Loading...
HomeMy WebLinkAbout20140957 Ver 2_ACP_ESC_NC_Overview_20171208Federal Ownership National Park Service USDA Forest Service U.S. Fish & Wildlife Service Dept. of Defense/Military U.S. Army Corps of Engineers Other Federal Land cg ah National: FOR. I AhlsvMll� LIE R1013E MOUNTAINS N "ah afa htalional Fomw i w I All III S " I l'�, IM *� Northampton y • -, • Q Compressor r1 11"-17- .0 Station •�, }�,�L7} , �L r�n117{1f 9 n 021 In •�, Ihll O +� Raleigh 50 P. N OR T�f 4 CAROLINA •" �� 100 Smithfield * M&R I1,1FI+tIe Fayetteville Raleigh/Fayetteville M&R,@E NU' -Regional Office • -.• I`i Boundary • ,• 150 l�rkon''illa Pembroke M&R i lI'd ngton a 0 50 100 Miles Construction Spread Break 0 Compressor Station Atlantic Pipeline Construction Year 0 Proposed M&R Site Coast 2018 O Contractor Yard Pipeline , 2019 Telecommunication Tower • Regional Office Boundary +irginia rleach JI Atlantic Coast Pipeline Proposed Route within the State of North Carolina Figure 1 ERM FILE: M:\Cli-ts\D-F\DOM\SRPP\ A.GIS\2017\08\08 ESC NC Overview\ ACP–ESC–NC-0—ie-..d, REVISED: 08/15/2017, SCALE: 1:3,500,000 DRAWN BY: GIS