COMMUNICATION TOWER (TYPICAL)
EROSION & SEDIMENT CONTROL PLAN
EROSION & SEDIMENT CONTROL PLAN NARRATIVE
THE FOLLOWING EROSION AND SEDIMENT CONTROL PLAN SHALL PROVIDE A TYPICAL
STANDARD FOR BEST MANAGEMENT PRACTICES FOR THE ATLANTIC COAST PIPELINE
COMMUNICATION TOWER SITES. THE COMMUNICATION TOWER SITE LAYOUT MAY NOT HAVE
ALL EQUIPMENT AND COMPONENTS DEPICTED, BUT THE SITE FOOTPRINT SHALL BE
CONSISTENT. COLLECTIVELY, THERE ARE 3 SITES IN WEST VIRGINIA, 19 SITES IN VIRGINIA, AND
10 SITES IN NORTH CAROLINA. THE EROSION AND SEDIMENT (E&S) CONTROL MEASURES FOR
THE COMMUNICATION TOWER CONSTRUCTION ACTIVITIES PRIMARILY CONSIST OF BUT ARE
NOT LIMITED TO ROCK CONSTRUCTION ENTRANCE, COMPOST FILTER SOCK, SILT FENCE, AND
TEMPORARY AND PERMANENT SEEDING AND MULCHING. BEST MANAGEMENT PRACTICES
(BMP) SPECIFICATIONS FOR THE E&S CONTROL PLAN (E&SCP) ARE TO BE UTILIZED BY THE
CONSTRUCTION CONTRACTOR ACCORDING TO THE PROVIDED PLAN.
GENERAL CONSTRUCTION NOTES:
1. DISCHARGES ORIGINATING FROM OFF-SITE SOURCES, WHICH FLOW THROUGH OR ACROSS
THE AREAS DISTURBED BY CONSTRUCTION, MAY BE DIVERTED AROUND THE ACTIVE
CONSTRUCTION AREA WHENEVER POSSIBLE.
2. PERFORM PERMANENT OR TEMPORARY SOIL STABILIZATION WITHIN 7 DAYS WHEN SITE IS
AT FINAL GRADE AND ON SITES THAT ARE NOT AT FINAL GRADE, BUT WILL REMAIN
DORMANT FOR MORE THAN 14 DAYS.
3. DUE TO VARYING SITE CONDITIONS, ADDITIONAL SEDIMENT CONTROL BMPS MAY BE
NECESSARY BEYOND THE MEASURES SHOWN ON THE E&S CONTROL PLAN.
4. AT MINIMUM, ALL BMPS ARE TO BE INSPECTED ONCE EVERY SEVEN CALENDAR DAYS AND
WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5 -INCH PER 24-HOUR
PERIOD DURING THE ENTIRE PROJECT. ALL REQUIRED PERMITS MUST BE OBTAINED PRIOR
TO STARTING WORK.
5. DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION,
STABILIZATION AND MAINTENANCE OF ALL EXISTING AND PROPOSED SITE EROSION &
SEDIMENTATION CONTROL DEVICES AND FACILITIES.
6. AS SITE SPECIFIC CONDITIONS MAY WARRANT, THE E&SC PLAN MAY REQUIRE MINOR
MODIFICATIONS TO ENSURE PROPER PROTECTION OF RECEIVING WATERS. THE
RESPECTIVE PROJECT ENVIRONMENTAL INSPECTOR (EI) WILL IDENTIFY SITE SPECIFIC
AREAS WHERE A CERTAIN BMP MODIFICATION(S) IS NECESSARY TO EITHER OMIT OR
ENHANCE BMPS IN SUCH AREAS. THIS PROCESS ENTAILS THE EI TO IDENTIFY LOCATIONS
WHERE BMPS WILL NEED TO BE ALTERED, SUBSTITUTED OR OMITTED AND CONTACT THE
DOMINION COMPLIANCE SPECIALIST TO REVIEW PROPOSED CHANGES. UPON REVIEW
AND APPROVAL BY THE DOMINION COMPLIANCE SPECIALIST, THE EI WILL REDLINE, DATE,
AND SIGN THE E&SCP DRAWING(S) DEPICTING THE REDLINE CHANGE(S). ONCE THIS
PROCESS IS COMPLETED, THE EI WILL NOTIFY THE DEP OF SUCH MINOR MODIFICATION
REDLINE AMENDMENTS AS REQUIRED BY THE GENERAL PERMIT.
BMP INSTALLATION AND REMOVAL SEQUENCE
THE STAGING OF EARTHMOVING ACTIVITIES FOR THIS PROJECT IS A GENERAL DESCRIPTION OF
THE WORK REQUIRED. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH COMPANY
STANDARDS, THE STATE DEPARTMENT OF ENVIRONMENTAL QUALITY REGULATIONS AND ALL
OTHER APPLICABLE FEDERAL, STATE OR LOCAL REQUIREMENTS.
THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN INCLUDING THE SOIL EROSION
CONTROL DRAWINGS AND NARRATIVE SHALL BE AVAILABLE ON SITE AT ALL TIMES DURING
EARTH DISTURBANCE.
1. STAKE/FLAG ALL LIMITS OF DISTURBANCE FOR CONSTRUCTION ACTIVITIES, CLEARLY
IDENTIFYING WETLAND AND STREAM EDGES. INSTALL SIGNS TO DESIGNATE THE AREA TO
IDENTIFY IMPORTANT PROJECT ATTRIBUTES SUCH AS WETLAND/STREAM BOUNDS,
EXCLUSION AREAS ETC.
2. INSTALL ROCK CONSTRUCTION ENTRANCES IMMEDIATELY BEFORE INITIAL DISTURBANCES.
THE ROCK CONSTRUCTION ENTRANCES TO BE UNDERLAIN BY FILTER FABRIC. ALL
CONSTRUCTION TRAFFIC SHOULD USE ONLY ROCK CONSTRUCTION ENTRANCE FOR
INGRESS AND EGRESS. ALL MUD OR SEDIMENT TRACKED ONTO THE EXISTING ROADWAY
SHALL BE REMOVED BY THE CONTRACTOR AS NECESSARY.
3. INSTALL SILT FENCE AND COMPOST FILTER SOCKS AS NECESSARY ALONG THE ACCESS
ROADS TO PREVENT SEDIMENT LADEN RUNOFF FROM ENTERING DOWNSTREAM WATER
BODIES. MAINTAIN THE ACCESS ROADS AS REQUIRED, ASSOCIATED DITCHES, AND
NECESSARY OUTLET PROTECTION.
4. PRIOR TO AND SIMULTANEOUS WITH GRADING AND EXCAVATION, INSTALL REMAINING
EROSION CONTROL DEVICES (ECD) SHOWN ON THE PLANS.
5. COMMENCE GRADING AND ASSOCIATED CUT AND FILL SLOPES. THE EARTH MOVING
ACTIVITY SHALL BEGIN IN AREA OF CUT SO THAT THE CUTS CAN BE PLACED IN AREAS OF
FILL.
GENERAL NOTES AND COMMENTS:
ERM HAS DEPICTED EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMPS) ON THESE PLAN SHEETS
PREPARED BY OTHERS FOR USE BY CONTRACTOR TO CONTROL EROSION AND SEDIMENTATION DURING CONSTRUCTION OF
THIS PROJECT. ERM IS RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED
AND SEALED BASED ON THE SOURCE DATA PROVIDED. ERM RETAINS NO RESPONSIBILITY OR LIABILITY FOR INFORMATION
DEVELOPED, PREPARED OR OTHERWISE PROVIDED BY OTHERS, OR FOR INACCURACIES OF SOURCE DATA PROVIDED BY
OTHERS. ERM ASSUMES NO RESPONSIBILITY OR LIABILITY FOR DESIGNS OR WORK PRODUCTS OF ANY TYPE TO THE
EXTENT THAT THEY ARE BASED UPON OR DERIVED FROM SUCH INCORRECT INFORMATION OR DATA.
6. FINALIZE UTILITY INSTALLATION AND PLACE TOPSOIL ON THE CUT AND FILL AREAS.
STABILIZE CUT AND FILL SLOPES, AFTER PLACEMENT OF STOCKPILED TOPSOIL ON
EXCAVATED SLOPES, AND AS DIRECTED.
7. RE -DISTRIBUTION OF WET SEDIMENT FROM DEVICES AND FACILITIES SHALL ONLY BE
PERMITTED UPHILL OF AN EFFECTIVE SEDIMENT CONTROL DEVICE OR FACILITY.
SEDIMENT LADEN RUNOFF SHALL NOT BE ALLOWED TO FLOW DIRECTLY INTO WATER
BODIES.
8. ANY EXPOSED TOPSOIL PILES SHOULD BE STABILIZED & SEEDED PER THE PERMIT
REGULATIONS, AND BY TABLES SHOWN ON THE APPROVED EROSION CONTROL PLANS
AND MULCHED WITH STRAW AS SPECIFIED BY THE PROJECT OWNER.
9. UPON MINIMUM 70% VEGETATIVE STABILIZATION, REMOVE TEMPORARY SEDIMENT
CONTROLS. REMOVE ACCUMULATED SEDIMENTS WITHIN THE TRAPS, RE -GRADE TRAPS
TO FINAL CONTOURS. STABILIZE SITE PER THE PLANS.
TOWER SITES - SEQUENCE OF CONSTRUCTION
1. LIMITS OF CONSTRUCTION MUST BE FIELD MARKED PRIOR TO CLEARING, INSTALLATION
OF SEDIMENT CONTROL MEASURES, CONSTRUCTION, OR OTHER LAND DISTURBING
ACTIVITIES.
2. DETAILED SEQUENCE OF CONSTRUCTION:
a. INSTALL STABILIZED CONSTRUCTION ENTRANCE.
b. CLEAR AND GRADE FOR INSTALLATION OF ECDS.
c. INSTALL SEDIMENT CONTROL DEVICES.
d. PREPARE TEMPORARY PARKING AND STORAGE AREA(S).
e. CLEAR AND GRUB THE SITE, AS REQUIRED.
f. START CONSTRUCTION OF THE SITE IMPROVEMENTS.
g. BEGIN GRADING THE SITE.
h. INSTALL UTILITIES.
i. PERFORM FINAL GRADING AND INSTALL PERMANENT SEEDING AND PLANTING.
j. REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES (ONLY IF SITE
IS STABILIZED).
MAINTENANCE SCHEDULE
AFTER FULL REVEGETATION HAS BEEN ACHIEVED, ALL BMPS WILL BE REMOVED AND ANY
LAND DISTURBED BY REMOVAL WILL BE PERMANENTLY STABILIZED. UNLESS OTHERWISE
SPECIFIED, ALL MAINTENANCE MUST BE COMPLETED IMMEDIATELY AFTER AN INSPECTION
IDENTIFIES THAT A BMP IS NOT FUNCTIONING AS REQUIRED.
• SEDIMENT MUST BE REMOVED WHERE ACCUMULATION REACHES ONE-HALF THE ABOVE
GROUND HEIGHT OF THE CONTROL MEASURE.
• EROSION CONTROL MEASURES, WHICH HAVE BEEN UNDERMINED OR TOPPED, MUST
IMMEDIATELY BE REPAIRED.
• OTHER REQUIRED REPAIRS OR MAINTENANCE SHALL BE MADE IMMEDIATELY.
• TEMPORARY AND PERMANENT E&S CONTROL BMPS SHALL BE MAINTAINED AND REPAIRED
AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION.
SEEDING AND MULCHING
SEE SEED MIXES SPECIFIED IN THE ACP PROJECT RESTORATION PLAN.
SEEDBED PREPARATION: AREAS TO BE SEEDED SHALL BE DISKED TO A DEPTH OF 4 -IN TO 6 -IN
WHENEVER FEASIBLE, AND SMOOTHLY GRADED.
3. IN TOPSOILED AREAS, SOIL TO BE REDISTRIBUTED EVENLY AND STABILIZED PRIOR TO
SEEDING.
4. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF
THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY
CEASED, BUT IN NO CASE MORE THAN 21 DAYS AFTER THE CONSTRUCTION ACTIVITY IN
THAT PORTION OF THE SITE HAS PERMANENTLY CEASED.
5. WHERE THE INITIATION OF STABILIZATION MEASURES WITHIN 7 DAYS AFTER
CONSTRUCTION ACTIVITY TEMPORARILY OR PERMANENTLY CEASES IS PRECLUDED BY
SNOW COVER, STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS CONDITIONS
ALLOW.
6. AREAS WHERE THE SEED HAS FAILED TO GERMINATE ADEQUATELY (UNIFORM PERENNIAL
VEGETATIVE COVER WITH A DENSITY OF 70%) WITHIN 30 DAYS, SEEDING AND MULCHING
MUST BE RE -SEEDED IMMEDIATELY, OR AS SOON AS WEATHER CONDITIONS ALLOW.
SYM.I DATE I BY
03/07/17 i WTS
REVISION INFORMATION
ISSUED FOR REVIEW
LEGEND
Station Fence
Pow
LIMITS OF
CONSTRUCTION
LIMITS OF
DISTURBANCE
PROPOSED
FEATURE
PROPOSED
FENCE
PROPOSED
COMPOST FILTER
SOCK OR
SILT FENCE
ROCK CONSTRUCTION
ENTRANCE
(OR APPROVED ALT.)
FLOW ARROW (PROPOSED)
PROJECT/TASK I APP
�oII(SLIAII io1
-�\A GARo
LP Tank
3'
\J/ J I V V
Schedule 80
75/
Fencing: 8' anti -climb, anti -cut fence with 1' of outward facing barbwire and
fence sensing technology providing delay, deterrence and detection against
intrusion
Security Fence
AUG Ground
system
Pull BoxsystemIII �
24" ICE I I
III
Bridge I I
III
III
TelecoM Cable GND Tie
to ❑f rice Bldg i i Box
PRELIMINARY
100' MIN. PUBLIC STREET
6" MIN. THICKNESS) L -FILTER FABRIC UNDER STONE
EXISTING GROUND ZL
-100' MIN.
O O o
O p° D
18' MIN. D ° 0 ° PUBLIC STREET
O ° g ° D 7
0
GENERAL NOTES,
1. A STABILIZED PAD OF WASHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL BE ENTERING OR LEAVING A
CONSTRUCTION SITE TO OR FROM A PUBLIC STREET.
2. STONE TO BE SURGE STONE OR 2"-3" RAILROAD BALLAST
3. THE ENTRANCE SHALL BE MANTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT
ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL
STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
4. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY.
5. WHEN NECESSARY, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHE
WASHING IS REQUIRED IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO A
APPROVED SEDIMENT §ASIN.
6. FILTER FABRIC SHALL BE MIRAFI 500 OR EQUIVALENT.
ROCK CONSTRUCTION ENTRANCE
(N. C. STD. NO. 6.06)
1
CHECKED:
7,•', V fr I K^ APP. FOR BID:
0 '•. ,O]Ns� ' ."
i C] •r� APP. FOR CONST.:
SCALE:
ERM NC, INC.
License #F-1223
15720 Brixham Hill Ave, Suite 120
ERM Charlotte, NC 28277 (704) 541-8345
WTS 1 05/18/17
SITE PLAN
5/
EIIIIIA 111 = 10'
WHEN PRINTED FULL SIZE
l 0 5 10
liiiiliiii
BELTED SILT RETENTION FENCE
INSTALLATION DETAIL
PRIORITY I-GREF-N 11ANI7
A -AN EM -00 AN -W SILT-SAVER,INr-
BONDING
STRIP
(1^w 3/8"x 24")
5STAPLES
10' (TV) (I"x I'/.')
FABRIC TO BE 24" ABOVE
GROUND WITH '1 IN TRENCH
OR SLICING METHOD
4 111 •
N FLOW -
- I 1
- - - r POST (OAK)
—I I— , - \ J _ I (1-3/4'x 1-1/4"x 46^)
TGEINANDCOMPACT
G q•'x g•' BACKFILLORSLICTNG
SIDE VIEW Trench METHOD
i
�4' LONG WOOD POST (OAK)
SPACED AT 4'-0"
GREEN BAND
FRONT ELEVATION
SS -1 MINIMUM OVERLAP OF 16" IS TO
BE PROVIDED AT ALL SPLICE
JOINTS
BELTED SILT RETENTION FENCE (BSRF)
IF BRSF DOES NOT PERFORM TO
SPECIFICATION, THEN STANDARD SILT FENCE
TO BE USED.
SILT -SAVER, INC.
1094 CULPEPPER DRIVE ` CONYERS, GA 313094 •
OFFICE 770-388-7818 • FAx 770-3BB-7640 , TOLL FREE 1 -888 -382 -SILT (7458) • WEBSITE WWW.SILTSAVER.°°M
Atlantic Coast Pipeline, LLC
925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000
- TITLE: ATLANTIC COAST PIPELINE
COMMUNICATION TOWER ESC PLAN - TYPICAL
DISTRICT.
GROUP DWG. NO. REV.
AS NOTED DIRiFILE: ACP\COMMUNICATION TOWER — 1 — 1 O
4• MAX. O.C.
0
I
36" FABRIC BSRF
TRENCH
�4' LONG WOOD POST (OAK)
SPACED AT 4'-0"
GREEN BAND
FRONT ELEVATION
SS -1 MINIMUM OVERLAP OF 16" IS TO
BE PROVIDED AT ALL SPLICE
JOINTS
BELTED SILT RETENTION FENCE (BSRF)
IF BRSF DOES NOT PERFORM TO
SPECIFICATION, THEN STANDARD SILT FENCE
TO BE USED.
SILT -SAVER, INC.
1094 CULPEPPER DRIVE ` CONYERS, GA 313094 •
OFFICE 770-388-7818 • FAx 770-3BB-7640 , TOLL FREE 1 -888 -382 -SILT (7458) • WEBSITE WWW.SILTSAVER.°°M
Atlantic Coast Pipeline, LLC
925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000
- TITLE: ATLANTIC COAST PIPELINE
COMMUNICATION TOWER ESC PLAN - TYPICAL
DISTRICT.
GROUP DWG. NO. REV.
AS NOTED DIRiFILE: ACP\COMMUNICATION TOWER — 1 — 1 O