Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20140957 Ver 2_Access Roads 111-116_20171208
0 N /L/�Lf1 O V) 0 a O D_ N N w U U a U W N OffW / V) W V) 0 Q O Of V) N W U Q D_ W N I n N W J_ LL_ 0 Q U J r z LLJ 2 z O D_ z a o' D V) F_ 0_ a I o_ D_ W N I D_ W V) Q ry I Q c� I U z 0 rn LO LO I O LO O O z W J LL_ Q U Cad © 2017 GAI Consultants, Inc. THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. LEGEND PROPERTY LINE — — — — — — — — — STORM SEWER X X FENCE E UNDERGROUND ELECTRIC STREAM W WATER LINE _G—G— EXISTING GAS PIPELINE SAN SANITARY SEWER OH OVERHEAD UTILITY LINES EDGE OF GRAVEL ACCESS ROAD PROPOSED GAS PIPELINE PROPOSED PERMANENT EASEMENT PROPOSED GAS PIPELINE (NO GROUND SURVEY) EXTRA WORK SPACE TOPSOIL SEGREGATION AREA AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. WETLAND UTILITY POLE (COLOR SHOWN TO PROVIDE CLARITY ONLY) BORE PIT NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE E&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). ACCESS ROAD DETAIL 22 THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: 1 " = 200' 200' 0 200' 400' NOTES: 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81' W. 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014. 3. IMAGERY TAKEN FROM GOOGLE EARTH. 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. 7. ALL STATIONING SHOWN IS SLOPE STATIONING. 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4 NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE UATE EXISTING O DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. `ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE. 12. THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. PERMANENT WATERBAR/SLOPE BREAKER LOD LIMIT OF DISTURBANCE Q TEMPORARY WATERBAR/SLOPE BREAKER BSRF BELTED SILT RETENTION Ep TRENCH BREAKER/PLUG � FENCE (BSRF) O STREAM CROSSING Zz COIR LOG U p C7 COMPOST FILTER SOCK W USFWS STREAM CROSSING WITH ENHANCED p OCONTROLS (COMPOST FILTER SOCK TO BE USED X ORANGE SAFETY FENCE w AT THE UPLAND/WATERBODY BOUNDARY W ROADSIDE DITCH CL IN PLACE OF BSRF) cn m z CuB SOIL TYPE V1 CONSTRUCTION ENTRANCE WITH DITCH ail MQ CULVERT AS NEEDED ♦ GENERALIZED SURFACE WATER FLOW CULVERT/ACCESS ROAD WATERBARS => SURFACE WATER FLOW WITHIN ROW T(; TURBIDITY CURTAIN (PLAN VIEW) WATERBAR OUTLET (PLAN VIEW) o a WATERBAR (PLAN VIEW) � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) INLET/OUTLET PROTECTION THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: 1 " = 200' 200' 0 200' 400' NOTES: 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81' W. 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014. 3. IMAGERY TAKEN FROM GOOGLE EARTH. 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. 7. ALL STATIONING SHOWN IS SLOPE STATIONING. 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4 NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE UATE EXISTING O DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. `ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE. 12. THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. n z n o ino_ 0 z rL W w � z 0 U Zz W U p C7 0 W p U z in w W CL oN cn m z 0 V1 ail MQ � d (L H O Z\= � 0 Y o a U n Q z n o CHECKED: 0 J cn CV O " V LIJ Z z V / Z O U) LL I it SCALE: AS SHOWN DATE: Q z J o CHECKED: 0 J cn CV U " V LIJ Z LL1 J F- Zz za J Of 0 z J0 LLl vs 0 ,rj La N in N�0 ~�m (� oN 0 O m QUN V2Y Uo� MQ � z o H O Z\= � N z o a LO CD SCALE: AS SHOWN DATE: 11/17/17 DRAWN: GPT CHECKED: DLF'I APPROVED: NET gai consultants - NC, inc. I 4198 COX ROAD SUITE 114 GLEN ALLEN, VA 23060 804-270-9357 N.C. COL #F-0269 PROJECT N0./DASH NO. 140468 TASK N0. TASK N0. 001, ISUB 00 GROUP ID DRAWING NO. D I E111 AR -111 N /L/��f1 O N 0 Q O D_ V) V) W U U Q U W N OffW N L W N 0 Q O Of V) N W U Q D_ W N I N W J_ LL - 0 Q U J r z W 2 z O D_ 0 z_ Q o' D V) F_ D_ Q I o_ D_ W N I D_ W V) Q ry I Q c� I U z 0 n LO I O LO O © 2017 GAI Consultants, Inc. n z n GPT ino_ Z Q U J= z rL w w � z 0 U Naz W U p C7 COIR LOG W UAV) p (0 C-) � M W U z H w � w C) W P sti CL 1� N cn z 0 ROADSIDE DITCH N_ IN PLACE OF BSRF) ail d SOIL TYPE a CONSTRUCTION ENTRANCE WITH DITCH 0 Y ♦ GENERALIZED SURFACE WATER FLOW U n Q ZO n GPT ACCESS ROAD Z Q U J= o DETAIL 23 J W p of w O Ep z V / Z O U) LL I it ,4,11....lfllf 111 �N CAR U25` 47 lJ � 11 T"VA,- � 'pl G�YI •' •� y� '! 4. Ro 4 \\ \ \\ Q ZO o J � L!J Z N GPT ACCESS ROAD Z Q U J= o DETAIL 23 J W p of w w N N Ep a_o z —20 Naz ~m STREAM CROSSING Cl -N 0 00 m COIR LOG QW z UAV) A (0 C-) � M W 00 O m H w � • C) g P sti X 1� N THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. LEGEND PROPERTY LINE - — — — — — — — - STORM SEWER X X FENCE E UNDERGROUND ELECTRIC STREAM W WATER LINE —G—G— EXISTING GAS PIPELINE SAN SANITARY SEWER OH OVERHEAD UTILITY LINES EDGE OF GRAVEL ACCESS ROAD PROPOSED GAS PIPELINE PROPOSED PERMANENT EASEMENT PROPOSED GAS PIPELINE (NO GROUND SURVEY) EXTRA WORK SPACE TOPSOIL SEGREGATION AREA AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. WETLAND UTILITY POLE (COLOR SHOWN TO PROVIDE CLARITY ONLY) BORE PIT NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE E&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). ACCESS ROAD DETAIL 24 THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: 1 " = 200' 200' 0 200' 400' NOTES: 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81' W. 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014. 3. IMAGERY TAKEN FROM GOOGLE EARTH. 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. 7. ALL STATIONING SHOWN IS SLOPE STATIONING. 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4 NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE UATE EXISTING O DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. `ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE. 12. THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. SCALE: AS SHOWN DATE: PERMANENT WATERBAR/SLOPE BREAKER LOD GPT LIMIT OF DISTURBANCE Q TEMPORARY WATERBAR/SLOPE BREAKER BSRF BELTED SILT RETENTION Ep TRENCH BREAKER/PLUG FENCE (BSRF) O STREAM CROSSING COIR LOG COMPOST FILTER SOCK USFWS STREAM CROSSING WITH ENHANCED OCONTROLS (COMPOST FILTER SOCK TO BE USED X ORANGE SAFETY FENCE AT THE UPLAND/WATERBODY BOUNDARY ROADSIDE DITCH IN PLACE OF BSRF) CuB SOIL TYPE CONSTRUCTION ENTRANCE WITH DITCH CULVERT AS NEEDED ♦ GENERALIZED SURFACE WATER FLOW CULVERT/ACCESS ROAD WATERBARS =I> SURFACE WATER FLOW WITHIN ROW T(; TURBIDITY CURTAIN (PLAN VIEW) Q WATERBAR OUTLET (PLAN VIEW) WATERBAR (PLAN VIEW) � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) INLET/OUTLET PROTECTION THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: 1 " = 200' 200' 0 200' 400' NOTES: 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81' W. 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014. 3. IMAGERY TAKEN FROM GOOGLE EARTH. 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. 7. ALL STATIONING SHOWN IS SLOPE STATIONING. 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4 NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE UATE EXISTING O DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. `ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE. 12. THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. SCALE: AS SHOWN DATE: 11/17/17 DRAWN: GPT CHECKED: DLH1 APPROVED: NET gai consultants - NC, inc. 4198 COX ROAD SUITE 114 GLEN ALLEN, VA 23060 804-270-9357 N.C. COL #F-0269 PROJECT N0./DASH NO. 140468 TASK N0. TASK N0. 001, ISUB 00 GROUP ID DRAWING NO. D I E112 AR -112 N /L/��/1 1..1- V) 0 a O D_ N N W U U a U W N OffW / V) L W V) 0 Q O Of V) N W U Q D_ W N I n N W J_ LL - 0 U J r z W 2 z O D_ 0 z_ a o' D V) F_ D_ a I o_ D_ W N I D_ W V) Q ry I Q c� I U z 0 n LO I O LO O © 2017 GAI Consultants, Inc. ACCESS ROAD DETAIL 25 THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. LEGEND PROPERTY LINE - — — — — — — — - STORM SEWER X X FENCE E UNDERGROUND ELECTRIC STREAM W WATER LINE —G—G— EXISTING GAS PIPELINE SAN SANITARY SEWER OH OVERHEAD UTILITY LINES EDGE OF GRAVEL ACCESS ROAD PROPOSED GAS PIPELINE PROPOSED PERMANENT EASEMENT PROPOSED GAS PIPELINE (NO GROUND SURVEY) EXTRA WORK SPACE TOPSOIL SEGREGATION AREA AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. WETLAND UTILITY POLE (COLOR SHOWN TO PROVIDE CLARITY ONLY) BORE PIT NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE E&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). ACCESS ROAD DETAIL 26 THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: 1 " = 200' 200' 0 200' 400' NOTES: 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81' W. 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014. 3. IMAGERY TAKEN FROM GOOGLE EARTH. 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. 7. ALL STATIONING SHOWN IS SLOPE STATIONING. 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4 NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE UATE EXISTING O DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. `ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE. 12. THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. PERMANENT WATERBAR/SLOPE BREAKER LOD LIMIT OF DISTURBANCE Q TEMPORARY WATERBAR/SLOPE BREAKER BSRF BELTED SILT RETENTION Ep TRENCH BREAKER/PLUG � FENCE (BSRF) O STREAM CROSSING Z z COIR LOG U p C7 COMPOST FILTER SOCK W USFWS STREAM CROSSING WITH ENHANCED p � OCONTROLS (COMPOST FILTER SOCK TO BE USED X ORANGE SAFETY FENCE w AT THE UPLAND/WATERBODY BOUNDARY W ROADSIDE DITCH CL IN PLACE OF BSRF) cn o m z CuB SOIL TYPE V1 CONSTRUCTION ENTRANCE WITH DITCH ail Y MQ CULVERT AS NEEDED ♦ GENERALIZED SURFACE WATER FLOW CULVERT/ACCESS ROAD WATERBARS => SURFACE WATER FLOW WITHIN ROW T(; TURBIDITY CURTAIN (PLAN VIEW) WATERBAR OUTLET (PLAN VIEW) Q WATERBAR (PLAN VIEW) � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) INLET/OUTLET PROTECTION THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: 1 " = 200' 200' 0 200' 400' NOTES: 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81' W. 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014. 3. IMAGERY TAKEN FROM GOOGLE EARTH. 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. 7. ALL STATIONING SHOWN IS SLOPE STATIONING. 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4 NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE UATE EXISTING O DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. `ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE. 12. THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. n z n o ino_ a z rL w w � z 0 U Z z W U p C7 0 W p � U 0 z w z W CL cn o m z 0 V1 ail Y MQ w mH O d a 0 Y Q U n 11/17/17 n o CHECKED: a J cD N O Cj LZI..� z V / Z O U) LL I it �µ CAP _ le 02547 + 4C, 00 I� SCALE: AS SHOWN DATE: 11/17/17 J o CHECKED: a J cD N z 0 O Cj LZI..� LLI J a Z z zap J = J0Of LLl vs 0 ,rj � � 0 N z Q U o m (N — V UV) 000 Y MQ w mH O lu__j U N Q CD SCALE: AS SHOWN DATE: 11/17/17 DRAWN: GPT CHECKED: DLH1 APPROVED: NET gai consultants - NC, inc. 4198 COX ROAD SUITE 114 GLEN ALLEN, VA 23060 804-270-9357 N.C. COL #F-0269 PROJECT N0./DASH NO. 140468 TASK N0. TASK N0. 001, ISUB 00 GROUP ID DRAWING NO. D I E113 AR -113 N L/y�1 1..1- V) 0 Q O D_ N N W U U Q U W N OffW / V) L W V) 0 Q O Of V) N W U Q D_ W N I n N W J_ LL - 0 U J r z W 2 z O D_ 0 z_ Q o' D V) F_ D_ Q I o_ D_ W N I D_ W V) Q ry _ I Q c� I U z 0 n LO I O LO O © 2017 GAI Consultants, Inc. UTI II���:Z1l:111 DETAIL 27 SCALE: 1 " = 200' 200' 0 200' 400' THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. LEGEND PROPERTY LINE — — — — — — — — — STORM SEWER X X FENCE E UNDERGROUND ELECTRIC STREAM W WATER LINE —G—G— EXISTING GAS PIPELINE SAN SANITARY SEWER OH OVERHEAD UTILITY LINES EDGE OF GRAVEL ACCESS ROAD PROPOSED GAS PIPELINE PROPOSED PERMANENT EASEMENT PROPOSED GAS PIPELINE (NO GROUND SURVEY) EXTRA WORK SPACE TOPSOIL SEGREGATION AREA AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. WETLAND UTILITY POLE (COLOR SHOWN TO PROVIDE CLARITY ONLY) BORE PIT NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE E&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). ACCESS ROAD DETAIL 28 THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: 1 " = 300' 300' 0 300' 600' NOTES: 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81' W. 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014. 3. IMAGERY TAKEN FROM GOOGLE EARTH. 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. 7. ALL STATIONING SHOWN IS SLOPE STATIONING. 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4 NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE UATE EXISTING O DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. `ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE. 12. THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. PERMANENT WATERBAR/SLOPE BREAKER LOD LIMIT OF DISTURBANCE Q TEMPORARY WATERBAR/SLOPE BREAKER BSRF BELTED SILT RETENTION Ep TRENCH BREAKER/PLUG � FENCE (BSRF) O STREAM CROSSING Z z COIR LOG U p C7 COMPOST FILTER SOCK W USFWS STREAM CROSSING WITH ENHANCED p � OCONTROLS (COMPOST FILTER SOCK TO BE USED X ORANGE SAFETY FENCE w AT THE UPLAND/WATERBODY BOUNDARY W ROADSIDE DITCH CL IN PLACE OF BSRF) cn o m z CuB SOIL TYPE N_ CONSTRUCTION ENTRANCE WITH DITCH ail Y MQ CULVERT AS NEEDED ♦ GENERALIZED SURFACE WATER FLOW CULVERT/ACCESS ROAD WATERBARS => SURFACE WATER FLOW WITHIN ROW T(; TURBIDITY CURTAIN (PLAN VIEW) WATERBAR OUTLET (PLAN VIEW) Q WATERBAR (PLAN VIEW) � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) INLET/OUTLET PROTECTION THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: 1 " = 300' 300' 0 300' 600' NOTES: 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81' W. 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014. 3. IMAGERY TAKEN FROM GOOGLE EARTH. 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. 7. ALL STATIONING SHOWN IS SLOPE STATIONING. 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4 NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE UATE EXISTING O DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. `ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE. 12. THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. n z n o ino_ Q z rL w w � z 0 U Z z W U p C7 0 W p � U 0 z w z W CL cn o m z 0 N_ ail Y MQ w mH O d a 0 Y Q U n 11/17/17 n o CHECKED: Q J cD N O Cj Ld Z z V / Z O U) LL I it - le 02547 Ole) VI SCALE: AS SHOWN DATE: 11/17/17 J o CHECKED: Q J cD N z 0 O Cj Ld Z LLI J a Z z za J 0 = J0Of LLl vs 0 ,rj � � 0 N z Q U o m (N — V UV) 000 Y MQ w mH O lu__j U N Q CD SCALE: AS SHOWN DATE: 11/17/17 DRAWN: GPT CHECKED: DLH1 APPROVED: NET gai consultants - NC, inc. 4198 COX ROAD SUITE 114 GLEN ALLEN, VA 23060 804-270-9357 N.C. COL #F-0269 PROJECT N0./DASH NO. 140468 TASK N0. TASK N0. 001, ISUB 00 GROUP ID DRAWING NO. D I E014 AR -014 N /L/��f1 O N 0 Q O D_ V) V) W U U Q U W N OffW N L W N 0 Q O Of V) N W U Q D_ W N I n N W J_ LL - 0 U J r z W 2 z O D_ 0 z_ Q o' D V) F_ D_ Q I o_ D_ W N I D_ W V) Q ry I Q c� I U z 0 n LO I O LO O © 2017 GAI Consultants, Inc. ACCESS ROAD DETAIL 29 THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. LEGEND PROPERTY LINE — — — — — — — — — STORM SEWER X X FENCE E UNDERGROUND ELECTRIC STREAM W WATER LINE _G—G— EXISTING GAS PIPELINE SAN SANITARY SEWER OH OVERHEAD UTILITY LINES EDGE OF GRAVEL ACCESS ROAD PROPOSED GAS PIPELINE PROPOSED PERMANENT EASEMENT PROPOSED GAS PIPELINE (NO GROUND SURVEY) EXTRA WORK SPACE TOPSOIL SEGREGATION AREA AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. WETLAND UTILITY POLE (COLOR SHOWN TO PROVIDE CLARITY ONLY) BORE PIT NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE E&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). ACCESS ROAD DETAIL 30 THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: 1 " = 200' 200' 0 200' 400' NOTES: 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81' W. 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014. 3. IMAGERY TAKEN FROM GOOGLE EARTH. 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. 7. ALL STATIONING SHOWN IS SLOPE STATIONING. 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4 NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE UATE EXISTING O DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. `ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE. 12. THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. PERMANENT WATERBAR/SLOPE BREAKER LOD o LIMIT OF DISTURBANCE Q TEMPORARY WATERBAR/SLOPE BREAKER BSRF w BELTED SILT RETENTION Ep TRENCH BREAKER/PLUG 0 U FENCE (BSRF) O STREAM CROSSING p C7 COIR LOG W p COMPOST FILTER SOCK 0 USFWS STREAM CROSSING WITH ENHANCED w i> z OCONTROLS (COMPOST FILTER SOCK TO BE USED X ORANGE SAFETY FENCE o m AT THE UPLAND/WATERBODY BOUNDARY 0 ROADSIDE DITCH N_ IN PLACE OF BSRF) ail Y MQ w mH O CuB SOIL TYPE a CONSTRUCTION ENTRANCE WITH DITCH 0 CULVERT AS NEEDED ♦ GENERALIZED SURFACE WATER FLOW U CULVERT/ACCESS ROAD WATERBARS =I> SURFACE WATER FLOW WITHIN ROW T(; TURBIDITY CURTAIN (PLAN VIEW) Q WATERBAR OUTLET (PLAN VIEW) WATERBAR (PLAN VIEW) � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) INLET/OUTLET PROTECTION THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: 1 " = 200' 200' 0 200' 400' NOTES: 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81' W. 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014. 3. IMAGERY TAKEN FROM GOOGLE EARTH. 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. 7. ALL STATIONING SHOWN IS SLOPE STATIONING. 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4 NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE UATE EXISTING O DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. `ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE. 12. THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. n z n o ino_ Q z rL w w � z 0 U Z z W U p C7 Of 0 W p U 0 z w i> z W m CL cn o m z 0 N_ ail Y MQ w mH O d a 0 Y Q U n 11/17/17 n o CHECKED: Q J cD N O Cj Ld Z z V / Z O U) LL I it ,4,11....lfllf 111 �N CAR U25` 47 lJ � 11 T"VA,- � 'pl G�YI •' •� y� '! 4. Ro SCALE: AS SHOWN DATE: 11/17/17 J o CHECKED: Q J cD N z 0 O Cj Ld Z LLI Ja Z z za J 0 = J0 LLl vs Of 0 ,rj LLI ��� 0 O N i> z m Q U o m (N — V UV) 000 Y MQ w mH O IL_d_ U N Q CD SCALE: AS SHOWN DATE: 11/17/17 DRAWN: GPT CHECKED: DLF'I APPROVED: NET gai consultants - NC, inc. I 4198 COX ROAD SUITE 114 GLEN ALLEN, VA 23060 804-270-9357 N.C. COL #F-0269 PROJECT N0./DASH NO. 140468 TASK N0. TASK N0. 005 ISUB 00 GROUP ID DRAWING NO. D I E115 AR -115 N /L/��f1 O N 0 Q O D_ V) V) W U U Q U W N OffW N L W N 0 Q O Of V) N W U cQ NL L.1� W N I o_ Q / N W J_ LL- Q U J r z cW L z O D_ 0 z_ Q o' D V) F_ D_ Q I o_ D_ W N I D_ W V) Q ry I Q c� I U z 0 rn n LO I O LO O © 2017 GAI Consultants, Inc. n z n GPT ino_ Q z rL w w � z 0 U FENCE (BSRF) W U p C7 COIR LOG W p U z w W ' ' y ' ' ' ' �. J" ',. CL cn _ : reds : �t yJD 1�', ` �!y�it: d z • 0 ROADSIDE DITCH N_ IN PLACE OF BSRF) ail i d . . a CONSTRUCTION ENTRANCE WITH DITCH 0 Y ♦ GENERALIZED SURFACE WATER FLOW U n PERMANENT WATERBAR/SLOPE BREAKER n GPT LIMIT OF DISTURBANCE Q TEMPORARY WATERBAR/SLOPE BREAKER BSRF O Ep z V / Z O U) LL I it THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. LEGEND PROPERTY LINE - — — — — — — — - STORM SEWER X X FENCE E UNDERGROUND ELECTRIC STREAM W WATER LINE —G—G— EXISTING GAS PIPELINE SAN SANITARY SEWER OH OVERHEAD UTILITY LINES EDGE OF GRAVEL ACCESS ROAD PROPOSED GAS PIPELINE PROPOSED PERMANENT EASEMENT PROPOSED GAS PIPELINE (NO GROUND SURVEY) EXTRA WORK SPACE TOPSOIL SEGREGATION AREA AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. WETLAND UTILITY POLE (COLOR SHOWN TO PROVIDE CLARITY ONLY) BORE PIT NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE E&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). ACCESS ROAD DETAIL 32 PERMANENT WATERBAR/SLOPE BREAKER 774 GPT LIMIT OF DISTURBANCE Q TEMPORARY WATERBAR/SLOPE BREAKER BSRF BELTED SILT RETENTION Ep TRENCH BREAKER/PLUG FENCE (BSRF) O STREAM CROSSING \vo'///Jy%�'\ COIR LOG COMPOST FILTER SOCK USFWS STREAM CROSSING WITH ENHANCED OCONTROLS ' ' y ' ' ' ' �. J" ',. X _ :. ai d. _ : reds : �t yJD 1�', ` �!y�it: d AT THE UPLAND/WATERBODY BOUNDARY • ROADSIDE DITCH IN PLACE OF BSRF) i CuB . . CONSTRUCTION ENTRANCE WITH DITCH CULVERT AS NEEDED ♦ GENERALIZED SURFACE WATER FLOW • • m SURFACE WATER FLOW WITHIN ROW LL-24-101-AD07 TURBIDITY CURTAIN (PLAN VIEW) • ,. PARCEL I.D. # 933582168700 ;" ' - . + .. . LL -24-101-A008 w., � pit; r.a' a �,• .,i •• PARCEL LD. # 93359206630Q :� ;' �: •, � � _ //'000" rV t ' w � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. LEGEND PROPERTY LINE - — — — — — — — - STORM SEWER X X FENCE E UNDERGROUND ELECTRIC STREAM W WATER LINE —G—G— EXISTING GAS PIPELINE SAN SANITARY SEWER OH OVERHEAD UTILITY LINES EDGE OF GRAVEL ACCESS ROAD PROPOSED GAS PIPELINE PROPOSED PERMANENT EASEMENT PROPOSED GAS PIPELINE (NO GROUND SURVEY) EXTRA WORK SPACE TOPSOIL SEGREGATION AREA AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. WETLAND UTILITY POLE (COLOR SHOWN TO PROVIDE CLARITY ONLY) BORE PIT NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE E&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). ACCESS ROAD DETAIL 32 THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: 1 " = 200' 200' 0 200' 400' NOTES: 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81' W. 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014. 3. IMAGERY TAKEN FROM GOOGLE EARTH. 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. 7. ALL STATIONING SHOWN IS SLOPE STATIONING. 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4 NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE UATE EXISTING O DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. `ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE. 12. THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. SCALE: AS SHOWN DATE: PERMANENT WATERBAR/SLOPE BREAKER LOD GPT LIMIT OF DISTURBANCE Q TEMPORARY WATERBAR/SLOPE BREAKER BSRF BELTED SILT RETENTION Ep TRENCH BREAKER/PLUG FENCE (BSRF) O STREAM CROSSING COIR LOG COMPOST FILTER SOCK USFWS STREAM CROSSING WITH ENHANCED OCONTROLS (COMPOST FILTER SOCK TO BE USED X ORANGE SAFETY FENCE AT THE UPLAND/WATERBODY BOUNDARY ROADSIDE DITCH IN PLACE OF BSRF) CuB SOIL TYPE CONSTRUCTION ENTRANCE WITH DITCH CULVERT AS NEEDED ♦ GENERALIZED SURFACE WATER FLOW CULVERT/ACCESS ROAD WATERBARS SURFACE WATER FLOW WITHIN ROW T(; TURBIDITY CURTAIN (PLAN VIEW) Q WATERBAR OUTLET (PLAN VIEW) WATERBAR (PLAN VIEW) � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) INLET/OUTLET PROTECTION THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: 1 " = 200' 200' 0 200' 400' NOTES: 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81' W. 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014. 3. IMAGERY TAKEN FROM GOOGLE EARTH. 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. 7. ALL STATIONING SHOWN IS SLOPE STATIONING. 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4 NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE UATE EXISTING O DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. `ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE. 12. THE MAPPING SYMBOLOGY USED TO REPRESENT THE E&S CONTROLS IN THE PLAN VIEW ARE NOT TO SCALE SO THAT THEY ARE MORE VISIBLE ON THE DRAWINGS. E&S CONTROLS MAY BE SHOWN OUTSIDE OF THE LIMIT OF DISTURBANCE (LOD) FOR CLARITY ONLY. E&S CONTROLS SHALL BE PLACED WITHIN THE LOD. SCALE: AS SHOWN DATE: 11/17/17 DRAWN: GPT CHECKED: DLH1 APPROVED: NET gai consultants - NC, inc. 4198 COX ROAD SUITE 114 GLEN ALLEN, VA 23060 804-270-9357 N.C. COL #F-0269 PROJECT N0./DASH NO. 140468 TASK N0. TASK N0. 001, ISUB 00 GROUP ID DRAWING NO. D I E116 AR -116