Loading...
HomeMy WebLinkAbout20140762 Ver 3_SAW-2012-00882_TIP NO R 2915_SLAUGHTER_20171208Regulatory Division DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 December 7, 2017 SUBJECT: Action ID SAW-2012-00882; TIP No. R-2915 NCDOT Division 11 Attn: Mr. Heath Slaughter 801 Statesville Road North Wilkesboro, North Carolina 28659 Dear Mr. Slaughter: Reference the Department of the Army permit issued to the North Carolina Department of Transportation (NCDOT) on January 7, 2015, to authorize the discharge of fill rnaterial into waters of the United States, for construction of TIP R-2915, 5ection A- E of the widening of US Highway 221 from US 421 to US 221 Business/NC 88, in Watauga and Ashe Counties, Noi�th Carolina, and the subsequent modification dated August 31, 2016. Also, please reference your November 20, 2017 email, requesting modification of the permit to authorize an increase (1,725 s fl in the size of the southern temporary construction access causeway under the old bridge crossing the South Fork New River. The increased impacts are necessary because of the condition of the old bridge, NCDOT has concerns about sections of the old bridge falling into the river as pieces are cut. The expanded causeway would catch those sections if they fall. This is a parallel impact to the causeway on the other side from a linear foot perspective but will be a larger area of temporary impact than shovtm in the fmal plans. The causeways will not extend mare than halfway across the river at any one time. We have reviewed the requested modification, and have determined that it is appropriate and reasonable, and, since it is minimal, does not require public notice. Therefore, the permit is hereby modified to include the requested change, as shown in the annotated drawing (attached) with the November 20, 2017 email, for a net increase in temporary stream impacts of 1,725 square feet (no increase in stream length impacted). No additional compensatory mitigation is required for this modification. All other conditions of the permit, including the pernut expuation date of Decernber 31, 2019, and the previous mitigation requirements, remain applicable. -2- Should you have any questions, please call Mr. Eric Alsmeyer at (919) 554-4884, extension 23. FOR THE COMMANDER / ,� '� �"' " � civ Hem•y M. Wicker, Jr. Deputy Chief, Regulatory Division Enclosures Copies Futnished: Mr. David Wanucha 450 West Hanes Mill Road, Suite 300 Winston-Salem, North Carolina 27105 Ms. Carla Dagnino North Carolina Department of Transportation Division of Highways Environmental Analysis Unit 1598 Mail Service Center Raleigh, North Carolina 27699-1598 365i su.znazaa -'. mn u c u. n.-.m a..en-� _�. L '110N[%:T�IM�' . k«o urr� n surv¢ n.mn:— SPAN p ��ux u i�.i o [.o- —ELiRI� I �E�.:lfs= 'i.zc� 1�. FNO HFNi 9 IIIIIEtR1.4 ..__-- . . . . . .£^' _ ��'�` I SPAN � ��-o" l0'-0" PS AN C � a IA]rL 2[[sinr . ' �m.� vasn�iv¢ : �o� rnn� rm + �zcEv _ *a Eq:.o a�o�. ;,a��E—� «.: . ,_ E�:,:e � vanuu wmcr, � r �� � � � a�i o" ��l r r �q I rya:l ]Loa( mJ/pR01T 1 I � � L20ii= ��"-`-� `0 `� ' ^�[ ��i� � —{ � _ `E6 3tlPf `\ �t. i4lY. `[L204Ra [Li.lASa !LdOq \ E4]N9a IGJ YWi `W�LI(4 NA r-HK Tn.l BENT •I (�T e P 0E 2 Elv� 3ENT�. n �prt[coy.� SECTION ALONG WORK LINE ���Q �' �./ ��.e. reode�s r 5iP-p227�4a o.>uum. ' +;.ncm. �.:.siz: >.r,.sn.00 B�"c _ iei�.ae GRAOE OGTA -�� ELo �P�^1e5ilqE0 imlC�p9E IXCq<l lfr� PLAN wuu xm smnu m ri ii� vnm � � a � -P915E _ COUNT' i7.=i? -L- ..c., en-aw co. �EPARiMENT �F iR4N5P�RTATIOR PRELSIAIN4RY GENERAL DRAWING SOl1TH R ORY,EN�'N� RIVEfi BETY'[ENSSRZI103 & SR 1169