Loading...
HomeMy WebLinkAbout20171575 Ver 1_SF-280082_Cover Letter_20171211_20171211. ;;simri�; �yy'd` �„ �m h�o � �y ."�y � q2p d � . 2ay`l. +�,����,m�� �a2cb5 „`�u°,""'";"°�''' STATE OF NORTH CAROLINA DEPARTN�NT OF TRANSPORTATION ROY COOPER GOVERNOR December 11 2017 Mr. James Lastinger US Army Corps of Engineers 3331 Heritage Trade Dr. Suite 105 Wake Forest, NC 27615 SUBJECT: Nationwide Permit # 14 JAMES H. TROGDON, III SECRETARY Bridge No. 82 on NC 47 over Lick Creek, Class C, Davidson County, NC, WBS Project No.: 17BP.9.R.73 Dear Mr. Lastinger, We are requesting a Nationwide 14 permit for replacement of three-span Bridge No. 82 with a two- span bridge on NC 47 over Lick Creek (Class C) in Davidson County. I have attached a pre- construction notiiication application, vicinity and topographical map with the project area called out, a No Survey Required form for Historic Architecture', and a'No Archaeological sites are present or Affected' form for Archeology, and a Mitigation Acceptance Letter from NC Division of Mitigation Services (NCDMS). Also attached are the Permit Drawings including a Stormwater Management Plan. The project will permanently impact 2361inear feet (Lick Creek: 82' bank stabilization; Intermittent UT to Lick Creek upstream of NC 47: 112' stream relocation/54" pipe extension; UT downstream of NC 47: 32' S4" pipe extension, 10' bank stabilization) and 0.03 acres of wetlands due to roadway iill. The project will temporarily impact 241inear feet (Lick Creek: 10' temporary dewatering/waterline installation; UT upstream of NC 47: 7' temporary dewatering; UT downstream of NC 47: 7' temporary dewatering). Impacts to UT to Lick Creek were separated up and downstream of NC 47 due to the differing stream quality classifications. NCSAM forms showed a low quality stream upstream of the pipe, so 1:1 mitigation is being proposed for the 112' of impacts upstream of the existing road, and 2:1 mitigation is being proposed downstream of the existing road. NCSAM forms are attached for reference. The existing 54" pipe is steeper than 2% and is not buried — the proposed extension is not proposed to be buried either. The USFWS lists Schweinitz's sunflower (Helianthus schweinitzii) as endangered and Northern Long-Eared bat (NLEB-Myotis septentrionalis) as threatened for Davidson County. Due to habitat in the project area for Schweinitz's sunflower a survey was conducted on September 20, 2016. No individuals were located. Therefore, it was determined that there will be `no effect' on Schweinitz's Sunflower. We determined that the project'May Affect but is Not Likely to Adversely Affect' the NLEB. Anticipated tree clearing impacts for this project are estimated to be MailingAddress.• Telephone.• (336) 747-7800 Location: NC DEPARTMENT OF TRANSPORTATION Fax: (336) 703-6693 375 SILAS CREEK PARKWAY DIVISION 9 Customer Service.• 1-877-368-4968 WINSTON-SALEM, NC 27127 375 SILAS CREEK PARKWAY WINSTON-SALEM, NC 27127 Website: www.ncdot.gov 0.3 acres. A NLEB Screening checklist is attached. Thus, for the proposed action, NCDOT has committed to the conservation measures listed below: 1. No alterations of a known hibernaculum's entrance or interior environment if it impairs an essential behavioral pattern, including sheltering Northern long-eared bats (January 1 through December 31); 2. No tree removal within a 0.25 mile radius of a known hibernacula (January 1 through December 31); and 3. No cutting or destroying a known, occupied maternity roost tree, or any other trees within a 150-foot radius from the known, occupied maternity tree during the period from June 1 through and including July 31. NCDOT has deternuned that the proposed action does not require separate consultation on the grounds that the proposed action is consistent with the final Section 4(d) rule, codified at 50 C.F.R. § 17.40(0) and effective February 16, 2016. Section 7 responsibilities are therefore considered fulfilled. By copy of this letter, we also request 401 review and approval from the NC Division of Water Resources with one copy of the application package provided to Amy Chapman, Transportation Permitting Unit Supervisor, and Dave Wanucha, DOT Project Coordinator. Please charge the application fee of $270 to WBS Project No. 17BP.9.R.73. If you have any questions, comments or need additional information after reviewing this material please contact Amy Euliss at (336) 747-7800. Thank you for your cooperation in this matter. Sincerely, DocuSigned by: aw�� �SS CB53851 D524244B... Amy Euliss Division Environmental Officer, NCDOT Division 9 Attachments: Application package and plans CC: Amy Chapman, NCDEQ-DWR, Transportation Pernutting Unit Supervisor, e- copy Dave Wanucha, NCDEQ-DWR, Environmental Specialist, e-copy Kelly Seitz, PE, Davidson Resident Engineer, e-copy Phil Suggs, Division 9 and 10 Roadside Environmental Engineer, e-copy Beth Harmon, NCDEQ-DMS, e-copy Eileen Fuchs, NCDOT Priority Projects Unit, e-copy