Loading...
HomeMy WebLinkAbout20170151 Ver 2_Build Maps_20171213 (2)WETLAND PERMIT IMPACT SUMMARY Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 27+80RT Culvert Extension & Basin 0.02 < 0.01 135 25 2 -L- 27+OORT Roadwa Fill < 0.01 0.04 3 -Y1-15+00 to 16+30 Brid e Removal 0.10 TOTALS': < 0.01 0.04 0.02 0.11 135 25 0 'Rounded totals are sum of actual impacts NOTES: Bridge removal temporary impacts are for use of cofferdams to remove interior mass concrete bents. September 2014