Loading...
HomeMy WebLinkAbout20081156 Ver 1_Certification of Completion_20090120Land Planning Engineering Land Surveying ESE of North Carolina, P.C. 2310 T.W. Alexander Drive, Suite J Phone: 919-321-0408 Raleigh, NC 27617 Fax: 919-321-0412 LETTER OF TRANSMITTAL ADM-FRM-0017 Attention: 401 Oversight/Express Permittin Unit Date 14 January 2009 Address: North Carolina Division of Water Quality Project Number: 2647 1650 Mail Service Center Raleigh, NC 27699-1650 Phone Number: Project Name: Estates at Olde Carpenter We are sending you: ® Attached ? Under Separate Cover VIA: ® US Mail ? Courier/Delivery ? Overnight Carrier ? Interoffice Mail ? Pick-up ? Other The following items: ? Prints/Plans ? Specifications ? Disk ® Other No. of Copies Date No. Description 1 Original - Certification of ComDletion These are Transmitted: ? For approval ? For your use ® As Requested ? For review and Comment ? Other Remarks: Required as a condition of approval for DWQ Project No. 08-1156. Signed: lenn hillips ESE Consultants, Inc. CC: Chris Mendez w/encl. Lee Honeycutt w/encl. If enclosures are not as noted, kindly notify us at once 12&99 V fS D JAN 2 o 2009 DENR - WATER Qmp WETLANDS AND STORMWATER BRANCH Jan. 1, 2 0 0 9 11:01RM Toll Brothers Inc Certification of Completion DWQ Project No.: Applicant: Project Narne: Date of Issuance of Wetland Permit: No.3632 P. 3 I? . .?-. ? ooh Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail gervice Center, Raleigh, NC, 27699-1650. This form may be returriod to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification , hereby state that, to the best of my abilities, due care and diligence was used to the observation of the construction such that.-the' construction was observed to be built within, substantial compliance and intent of the. 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other suppo Signature: Agent's Date: 8 Sew?. O0.) hereby,state that, to the best of my abilities, due care and diligence was used in. the observation- of the construction such that the construction `was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and-Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date; If this project was designed by -a Certified Professional as a duly registered Professional n ??n ?(Le., Engineer, Landscape Architect, Surveyor., etc.) the State of North Carolina, having been authorized observe (periodically, weekly, full time) the construction of the project; for the Permittee hereby state.that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and - intent of the 401 Water Quakt,,:Ce?rtifcation aad Buffer Rules; the approved. plans and.:... specifications, and other supporting materials. ?y g``t Signature: ti Regi at Date a Ta, b" SEAL r i q 17,339 C?C??aL D 2009 ?•. M. Pl???;!* JAN S-0 ?`+'taesdeeere SNgHp g ?M?W??1ER BRN?? O$- 11540 County: s mead t4 e is©w