 50 Year Hyd No. 12 Hyd No. 6 Total storage used = 25,426 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 232 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 13 SE PKLOT POND Hydrograph type = Reservoir Peak discharge = 21.52 cfs Storm frequency = 50 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 60,729 cuft Inflow hyd. No. = 8 - DA #3 Sub Basin #3 Max. Elevation = 291.60 ft Reservoir name = SE PKLOT POND Max. Storage = 17,621 cuft Storage Indication method used. 106 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (min) SE PKLOT POND Hyd. No. 13 -- 50 Year Hyd No. 13 Hyd No. 8 Total storage used = 17,621 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 233 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 14 Post Dev Analysis Pt#1 Hydrograph type = Combine Peak discharge = 140.69 cfs Storm frequency = 50 yrs Time to peak = 791 min Time interval = 1 min Hyd. volume = 1,946,537 cuft Inflow hyds. = 2, 9, 10, 11 Contrib. drain. area = 74.850 ac 107 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (min) Post Dev Analysis Pt#1 Hyd. No. 14 -- 50 Year Hyd No. 14 Hyd No. 2 Hyd No. 9 Hyd No. 10 Hyd No. 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 234 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 15 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 241.30 cfs Storm frequency = 50 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 798,407 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 7.19 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 36.600 108 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (min) Proposed Drainage Area #2 Hyd. No. 15 -- 50 Year Hyd No. 15 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 235 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 16 Post Dev Analysis Pt#2 Hydrograph type = Reservoir Peak discharge = 35.53 cfs Storm frequency = 50 yrs Time to peak = 751 min Time interval = 1 min Hyd. volume = 545,715 cuft Inflow hyd. No. = 15 - Proposed Drainage Area #2Max. Elevation = 292.15 ft Reservoir name = SWMB#1 Max. Storage = 470,214 cuft Storage Indication method used. 109 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (min) Post Dev Analysis Pt#2 Hyd. No. 16 -- 50 Year Hyd No. 16 Hyd No. 15 Total storage used = 470,214 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 236 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 17 Post Dev Analysis Pt#3 Hydrograph type = Combine Peak discharge = 69.89 cfs Storm frequency = 50 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 208,843 cuft Inflow hyds. = 7, 12, 13 Contrib. drain. area = 2.130 ac 110 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (min) Post Dev Analysis Pt#3 Hyd. No. 17 -- 50 Year Hyd No. 17 Hyd No. 7 Hyd No. 12 Hyd No. 13 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 237 of 315 Hydrograph Summary Report 111 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft)(ft)(cuft) 1 SCS Runoff 32.48 1 726 107,699 ------ ------------ Post Dev Analysis Pt#4 2 SCS Runoff 152.23 1 791 1,746,420 ------ ------------ DA#1 Sub Basin #1 3 SCS Runoff 380.84 1 719 971,660 ------ ------------ DA#1 Sub Basin #2 4 SCS Runoff 131.33 1 721 403,574 ------ ------------ DA#1 Sub Basin #3 5 SCS Runoff 9.144 1 715 19,170 ------ ------------ DA#1 Sub Basin #4 6 SCS Runoff 40.09 1 721 116,699 ------ ------------ DA #3 Sub Basin #1 7 SCS Runoff 17.47 1 723 53,193 ------ ------------ DA #3 Sub Basin #2 8 SCS Runoff 24.91 1 721 72,528 ------ ------------ DA #3 Sub Basin #3 9 Reservoir 1.776 1 1446 216,522 3 281.78 898,539 SWMB#3 10 Reservoir 13.32 1 754 300,355 4 286.38 255,542 SWMB#2 11 Reservoir 0.108 1 1061 1,807 5 287.00 17,371 WAREHOUSE POND 12 Reservoir 39.23 1 722 116,006 6 291.96 25,768 SW PKLOT POND 13 Reservoir 24.73 1 721 69,446 8 291.62 17,775 SE PKLOT POND 14 Combine 165.42 1 790 2,265,105 2, 9, 10, 11, ------------ Post Dev Analysis Pt#1 15 SCS Runoff 275.53 1 724 918,562 ------ ------------ Proposed Drainage Area #2 16 Reservoir 44.78 1 748 665,867 15 292.76 538,125 Post Dev Analysis Pt#2 17 Combine 81.36 1 722 238,645 7, 12, 13, ------------ Post Dev Analysis Pt#3 Novo Nordisk Proposed wbasins Rev 6JWH.gpwReturn Period: 100 Year Monday, 09 / 25 / 2017 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 238 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 1 Post Dev Analysis Pt#4 Hydrograph type = SCS Runoff Peak discharge = 32.48 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 107,699 cuft Drainage area = 5.350 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 112 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (min) Post Dev Analysis Pt#4 Hyd. No. 1 -- 100 Year Hyd No. 1 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 239 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 152.23 cfs Storm frequency = 100 yrs Time to peak = 791 min Time interval = 1 min Hyd. volume = 1,746,420 cuft Drainage area = 74.850 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(35.630 x 78) + (38.780 x 93)] / 74.850 113 0 180 360 540 720 900 1080 1260 1440 1620 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (min) DA#1 Sub Basin #1 Hyd. No. 2 -- 100 Year Hyd No. 2 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 240 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 380.84 cfs Storm frequency = 100 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 971,660 cuft Drainage area = 36.810 ac Curve number = 93 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 114 0 120 240 360 480 600 720 840 960 1080 1200 1320 Q (cfs) 0.00 0.00 60.00 60.00 120.00 120.00 180.00 180.00 240.00 240.00 300.00 300.00 360.00 360.00 420.00 420.00 Q (cfs) Time (min) DA#1 Sub Basin #2 Hyd. No. 3 -- 100 Year Hyd No. 3 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 241 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 131.33 cfs Storm frequency = 100 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 403,574 cuft Drainage area = 14.570 ac Curve number = 96 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 115 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) DA#1 Sub Basin #3 Hyd. No. 4 -- 100 Year Hyd No. 4 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 242 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 5 DA#1 Sub Basin #4 Hydrograph type = SCS Runoff Peak discharge = 9.144 cfs Storm frequency = 100 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 19,170 cuft Drainage area = 0.750 ac Curve number = 95 Basin Slope = 3.0 % Hydraulic length = 202 ft Tc method = LAG Time of conc. (Tc) = 2.80 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 116 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (min) DA#1 Sub Basin #4 Hyd. No. 5 -- 100 Year Hyd No. 5 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 243 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 6 DA #3 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 40.09 cfs Storm frequency = 100 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 116,699 cuft Drainage area = 4.280 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 500 ft Tc method = LAG Time of conc. (Tc) = 13.00 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 117 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (min) DA #3 Sub Basin #1 Hyd. No. 6 -- 100 Year Hyd No. 6 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 244 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 7 DA #3 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 17.47 cfs Storm frequency = 100 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 53,193 cuft Drainage area = 2.130 ac Curve number = 89 Basin Slope = 0.3 % Hydraulic length = 300 ft Tc method = LAG Time of conc. (Tc) = 15.40 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 118 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) DA #3 Sub Basin #2 Hyd. No. 7 -- 100 Year Hyd No. 7 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 245 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 8 DA #3 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 24.91 cfs Storm frequency = 100 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 72,528 cuft Drainage area = 2.660 ac Curve number = 96 Basin Slope = 0.6 % Hydraulic length = 450 ft Tc method = LAG Time of conc. (Tc) = 12.00 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 119 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (min) DA #3 Sub Basin #3 Hyd. No. 8 -- 100 Year Hyd No. 8 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 246 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 9 SWMB#3 Hydrograph type = Reservoir Peak discharge = 1.776 cfs Storm frequency = 100 yrs Time to peak = 1446 min Time interval = 1 min Hyd. volume = 216,522 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 281.78 ft Reservoir name = SWMB#3 Max. Storage = 898,539 cuft Storage Indication method used. 120 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 60.00 60.00 120.00 120.00 180.00 180.00 240.00 240.00 300.00 300.00 360.00 360.00 420.00 420.00 Q (cfs) Time (min) SWMB#3 Hyd. No. 9 -- 100 Year Hyd No. 9 Hyd No. 3 Total storage used = 898,539 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 247 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 10 SWMB#2 Hydrograph type = Reservoir Peak discharge = 13.32 cfs Storm frequency = 100 yrs Time to peak = 754 min Time interval = 1 min Hyd. volume = 300,355 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 286.38 ft Reservoir name = SWMB#2 Max. Storage = 255,542 cuft Storage Indication method used. 121 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) SWMB#2 Hyd. No. 10 -- 100 Year Hyd No. 10 Hyd No. 4 Total storage used = 255,542 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 248 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 11 WAREHOUSE POND Hydrograph type = Reservoir Peak discharge = 0.108 cfs Storm frequency = 100 yrs Time to peak = 1061 min Time interval = 1 min Hyd. volume = 1,807 cuft Inflow hyd. No. = 5 - DA#1 Sub Basin #4 Max. Elevation = 287.00 ft Reservoir name = WAREHOUSE POND Max. Storage = 17,371 cuft Storage Indication method used. 122 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (min) WAREHOUSE POND Hyd. No. 11 -- 100 Year Hyd No. 11 Hyd No. 5 Total storage used = 17,371 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 249 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 12 SW PKLOT POND Hydrograph type = Reservoir Peak discharge = 39.23 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 116,006 cuft Inflow hyd. No. = 6 - DA #3 Sub Basin #1 Max. Elevation = 291.96 ft Reservoir name = SW PKLOT POND Max. Storage = 25,768 cuft Storage Indication method used. 123 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (min) SW PKLOT POND Hyd. No. 12 -- 100 Year Hyd No. 12 Hyd No. 6 Total storage used = 25,768 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 250 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 13 SE PKLOT POND Hydrograph type = Reservoir Peak discharge = 24.73 cfs Storm frequency = 100 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 69,446 cuft Inflow hyd. No. = 8 - DA #3 Sub Basin #3 Max. Elevation = 291.62 ft Reservoir name = SE PKLOT POND Max. Storage = 17,775 cuft Storage Indication method used. 124 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (min) SE PKLOT POND Hyd. No. 13 -- 100 Year Hyd No. 13 Hyd No. 8 Total storage used = 17,775 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 251 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 14 Post Dev Analysis Pt#1 Hydrograph type = Combine Peak discharge = 165.42 cfs Storm frequency = 100 yrs Time to peak = 790 min Time interval = 1 min Hyd. volume = 2,265,105 cuft Inflow hyds. = 2, 9, 10, 11 Contrib. drain. area = 74.850 ac 125 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 180.00 180.00 Q (cfs) Time (min) Post Dev Analysis Pt#1 Hyd. No. 14 -- 100 Year Hyd No. 14 Hyd No. 2 Hyd No. 9 Hyd No. 10 Hyd No. 11 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 252 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 15 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 275.53 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 918,562 cuft Drainage area = 36.600 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 36.600 126 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (min) Proposed Drainage Area #2 Hyd. No. 15 -- 100 Year Hyd No. 15 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 253 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 16 Post Dev Analysis Pt#2 Hydrograph type = Reservoir Peak discharge = 44.78 cfs Storm frequency = 100 yrs Time to peak = 748 min Time interval = 1 min Hyd. volume = 665,867 cuft Inflow hyd. No. = 15 - Proposed Drainage Area #2Max. Elevation = 292.76 ft Reservoir name = SWMB#1 Max. Storage = 538,125 cuft Storage Indication method used. 127 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (min) Post Dev Analysis Pt#2 Hyd. No. 16 -- 100 Year Hyd No. 16 Hyd No. 15 Total storage used = 538,125 cuft Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 254 of 315 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 09 / 25 / 2017 Hyd. No. 17 Post Dev Analysis Pt#3 Hydrograph type = Combine Peak discharge = 81.36 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 238,645 cuft Inflow hyds. = 7, 12, 13 Contrib. drain. area = 2.130 ac 128 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (min) Post Dev Analysis Pt#3 Hyd. No. 17 -- 100 Year Hyd No. 17 Hyd No. 7 Hyd No. 12 Hyd No. 13 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 255 of 315 Novo Nordisk Clayton, NC Appendix II Nitrogen Calculations Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 256 of 315 DAPI‐US Nitrogen Analysis Scenario B ‐ Credit for Wet Ponds 2 & 3 only  9/25/2017 ‐ Rev4 JHEALD  1234 Pond 2 & 3 Pond 1&1A S PK Lot Buildings 335648.82 384.00 25947.00 0.00 Parking 83300.37 0.00 181955.89 0.00 Pavement 306441.93 96705.16 20327.50 0.00 Sidewalks 78439.04 7651.83 12464.56 0.00 Equipment 171663.52 10996.73 0.00 0.00 Gravel 109879.41 0.00 0.00 0.00 Sub Total Impervious (sq ft) 1085373.09 115737.72 240694.95 0.00 Sub Total Impervious (ac) 24.92 2.66 5.53 0.00 21.2 Nitrogen Exported (lbs/yr)528.23 56.33 117.14 0.00 Landscaping 2295164.51 1351603.78 66227.45 233059.69 Sub Total Open (sq ft) 2295164.51 1351603.78 66227.45 233059.69 Sub Total Open (ac) 52.69 31.03 1.52 5.35 1.2 Nitrogen Exported (lbs/yr)63.23 37.23 1.82 6.42 Ponds 319294.80 126759.60 22651.20 0.00 Wetlands 1682055.03 0.00 65340.00 0.00 Sub Total Protected (sq ft) 2001349.83 126759.60 87991.20 0.00 Sub Total Protected (ac) 45.94 2.91 2.02 0.00 Phase 1 Development Drainage Point Area (sq ft) 0.6 Nitrogen Exported (lbs/yr)27.57 1.75 1.21 0.00 SUB TOTAL NITROGEN  EXPORT (lb/yr) 619.03 95.31 120.18 6.42 Credit Wet Ponds 0.25 0.00 0.00 0.00 Credit Dry Ponds 0.00 0.00 0.00 0.00 Credit Wetlands 0.00 0.00 0.00 0.00 Total Credit 0.25 0.00 0.00 0.00  TOTAL NITROGEN EXPORT  (lb/yr)464.27 95.31 120.18 6.42 686.18 (lb/yr) TOTAL AREA (sq ft) 5381887.43 1594101.10 394913.60 233059.69 TOTAL AREA (ac) 123.55 36.60 9.07 5.35 174.56 (ac) Nitrogen Loading Rate  (lb/ac/yr)3.93 (lb/ac/yr) Over/Under 0.33 (lb/ac/yr) $/LB yrs Payment 28.35 30 $49,118.86 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 257 of 315 DAPI‐US Nitrogen Analysis Scenario B ‐ Credit for Wet Ponds 2 & 3 only  9/26/2017 ‐ Rev4 JHEALD  1234 Pond 2 & 3 Pond 1&1A S PK Lot Buildings 466160.70 336294.35 25947.00 0.00 Parking 102149.37 77771.87 182955.89 0.00 Pavement 306441.93 178761.46 20327.50 0.00 Sidewalks 72787.48 29823.73 12464.56 0.00 Equipment 171663.52 86477.86 0.00 0.00 Gravel 109879.41 0.00 0.00 0.00 Sub Total Impervious (sq ft) 1229082.41 709129.27 241694.95 0.00 Sub Total Impervious (ac) 28.22 16.28 5.55 0.00 21.2 Nitrogen Exported (lbs/yr)598.18 345.12 117.63 0.00 Landscaping 2151455.19 758212.23 65227.45 233059.69 Sub Total Open (sq ft) 2151455.19 758212.23 65227.45 233059.69 Sub Total Open (ac) 49.39 17.41 1.50 5.35 1.2 Nitrogen Exported (lbs/yr)59.27 20.89 1.80 6.42 Ponds 319294.80 126759.60 22651.20 0.00 Wetlands 1682055.03 0.00 65340.00 0.00 Sub Total Protected (sq ft) 2001349.83 126759.60 87991.20 0.00 Sub Total Protected (ac) 45.94 2.91 2.02 0.00 0.6 Nitrogen Exported (lbs/yr)27.57 1.75 1.21 0.00 SUB TOTAL NITROGEN  EXPORT (lb/yr) 685.01 367.76 120.64 6.42 Credit Wet Ponds 0.25 0.00 0.00 0.00 Credit Dry Ponds 0.00 0.00 0.00 0.00 Credit Wetlands 0.00 0.00 0.00 0.00 Total Credit 0.25 0.00 0.00 0.00  TOTAL NITROGEN EXPORT  (lb/yr)513.76 367.76 120.64 6.42 1008.57 (lb/yr) TOTAL AREA (sq ft) 5381887.43 1594101.10 394913.60 233059.69 TOTAL AREA (ac) 123.55 36.60 9.07 5.35 174.56 (ac) Nitrogen Loading Rate  (lb/ac/yr)5.78 (lb/ac/yr) Over/Under 2.18 (lb/ac/yr) $/LB yrs Payment 28.35 30 $323,314.73 Planned Facility Build‐Out Drainage Point Area (sq ft) Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 258 of 315 Novo Nordisk Clayton, NC Appendix III Pipe and Swale Calculations Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 259 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 260 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 261 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 262 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 263 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 264 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 265 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 266 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 267 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 268 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 269 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 270 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 271 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 272 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 273 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 274 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 275 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 276 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 277 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 278 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 279 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 280 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 281 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 282 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 283 of 315 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 284 of 315 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 285 of 315 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 286 of 315 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 287 of 315 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 288 of 315 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 289 of 315 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 290 of 315 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 291 of 315 8 8.06.4 Rev. 12/93 Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 292 of 315 Novo Nordisk Clayton, NC Appendix IV Silt Fence Calculations Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 293 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 294 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 295 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 296 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 297 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 298 of 315 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 299 of 315 Appendix D Inspection Log and Reports Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 300 of 315 SWPPP Inspection Log Name of Construction Site Location of Construction Site Date of Inspection Inspector Name Does Inspection Report require maintenance of installed BMPs? Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 301 of 315 SWPPP Inspection Log (Continued) Date of Inspection Inspector Name Does Inspection Report require maintenance of installed BMPs? Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 302 of 315 Appendix E Rainfall Log and Reports Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 303 of 315 31 SWPPP Rainfall Records (January - June) Year: January Rainfall February Rainfall March Rainfall April Rainfall May Rainfall June Rainfall 1 1 1 1 1 1 2 2 2 2 2 2 3 3 3 3 3 3 4 4 4 4 4 4 5 5 5 5 5 5 6 6 6 6 6 6 7 7 7 7 7 7 8 8 8 8 8 8 9 9 9 9 9 9 10 10 10 10 10 10 11 11 11 11 11 11 12 12 12 12 12 12 13 13 13 13 13 13 14 14 14 14 14 14 15 15 15 15 15 15 16 16 16 16 16 16 17 17 17 17 17 17 18 18 18 18 18 18 19 19 19 19 19 19 20 20 20 20 20 20 21 21 21 21 21 21 22 22 22 22 22 22 23 23 23 23 23 23 24 24 24 24 24 24 25 25 25 25 25 25 26 26 26 26 26 26 27 27 27 27 27 27 28 28 28 28 28 28 29 29 29 29 29 29 30 30 30 30 30 31 31 31 SWPPP Rainfall Records (July - December) Year: July Rainfall August Rainfall September Rainfall October Rainfall November Rainfall December Rainfall Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 304 of 315 32 1 1 1 1 1 1 2 2 2 2 2 2 3 3 3 3 3 3 4 4 4 4 4 4 5 5 5 5 5 5 6 6 6 6 6 6 7 7 7 7 7 7 8 8 8 8 8 8 9 9 9 9 9 9 10 10 10 10 10 10 11 11 11 11 11 11 12 12 12 12 12 12 13 13 13 13 13 13 14 14 14 14 14 14 15 15 15 15 15 15 16 16 16 16 16 16 17 17 17 17 17 17 18 18 18 18 18 18 19 19 19 19 19 19 20 20 20 20 20 20 21 21 21 21 21 21 22 22 22 22 22 22 23 23 23 23 23 23 24 24 24 24 24 24 25 25 25 25 25 25 26 26 26 26 26 26 27 27 27 27 27 27 28 28 28 28 28 28 29 29 29 29 29 29 30 30 30 30 30 30 31 31 31 31 Novo Nordisk DAPI-USDAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017Page 305 of 315 Appendix F Additional Site Logs and Records SWPPP Pre-Construction Conference Attendance Log Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 306 of 315 Date & Time Description/Outline and Name of the Presenter of SWPPP and Site Requirements Name Company Signature SWPPP Pre-Construction Conference Attendance Log (Continued) Name Company Signature Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 307 of 315 SWPPP Contractor & Sub-Contractor Log Name of Construction Site Location of Construction Site Company/Individual Name Work Responsibilities 1.) Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 308 of 315 Start Date: Completion Date: 2.) Start Date: Completion Date: 3.) Start Date: Completion Date: 4.) Start Date: Completion Date: 5.) Start Date: Completion Date: 6.) Start Date: Completion Date: 7.) Start Date: Completion Date: 8.) Start Date: Completion Date: 9.) Start Date: Completion Date: 10.) Start Date: Completion Date: SWPPP Contractor & Sub-Contractor Log (Continued) 11.) Start Date: Completion Date: 12.) Start Date: Completion Date: 13.) Start Date: Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 309 of 315 Completion Date: 14.) Start Date: Completion Date: 15.) Start Date: Completion Date: 16.) Start Date: Completion Date: 17.) Start Date: Completion Date: 18.) Start Date: Completion Date: 19.) Start Date: Completion Date: 20.) Start Date: Completion Date: 21.) Start Date: Completion Date: SWPPP Modification Log Name of Construction Site Location of Construction Site Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 310 of 315 Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: SWPPP Modification Log (Continued) Name of Construction Site Location of Construction Site Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 311 of 315 Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: Type of Modification Description of Modification Location of Modification Major Minor Start Date: Completion Date: Reason for Modifications: Approved/Implemented By: SWPPP Soil Stabilization Log Name of Construction Site Location of Construction Site Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 312 of 315 Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: SWPPP Soil Stabilization Log (Continued) Name of Construction Site Location of Construction Site Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 313 of 315 Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization Final Temporary Initiate Date: Completion Date: Additional work proposed for this area: Inspection Frequency for Stabilized Area: Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 314 of 315 Appendix G Construction General Permit A copy of the NPDES General Permit for Stormwater Discharges from Construction Activities can be found at the following address: http://portal.ncdenr.org/web/lr/stormwater Novo Nordisk DAPI-US DAPI-US-INFR-PLAN-XX010-003 REV 005 26-SEP-2017 Page 315 of 315