Loading...
HomeMy WebLinkAboutNC0001899_Lagoon Closure Pond Clousure Plan_20171208_ Our Peopte Your Success 115 MacKenan Drive Cary, North Carohna 27511 t 919 469 3340 1 f 919 467 6008 TO NC Division of Water Resources Non -Discharge Permitting Unit 1617 Main Service Center Raleigh, NC 27699-1617 WE ARE SENDING YOU ® Attached ❑ Shop Drawings ❑ Prints ❑ Copy of Letter ❑ Change order LeUer of Trans mbd, tta:L °r r- 12/4/2017 1 '9399 02150132.00 nf_2 &—A M Nathaniel Thornburg 01,-- WWTP Closure Plan Former Performance Fibers Facility Moncure, Chatham County NC NOn-L,'IIsc NPDES NC0001899 ❑ Under separate cover via ❑ Plans ❑ Samples ❑ Diskette ❑ the following items: ❑ Specifications COO plt�5 DD _ 1K7a 1 12/4/2017 02150132 00 WWTP Closure Plan THESE ARE TRANSMITTED as checked below - 0 For approval ❑ Approved as submitted ❑ Resubmit ❑ For your use ❑ Approved as noted ❑ Submit ❑ As requested ❑ Returned for corrections ❑ Return ❑ For review and comment ❑ ❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US copies for approval copies for distribution corrected prints REMARKS: Please call at (919) 271-0368 if you have questions, Martin COPYTO• File SIGNED: Martin Richmond If enclosures are not as noted, kindly notify us at once 201/ IaIC�e Unit WASTEWATER TREATMENT PLANT POND AND LAGOON CLOSURE PLAN FORMER PERFORMANCE FIBERS FACILITY MONCURE, CHATHAM COUNTY, NC NPDES PERMIT NC0001899 DECEMBER 1, 2017 RECEIVED/NMEQIDWR DEC 8 2017 1. INTRODUCTION Non -Discharge This WWTP Pond and Lagoon Closure Plan has been prepared by WithersRavenel, Inc. of Ca ,'fit fo71the former Performance Fibers facility in Moncure NC, in accordance with guidelines specified by the NC Division of Water Resources Guidelines for the Closure of Permitted Wastewater Ponds and Lagoons, June 12, 2012. This plan has been prepared for the purpose of obtaining approval from the NC DWR to proceed with WWTP Closure operations at the subject facility. The WWTP is located on a property that has been granted a Brownfields Property Agreement (the "Agreement") by the North Carolina Department of Environmental Quality (DEQ) Division of Waste Management. The Agreement is referenced as Performance Fibers with identification number #19047- 015-019. The corresponding Notice of Brownfields Property was filed on September 12, 2017 at the Chatham County Register of Deeds office. The NBP is recorded under Book 1946 and Page 96-162 and the associated plat is filed under Book 2017 and Page 300-302. Phase II Environmental Site Assessment (ESA) activities completed prior to the current owners purchase of the property and subsequent to the closure of the manufacturing operations on the property by the prior owner identified areas of subsurface contamination including soil, groundwater and soil vapor impacts on the property. Impacted sediment was also identified in the floor of a number of the wastewater treatment system impoundments. Stormwater sampling conducted at outfalls covered under a prior NPDES General Permit for industrial stormwater discharges and wastewater sampling associated with this permit, however, has not identified impacts to discharges at the permitted outfalls. It is the intent of this Plan to outline proposed steps to dewater, remove contaminated sediment or sludge from the floor of each impoundment named in the WWTP permit, complete post sediment or sludge removal sampling of the final subgrade and to decommission each impoundment by a combination of breaching the dikes or filling the impoundments to allow normal sheet flow of stormwater which contacts the closed impoundment areas. The Plan does not include any proposed remedial measures beyond the stated closure objectives of contaminated soil or groundwater beneath any impoundment or feature of the WWTP as such contamination is part of the overall site conditions considered by NCDEQ as part of the issuance of the Brownfields Property Agreement. WWTP Closure Plan Former Performance Fibers Facility Chatham County, NC December 1, 2017 1 1 SITE LOCATION AND DESCRIPTION The facility is located at 338 Pea Ridge Road in New Hill, Chatham County, NC. The total acreage of the facility property is approximately 421.65 acres. The property and WWTP is currently owned by Moncure Holdings West, LLC, 282 Century Place, Louisville, CO. The permitee for this facility is Moncure Holdings Utilities, LLC, Louisville, CO. The facility is located in the Cape Fear River Basin, and drains to Shaddock Creek (Stream Index# 16-43; Surface Water Classification WS -IV). A location map for this facility is included in Figure 1 of this report. 12. SITE HISTORY Construction activities for the former polyester fiber manufacturing plant which occupied the site was completed in the late 1960s. The manufacturing plant opened in 1971. The plant manufactured industrial strength polyester fiber from polyethene terephthalate or PET. The former manufacturing process involved the polymerization of terephthalate and ethylene glycol with an antimony catalyst. The onsite WWTP handled the industrial process water and domestic wastewater associated with both the manufacturing process and support of the workforce at the plant Manufacturing operations were discontinued in 2014 and demolition of the plant was initiated by the former owner between 2014 and the end of 2016. Currently no manufacturing or chemical process operations remain at the site. 1.3. PERMITTING In addition to the NPDES wastewater permit, the facility has operated in the past under DEQ permits issued through Division of Air Quality, Division of Waste Management, Division of Water Resources Public Water Supply, and Division of Energy. Mining and Land Quality (NPDES Industrial Stormwater). All previous permits have been rescinded, and the only remaining active permit at the facility is the subject NPDES Wastewater permit. 2. CLOSURE OF PERMITTED PONDS AND LAGOONS NPDES Permit NC0001899 allowed for the discharge of 0.244 MGD of combined treated process and domestic wastewater, and treated V'JTP backwash wastewater to Outfall 001, from a wastewater treatment system that includes the following components: / Sanitary bar screen, grinder, and lift statin; / Process wastewater lift station; / One (1) 1,200 -gallon mixing/neutralization chamber with automatic pH control; / One (1) 650,000 -gallon aeration basin with mechanical aerators; / Coagulant addition system; / One (1) 18,500 -gallon clarifier; / One (1) 1,000-ft2 sludge drying bed; / Chlorine contact chamber (no chlorination); / Conventional water treatment plant with chemical addition systems; / One (1) 20,0000 -gallon clarifier; / Two (2) alum settling ponds, One (1) 300,000 -gallons and One (1) 500,000 -gallons; PAGE 2 WWTP Closure Plan Former Performance Fibers Facility Chatham County, NC December 1, 2017 ► One (1) 1,000,000 -gallon polishing pond; / Effluent composite sampler; and / Effluent meter. Additionally, the permit allows for discharge of stormwater, condensate, and overflow from two 1,200K Gal fire ponds to Outfall 002. A facility layout site map is included in Figure 2 of this report. A process schematic diagram of the WWTP operation is included in Figure 3 of this report. 2 1. COMPONENTS FOR CLOSURE It is the intent of Moncure Holdings West, LLC to close the WWTP in entirety, and remove the mechanical and structural components of the WWTP, including piping, lift stations, drainage inlets, etc. In most cases, mechanical devices (pumps, etc.) will be removed, the inlets and outfalls plugged permanently with concrete, and smaller concrete lined wet wells backfilled with clean fill material. This plan details closure specifically of the following components: / One (1) 1,200 -gallon mixing/neutralization chamber with automatic pH control; / One (1) 650,000 -gallon aeration basin with mechanical aerators; ► One (1) 650,000- gallon spill collection basin* ► One (1) 18,500 -gallon clarifier; / One (1) 1,000-ft2 sludge drying bed; / One (1) 20,0000 -gallon clarifier; / Two (2) alum settling ponds, One (1) 300,000 -gallons and One (1) 500,000 -gallons; ► One (1) 1,000,000 -gallon polishing pond; *Note: the 650K gal Spill Collection Basin is not included in the NPDES Permitted components, but is addressed in this closure plan The following components listed in the permit are not specifically addressed in this plan: ► Sanitary bar screen, grinder, and lift station; ► Process wastewater lift station; / Coagulant addition system; / Chlorine contact chamber (no chlorination); / Conventional water treatment plant with chemical addition systems; / Effluent composite sampler; and / Effluent meter. 2.2 PRE -CLOSURE ACTIVITIES 2.21 Influent Disconnection Currently, the WWTP is receiving influent from the following sources: • Wastewater lift stations, which accommodate restroom facilities remaining in operation, for the two part-time employees who work at the facility; PAGE 3 WWTP Closure Plan Former Performance Fibers Facility Chatham County, NC December 1, 2017 • Stormwater which enters the lift stations through certain yard inlets and floor drains of demolished buildings; and • Stormwater which is collected in the stormwater retention channel, directed to the stormwater retention pond, and is then routed to the Spill Collection Basin. Influent from the lift station will be discontinued by disassembling the pumping system, physically breaking the influent and outflow piping, sealing the pipe ends with concrete, and filling the subgrade structures with clean fill material. Influent from the facility drainage system which once was collected by the stormwater retention channel and pond will be discontinued by extending the outfalls at the ditch to the existing fire ponds. Influent from the stormwater retention channel, the stormwater retention pond, and Spill Collection Basin is discussed below. 2 2 2 Stormwater Retention Channel, Stormwater Retention Pond, and Spill Collection Basin The Stormwater Retention Channel and Stormwater Retention Pond were constructed to allow containment should a spill of process water or chemical occur at the facility. The outfall of the pond is designed to discharge to Outfall #002. Such stormwater discharge to Outfall #002 has been discontinued since a surface spill of industrial process water at the facility in 2014. Since that time stormwater has been pumped from the stormwater retention pond to the Spill Collection Basin of the WWTP. As neither the retention channel or pond is needed for this potential spill containment function this plan proposes to dewater each structure with effluent pumped to the WWTP and fill each structure with clean earth fill to eliminate stormwater discharges that would contact the existing floor or sidewalls of the structure to Outfall #002. This will eliminate a major source of influent to the WWTP in the stormwater which enters the ditch or pond. Note: The Stormwater Retention Channel and Stormwater Retention Pond have been previously sampled for VOCs, SOCs, and Metals in accordance with Brownfield requirements. Results of analysis are presented in the Appendix of this report. Closure details for the Spill Collection Basin are included in Section 3.8 of this report. 3. COMPONENT CLOSURE DETAILS This section contains closure operation details for each wastewater pond/lagoon included in the wastewater treatment system, as identified in Section 2.1 of this report. 3 1 1,200 GAL MIXING/NEUTRALIZATION CHAMBER The 1.2K gallon Mixing/Neutralization chamber is a concrete -constructed component which receives influent wastewater from the lift stations and the Spill Control Basin. Water from this component will be drained to the aeration basin. The chamber will be dismantled, and subsurface grade will be filled with clean backfill material. This chamber is constructed of concrete, and does not intercept the water table. As such, no sampling is proposed beneath this chamber. PAGE 4 WWTP Closure Plan Former Performance Fibers Facility Chatham County, NC December 1, 2017 3 2 65OK GAL AERATION BASIN This component is an unlined basin which provides secondary treatment for the WWTP. The basin is an estimated 5 feet below grade with a compacted clay liner, and does not intercept the water table. The wastewater in this basin will be processed as normal through the clarifier, and discharged under the current permit through Outfall 001. Once the influent is disconnected and the basin de -watered, the sludge remaining in this basin will be sampled per sampling protocol outlined in Section 4.0 of this report. Note: This sludge has been previously sampled for VOCs, SOCs, and Metals in accordance with Brownfield requirements. Results of analysis are presented in the Appendix of this report. The sludge will be removed and disposed of off-site per Item D of the DWR lagoon closure checklist. Final disposal of the sludge will be at a permitted Subtitle D landfill. The berms of the basin will be breached, and the basin partially filled with clean backfill. Final grade is presented in the Lagoon Breaching Plan included in Figure 5 of this report. Estimated amount of sludge for disposal: ±579 ft' 3 3 18 5K GAL CLARIFIER The 18.5K Gal Clarifier is a concrete -constructed component which receives treated wastewater from the aeration basin. Water from this clarifier will be discharged in accordance with the permit through Outfall 001. Remaining sludge in the clarifier will be wasted to the Sludge Drying Bed for disposal (see Section 3.4 below), and the clarifier will be dismantled. The subsurface pit will be filled with clean backfill and graded to natural grade. This clarifier is constructed of concrete, and does not intercept the water table. As such, no sampling is proposed beneath this component. 3 4 1K SQFT SLUDGE DRYING BED The sludge drying bed is a basin, with a compacted gravel bottom allowing drainage to be collected and returned to the aeration basin. Influent to the bed is from sludge wasting from the 18.5K gal clarifier. The sludge in the drying bed will be sampled and analyzed per sampling protocol outlined in Section 4.0 of this report. The sludge will be removed and disposed of off-site at a permitted Subtitle D landfill. Following sludge removal and disposal, this component will be disassembled, and samples collected from natural material beneath the bed per sampling protocol outlined in Section 4.0 of this report. Estimated amount of sludge for disposal: ±1,000 ft3 3.5 20K GAL CLARIFIER The 20K Gal Clarifier is a metal -constructed above -grade component which receives treated water from the Water Treatment Plant. Water and sludge from this clarifier will be drained to the alum ponds. The PAGE 5 WWTP Closure Plan Former Performance Fibers Facility Chatham County, NC December 1, 2017 clarifier will be dismantled, remaining sludge in the clarifier will be transferred to the alum ponds for final disposal (see Section 3 6) This component is a standup metal structure, entirely above grade, and mounted on a concrete pad. As such, no sampling is proposed beneath this component. 3 6 TWO ALUM SETTLING PONDS 300K GAL AND 500K GAL The alum ponds are concrete -constructed basins, with compacted gravel bottoms allowing drainage to be routed to the polishing pond. Influent to these ponds is sludge wasting from the 20K gal clarifier used with the WTP. The alum sludge in these ponds will be sampled and analyzed per sampling protocol outlined in Section 4.0 of this report. Disposal of the sludge will be to an offsite permitted Subtitle D landfill. Following alum sludge removal and disposal, these components will be disassembled, and samples collected from natural material beneath the bed per sampling protocol outlined in Section 4.0 of this report. The berms of these ponds will be breached, and the basins partially filled with clean backfill. Final grade is presented in the Lagoon Breaching Plan included in Figure 5 of this report. Estimated volume of sludge for disposal (total from both ponds): 2,255.7 ft3 3 7 1,000K GALLON POLISHING POND This pond is an unlined basin which provides secondary and tertiary treatment. The basin is an estimated 5 feet below grade, and does not intercept the water table. Influent to this basin is comprised of decant water from the alum ponds and effluent from the 18.5K gal clarifier. The wastewater in this basin will be discharged under the current permit through Outfall 001. Once the influent is disconnected and the basin de -watered, the sludge remaining in this pond will be sampled per sampling protocol outlined in Section 4.0 of this report. Note This sludge has been previously sampled for VOCs, SOCs, and Metals in accordance with Brownfield requirements. Results of analysis are presented in the Appendix of this report. The berms of these ponds will be breached, and the basins partially filled with clean backfill. Final grade is presented in the Lagoon Breaching Plan included in Figure 5 of this report. Estimated amount of sludge for disposal: ±1,552 ft3 3 8 650K GAL SPILL COLLECTION BASIN (INFLUENT SOURCE Note- This basin is not Included in the NPDES Permitted components. This holding pond is an unlined basin which provides equalization of influent collected from the Stormwater Retention Pond, with outlet to the Mixing/Neutralization chamber for routing into the aeration basin The basin is an estimated 5 feet deep, and does not intercept the water table. PAGE 6 WWTP Closure Plan Former Performance Fibers Facility Chatham County, NC December 1, 2017 The wastewater in this basin will be processed as normal through the aeration basin, and discharged under the current permit. Once the influent is disconnected via filling of the Stormwater Retention Channel and Stormwater Retention Pond and the basin de -watered, the sludge remaining in this basin will be sampled per sampling protocol outlined in Section 4.0 of this report. Note: This sludge has been previously sampled for VOCs, SOCs, and Metals in accordance with Brownfield requirements. Results of analysis are presented in the Appendix of this report. The sludge will be removed and disposed of off-site per Item D of checklist. Final disposal of the sludge will be at a permitted Subtitle D landfill. The berms of the basin will be breached, and the basin partially filled with clean backfill. Final grade is presented in the Lagoon Breaching Plan included in Figure 5 of this report. Estimated amount of sludge for disposal: ±330.7 ft3 4. SAMPLING PROTOCOL All sludge and soil samples will be collected through composite sampling technique, and analyzed through a DWR-certified laboratory. Please note: extensive sampling and analysis has been conducted prior to this closure plan as part of the Brownfields Recordation process. This information is included in the Appendix to this report. Sludge samples will be collected post -dewatering activity from the Aeration Basin, the Spill Collection Basin, the Alum Sludge Beds the Polishing Pond, and the Sludge Drying Bed. Sediment samples will be collected from native materials underlying these components at depths from 1 to 3 feet. Analytical parameters include Pathogen and Vector Attraction Reduction, residual Metals, nutrients, total solids and pH. Other parameters required for disposal will be analyzed per disposal facility requirements (Le TCLP, Corrosivity, etc.). The proposed sampling locations, number of samples, and required analysis are presented in Figure 5 of this report. 5. CLOSURE SCHEDULE 5.1. STORMWATER RETENTION CHANNEL AND STORMWATER RETENTION POND The Stormwater Retention Channel and Stormwater Retention Pond will dewatered and filled initially, disconnecting influent to the Spill Collection Basin. Lift stations will be disconnected and closed. Stormwater drainage lines will be filled, disconnecting influent from the aeration basin. The 20K gallon WTP clarifier will be drained, wasted, and disconnected from the alum settling ponds. At this stage, there will be no more influent into the WWTP. PAGE 7 WWTP Closure Plan Former Performance Fibers Facility Chatham County, NC December 1, 2017 5.2 ALUM PONDS The alum ponds will be dewatered to the polishing ponds, and alum pond closure initiated. 5 3 POLISHING POND The Polishing Pond is permitted for final discharge to the contact chamber, continuing to Outfall 001. Discharge from the Polishing Pond will continue under the permit as the alum ponds are de -watered. Following de -watering of the alum ponds, there will be no more influent into the Polishing Pond. Discharge from the Polishing Pond will continue as long as water can be conveyed to the contact chamber. Remaining water in the Polishing Pond will be pumped to the aeration basin, and Polishing Pond closure initiated. 5.4. AERATION BASIN AND SPILL COLLECTION BASIN The Spill Collection Basin will be dewatered into the Mixing/Neutralization Chamber and routed to the Aeration Basin. Dewatering will continue as long as water can be conveyed to the Mixing Neutralization Chamber. Remaining water in the Spill Collection Pond will then be collected and pumped into the Aeration Basin, and closure of the Mixing/Neutralization Chamber and Spill Collection Basin initiated. Following dewatering of the Spill Collection Basin, the Aeration Basin will be dewatered as normal into the 18.5K Gal Clarifier. Wasting from the clarifier will continue into the Sludge Drying Bed. Dewatering of the Aeration Basin will continue as long as water can be conveyed to the Clarifier. Remaining water will be collected and pumped into the Clarifier. Aeration Basin closure will then be initiated. 5.5. SLUDGE BED The Sludge Drying Bed will remain in operation for the duration of the dewatering of the Aeration Basin. Upon initiation of closure of the Aeration Basin, sludge remaining in the clarifier will be pumped to the Sludge Drying Bed. Residual water in the Sludge Drying Bed will be collected and disposed of through Pump and Haul to a permitted disposal facility, and closure of the Sludge Drying Bed initiated. 5.6 18 5 CLARIFIER Remaining wastewater in the clarifier will be discharge as normal under the permit through Outfall 001. Following dewatering, closure of the 18K Gal Clarifier will be initiated. At this stage, the WWTP will no longer be processing wastewater, and demolition of the remaining components will be completed. 5.7. DEMOLITION AND FINAL GRADING Following the completion of closure operations of the WWTP components, mechanical equipment will be disassembled and removed, concrete structures will be demolished, berms will be breached and graded, and the final grading operations completed, including filling of components with clean backfill. PAGE 8 WWTP Closure Plan Former Performance Fibers Facility Chatham County, NC December 1, 2017 All clearing and grading operations will be conducted under an approved Erosion and Sediment Control Plan. Borrow areas for clean backfill have been identified within the boundaries of the property and will be identified in the future Erosion and Sediment Control Plan and an Environmental Management Plan for the NC Brownfields Program. The proposed conceptual elevations of the WWTP impoundments to allow stormwater to gravity drain from the closed impoundments is shown in Figure 5. PAGE 9 WithersRavenet Our People Yout Success M. • • - 1 ItO WithersRavenet 00 Our People Your Success FIGURES ao DRAWN BY SCALE FIGURF NO.. W i t h e rs Ra ve n e l MONCURE HOLDINGS UTILITY, LLC PROCESS FLOW Mi NOT TO SCALE 3 ON Engineers I Planners I Surveyors DIAGRAM MAP 338 PEA RIDGE ROAD APPROVEDBY DATE PROJECTNO MONCURE,CHATHAMCOUNTY,NC CB 11/09/17 02150132.00 ..,. v.... I l.w r, r:C .'; 5111: v 1r uor l:r+ u.�._ � c oe,_ I :•:••• «�uw� v...�wi .... c�is�+a o�xr�+eo+a +«w ron. Fb—\aa\wn P— Fa - tow- a.r.rv- " .. wr 6. 3M7 - .wo. "T BASIN ID: AERATION BASI SAMPLE IDS: AB -SLUDGE AB -SEDIMENT ANALYTICAL PARAMETERS: PATHOGEN AND VECTOR REDUCTIONS; I METALS: I ARSENIC, CADMIUM, CHROMIUM, • I COPPER, LEAD, MERCURY, MOLYBDENUM, NICKEL, SELENIUM, I ZINC. NUTRIENTS: I I TKN, AMMONIA NITROGEN, I NITRATE/NITRITE, NITROGEN, PHOSPHORUS, SODIUM, CALCIUM, I MAGNESIUM; I • • I OTHER: PH, TOTAL SOLIDS, TCLP, IGNITABILITY, I BASIN ID POLISHING POND CORROSIVITY, AND REACTIVITY SAMPLE IDS: PP -SLUDGE I PP -SEDIMENT ANALYTICAL PARAMETERS: PATHOGEN AND VECTOR REDUCTIONS; • I • • METALS: I ARSENIC, CADMIUM, CHROMIUM, COPPER, LEAD, MERCURY, MOLYBDENUM, NICKEL, SELENIUM, I ZINC. • • NUTRIENTS: I TKN, AMMONIA NITROGEN, NITRATE/NITRITE, NITROGEN, PHOSPHORUS, SODIUM, CALCIUM, MAGNESIUM; OTHER: PH, TOTAL SOLIDS, TCLP, IGNITABILITY, • ,��. :�,� CORROSIVITY, AND REACTIVITY • ASIN ID: LEGEND SLUDGE AND / OR SEDIMENT COMPOSITE SAMPLE LOCATIONS NOTES: 1.) 2013 AERIAL AND LIDAR DATA OBTAINED FROM THE LOCAL COUNTY GIS DEPART~l�'NT 11 NOTE: ONE SLUDGE AND SEDIMENT SAMPLE WILL BE COLLECTED PER POND VIA COMPOSITE SAMPLING TECHNIQUES. SAMPLE IDS: a m ASIN ID: SPILL POND 0 SAMPLE IDS: SP -SLUDGE SP -SEDIMENT • ANALYTICAL PARAMETERS: PATHOGEN AND VECTOR REDUCTIONS; ALUM POND #1 ALUM POND #2 AP1-SLUDGE AP1-SEDIMENT AP2-SLUDGE AP2-SEDIMENT ANALYTICAL PARAMETERS: PATHOGEN AND VECTOR REDUCTIONS; METALS: ARSENIC, CADMIUM, CHROMIUM, COPPER, LEAD, MERCURY, MOLYBDENUM, NICKEL, SELENIUM, ZINC. NUTRIENTS: TKN, AMMONIA NITROGEN, + NITRATE/NITRITE, NITROGEN, PHOSPHORUS, SODIUM, CALCIUM, MAGNESIUM; OTHER: PH, TOTAL SOLIDS, TCLP, IGNITABILITY, CORROSIVITY, AND REACTIVITY METALS: ARSENIC, CADMIUM, CHROMIUM, COPPER, LEAD, MERCURY, MOLYBDENUM, NICKEL, SELENIUM, ZINC. NUTRIENTS: TKN, AMMONIA NITROGEN, NITRATE/NITRITE, NITROGEN, PHOSPHORUS, SODIUM, CALCIUM, MAGNESIUM; OTHER: PH, TOTAL SOLIDS, TCLP, IGNITABILITY, ,CORROSIVITY. AND REACTIVITY BASIN ID: SLUDGE DRYING BED SAMPLE IDS: SDB-SLUDGE SDB-SEDIMENT ANALYTICAL PARAMETERS: PATHOGEN AND VECTOR REDUCTIONS; METALS: ARSENIC, CADMIUM, CHROMIUM, COPPER, LEAD, MERCURY, MOLYBDENUM, NICKEL, SELENIUM, ZINC. NUTRIENTS: TKN, AMMONIA NITROGEN, NITRATE/NITRITE, NITROGEN, PHOSPHORUS, SODIUM, CALCIUM, MAGNESIUM; OTHER: pH, TOTAL SOLIDS, TCLP, IGNITABILITY, CORROSIVITY, AND REACTIVITY L GRAPHIC SCALE 0 50 10 20 I 1 inch = 100 k. u }z J F pz a0 0 N a U Zua 0 2 � � F J Q Q Oau 2 0o w W M : u u Z O 09 SLUDGE WIL'_ BE REMOVED FROM WATER TREATMENT PLAN CLARIFIER. CONNECT SPILL & AERATION BASIN WITH COMMON TRENCH WITH BASE ELEVATION RANGING FROM 193.00 TO 192.5 FT. SLOPE SIDEWALLS AT 3 1. 2OC' ;'f J �. ti•L FJ 7-i61Ali.L� �!- �j CUBIC FEET OF SLUDGE OF 0.359 ACRE FEET. lkl_ !\ f f CONNECT AERATION BAST f— & POLISHING POND WITH f ,` COMMON TRENCH WITH t _ BASE ELEVATION RANGING FROM APPROX. 192.5 TO 191.5 FT. f / '. APPROXIMATELY 1.552 CUBIC FEET OF SLUDGE OF: CONSTRUCT SIDEWALLS AT +' POLISHING POND TO BASE 0.94 ACRE FEET ELEV. OF APPROX. 191.50 & REMOVE TOP 1-3" OFF INAL GRADE TO ALLOW GRAVITY SIDEWALLS FOR PORTION F OF SLOPES BELOW FLOW THROUGH OUTF ALL SOUTH OF i - ALUM PONDS: SPILL POND: 193.00 FEET f AERATION POND: 192.50 FEET APPROXIMATELY 964.7 POLISHING POND: 191.50 FEET CUBIC FEET OF SLUDGE OR A6"ACP1 FEET 19L' E7 _ ALUM POND a 1: 186.50 FEET J ALUM POND a2: 185.00 FEET ' — i — E APPROXIMATELY 1.309.0 1 OUTFALL: 184.D0 FEET CUBIC FEET OF SLUDGE OR 0811 AC RE FEET. SHOWN ELEV. ARE APPROXIMATE AND WILL BE ADJUSTED TO ACHIEVE GRAVITY I DRAINAGE OF ALL CLOSED AND PARTIALLY L. FILLED STRUCTURES BASED ON EXISTING 180 r l SITE CONDITIONS. �.. FLOW OF STORMWATER %%% FOLLOWING POND / LAGOON BREACHING AND GRADING LEGEND 1D"FOOT LIDAR TOPOGRAPHIC CONTOUR 2 -FOOT LIDAR TOPOGRAPHIC CONTOUR NOTES: 1.12013 AERIAL AND LIDAR DATA OBTAINED FROM THE LOCAL COUNTY G' DEPAR-MENT EXCAVATE TO REMOVE SLUDGE FROM BASE OF POLISHING POND TO BASE ELEV. OF APPROX. 191.50 & REMOVE TOP 1-3" OFF SIDEWALLS FOR PORTION OF SLOPES BELOW NORMAL OPERATING WATERLINE. EXCAVATE TO REMOVE ALUM SLUDGE FROM BASE OF EACH ALUM POND TO APPROX BASE ELEV OF 186.51N THE UPPER POND TO 185.00 IN THE LOWER POND. CONSTRUCTTRENCH FROM BASE OF LOWER ALUM POND TO APPROX BASE ELEV. OF 185.00 &TIE TO 184.00 ELEV. CONTOUR FORDISCHARGE, TRENCH SIDEWALLS SHALL BE 3:1. PROVIDE GRAVEL CHECK DAM OUTLET AT DISCHARGE LOCATION STORM WATER RETENTION _. DITCH AND STORMWATER -' '-- RETENTION POND WILL ABANDONED PRIOR TO WASTE WATER SYSTEM CLOSURE EXCAVATE TO REMOVE SLUDGE FROM BASE OF SPILL BASIN (APPROX. TO ELEV. 190.00. REMOVE TOP 1 -3" OFF SIDEWALLS FOR PORTION OF SLOPES BELOW NORMA.OPERATING WATERLINE. FOLLOWING EXCAVATION IMPORT & PLACE CLEAN COMPACTED EARTH FILL TO RAISE FLOOR ELEVATION TO: EQUALIZATION BASIN. 193.00 AERATION BASIN: 192.5 APPROXIMATELY 330.7 CUBIC FEETOF SLUDGE OF' 0.205 ACRE FEET i -- GRAPHIC SCALE 0 IT 200 400 1 1 inch = 200 ft. V J J Z J H Z a0 0 V) w V w ZoQ 2 Q � F- J Q= 5 u = oo Lj W Cl) V U 0 Z :E W 0 w l• 4 _ ot vv ,�, ` � O 1'. •1912: t«. I mss' �. arm f �� - ♦ / -ti f ` f r -.90 1 93 t, { water lank**� $OBJE: ;��E 10 ,� � ,� ��\�� •\,. \+�" 179 - ,�/ � �, • �i \ / ; / � // �` � `\ � <� I .)" •;� �(1A�' fity -s-- r qt \4000 �ph'k000� \ t MONCURE HOLDINGS UTILITY, LLC "AWN BY SCALE FIGURE NO 0- W i t h e rs Ra ve n e l 338 PEA RIDGE ROAD MJ 1"=2000' 1 NC COUNTY, , Engineers I Planners I Surveyors MONCURE, APPROVED BY: DATE: PROJECT NO.. 115 AxKenan Drive I Cary.NC 275111 t 919.469.334011icense N:C-06321 vnvvcwithersravenetcom GENERAL LOCATION MAP CB 11/09/17 02150132.00 IC\16\15-0130\150132-Ped m "L \Cb\t� Oo«+• CAD-2017.11.10Ap- Mo vmWr 10. 2017 - MMES, INTI