Loading...
HomeMy WebLinkAboutNC0057151_Authorization to Construct_20171205McGill A S S O C 1 A T G S December 5, 2017 RECEIVEDIDENRIDWR DEC 0 7 2017 Mr. Ron Berry Water Resources North Carolina Department of Environmental Quality Permitting Section NPDES Complex Permitting 512 North Salisbury Street (9th Floor Archdale Building) Raleigh, North Carolina 27604 Re: Request for Authorization to Construct Mars Hill WWTP Improvements Town of Mars Hill Madison County, North Carolina Dear Mr. Berry: The Town of Mars Hill hereby requests Authorization to Construct the referenced proposed improvements at the Mars Hill wastewater treatment plant (NPDES NCO057151) as shown and specified in the enclosed plans, specifications and other supporting documents prepared. This submittal includes one hard copy and one digital copy of the following: • Application for Authorization to Construct Permit (Form ATC -12-14) • Engineering plans for the proposed improvements • Engineering specifications for the proposed improvements • Engineering calculations for the proposed improvements If you have any questions or we can provide any additional information, please contact me at michael.whittenburg@mcgillengineers.com or by telephone at 828-252-0575, extension 177. Sincerely, McGILL ASSOCIATES, P.A. )W-0 Michael Whittenburg, E.I. Engineering Associate Enclosures cc: Darhyl Boone, Town of Mars Hill Mike Dowd, McGill Associates I \Projects\2015\15 00325\Letters\rb5dec17ncdwr docx 55 Broad Street P O Box 2259 ph 828 252 0575 Asheville North Carolina 28801 Asheville, North Carolina 28802 f 828 252 2518 www mcgillengmeers corn State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) SECTION 1: INSTRUCTIONS AND INFORMATION A. The Division of Water Resources will accept this application package for review only if all of the items are provided and the application is complete Failure to submit all of the required Items will result in the application package being returned as incomplete per 15A NCAC 02T .0105(b). B. Plans and specifications must be prepared in accordance with 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities C. The plans and specifications submitted must represent a completed final design that is ready to advertise for bid. D. Any content changes made to this Form ATC -12-14 shall result in the application package being returned. E. The Applicant shall submit ONE ORIGINAL and ONE DIGITAL COPY (CD) of the application, all supporting documentation and attachments All information must be submitted bound or in a 3 -ring binder, with a Section tab for each Section, except the Engineering Plans F. Check the boxes below to indicate that the information is provided and the requirements are met G. If attachments are necessary for clarity or due to space limitations, such attachments are considered part of the application package and must be numbered to correspond to the item referenced H. For any project that requires review under the State Environmental Policy Act (SEPA), an Authorization to Construct cannot be issued prior to the completion of a State Clearinghouse advertisement period for a FONSI, EIS, etc. unless the project qualifies for a Determination of Minor Construction Activity I. For more information, visit the Division of Water Resources web site at: https://deg.nc.gov/about/divisions/water-resources/water- resources-perm its/wastewater-branch/npdes-wastewater/authorization-to-construct J. In addition to this Authorization to Construct, the Applicant should be aware that other permits may be required from other Sections of the Division of Water Resources (for example: reclaimed water facilities permits, Class A or B biosolids residuals permit) SECTION 2: APPLICANT INFORMATION AND PROJECT DESCRIPTION A. APPLICANT Applicant's name Town of Mars Hill Signature authority's name per 15A NCAC 02T .0106(b) Darhyl Boone Signature authority's title Town Manager Complete mailing address 280 South Main Street, Mars Hill, NC, 28754 Telephone number 828-689-2301 Email address dboone@townofmarshill.ora B. PROFESSIONAL ENGINEER Professional Engineer's name Mike Dowd, PE Professional Engineer's title Senior Project Manager North Carolina Professional Engineer's License No 024487 Firm name McGill Associates, PA Firm License number C-0459 Complete mailing address 55 Broad Street, Asheville, NC 28801 Application for Authorization to Construct Permit (FORM ATC -12-14) Page 1 Water Resources ENVIRONMENTAL QUALITY State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) Telephone number 828-252-0575 Email address mike.dowd@mcgillengineers.com C. NPDES PERMIT NPDES Permit number NCO057151 Current Permitted flow (MGD) — include permit 0.425 flow phases if applicable D. PROJECT DESCRIPTION Provide a brief description of the project. This prosect consists of concrete basin repairs, the installation of variable frequency drives with automatic controls on two existing 75 hp blowers to improve basin aeration and the installation of one additional 5 hp blower and associated air piping modifications necessary to permit four existing return/waste activated sludge air lift pumps to be operated independently of basin aeration SECTION 3: APPLICATION ITEMS REQUIRED FOR SUBMITTAL FOR ALL PROJECTS A. Cover Letter ® The letter must include a request for the Authorization to Construct, the facility NPDES Number; a brief project description that indicates whether the project is a new facility, facility modification, treatment process modification, or facility expansion, the construction timeline, and a list of all items and attachments included in the application package. ® If any of the requirements of 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3. North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities are not met by the proposed design, the letter must include an itemized list of the requirements that are not met. B. NPDES Permit ® Submit Part I of the Final NPDES permit for this facility that includes Part A (Effluent Limitations and Monitoring Requirements) for the monthly average flow limit that corresponds to the work that is requested for this project. C. Special Order by Consent ❑ If the facility is subject to any Special Orders by Consent (SOC), submit the applicable SOC. ® Not Applicable D. Finding of No Significant Impact or Record of Decision ❑ Submit a copy of the Finding of No Significant Impact or Record of Decision for this project ❑ Provide a brief description of any of the mitigating factors or activities included in the approved Environmental Document that impact any aspect of design of this project, if not specified in the Finding of No Significant Impact or Record of Decision. ® Not Applicable. Application for Authorization to Construct Permit (FORM ATC -12-14) Page 2 State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) E. Engineering Plans ® Per 15A NCAC 02T .0504(c)(1), submit one set of detailed plans that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer. ® Per 21 NCAC 56.1103(a)(6), the name, address and License number of the Licensee's firm shall be Included on each sheet of the engineering drawings. ® Plans must be labeled as follows FINAL DRAWING —FOR REVIEW PURPOSES ONLY— NOT RELEASED FOR CONSTRUCTION. ® 15A NCAC 02H .0124 requires multiple (dual at a minimum) components such as pumps, chemical feed systems, aeration equipment and disinfection equipment. Is this requirement met by the design? ® Yes or ❑ No. If no, provide an explanation - Plans shall include: ® Plans for all applicable disciplines needed for bidding and construction of the proposed project (check as appropriate)- ® Civil ❑ Not Applicable ® Process Mechanical ❑ Not Applicable ❑ Structural ® Not Applicable ® Electrical ❑ Not Applicable ® Instrumentation/Controls ❑ Not Applicable ❑ Architectural ® Not Applicable ❑ Building Mechanical ®Not Applicable ❑ Building Plumbing ®Not Applicable ® Plan and profile views and associated details of all modified treatment units Including piping, valves, and equipment (pumps, blowers, mixers, diffusers, etc.) ® Are any modifications proposed that Impact the hydraulic profile of the treatment facility? ❑ Yes or ® No If yes, provide a hydraulic profile drawing on one sheet that Includes all Impacted upstream and downstream units. The profile shall Include the top of wall elevations of each impacted treatment unit and the water surface elevations within each Impacted treatment unit for two flow conditions: (1) the NPDES permitted flow with all trains In service and (2) the peak hourly flow with one treatment train removed from service ® Are any modifications proposed that impact the process flow diagram or process flow schematic of the treatment facility? ❑ Yes or ®No If yes, provide the process flow diagram or process flow schematic showing all modified flow paths Including aeration, recycle/return, wasting, and chemical feed, with the location of all monitoring and control Instruments noted. F. ® Engineering Specifications ® Per 15A NCAC 02T .0504(c)(2), submit one set of specifications that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer. ® Specifications must be labeled as follows FINAL SPECIFICATIONS — FOR REVIEW PURPOSES ONLY — NOT RELEASED FOR CONSTRUCTION. Specifications shall include: ® Specifications for all applicable disciplines needed for bidding and construction of the proposed project (check as appropriate): ® Civil ❑ Not Applicable ® Process Mechanical ❑ Not Applicable ❑ Structural ® Not Applicable Application for Authorization to Construct Permit (FORM ATC -12-14) Page 3 State of North Carolina Department of Environmental Quality Division of Water Resources K4-r � 0. Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) ® Electrical ❑ Not Applicable ® Instrumentation/Controls ❑ Not Applicable ❑ Architectural ® Not Applicable ❑ Building Mechanical ® Not Applicable ❑ Building Plumbing ® Not Applicable ® Detailed specifications for all treatment units and processes including piping, valves, equipment (pumps, blowers, mixers, diffusers, etc ), and instrumentation. ® Means of ensuring quality and integrity of the finished product including leakage testing requirements for structures and pipelines, and performance testing requirements for equipment. ® Bid Form for publicly bid projects. G. Construction Sequence Plan ® Construction Sequence Plan such that construction activities will not result in overflows or bypasses to waters of the State. The Plan must not imply that the Contractor is responsible for operation of treatment facilities. List the location of the Construction Sequence Plan as in the Engineering Plans or in the Engineering Specifications or in both: Specifications section C-700. H. Engineering Calculations ® Per 15A NCAC 02T .0504(c)(3), submit one set of engineering calculations that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer; the seal, signature and date shall be placed on the cover sheet of the calculations. For new or expanding facilities and for treatment process modifications that are included in Section 4.C, the calculations shall include at a minimum: ❑ Demonstration of how peak hour design flow was determined with a justification of the selected peaking factor. ❑ Influent pollutant loading demonstrating how the design influent characteristics in Section 4.6.2 of this form were determined ❑ Pollutant loading for each treatment unit demonstrating how the design effluent concentrations in Section 4.13.2 of this form were determined ❑ Hydraulic loading for each treatment unit. ® Sizing criteria for each treatment unit and associated equipment (blowers, mixers, pumps, etc.) ❑ Total dynamic head (TDH) calculations and system' curve analysis for each pump specified that is included in Section 4.C.6. ❑ Buoyancy calculations for all below grade structures ❑ Supporting documentation that the specified auxiliary power source is capable of powering all essential treatment units I. Permits ® Provide the following information for each permit and/or certification required for this project (N/A) Application for Authorization to Construct Permit (FORM ATC -12-14) Page 4 Permit/ If Not Issued Provide Not Date Date Certification Status and Expected Permit/Certification Applicable Submitted Approved Number Issuance Date Dam Safety n/a Soil Erosion and Sediment Control n/a Application for Authorization to Construct Permit (FORM ATC -12-14) Page 4 J. Water Resources ENVIRONMENTAL QUALITY State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) USCOE /Section 404 Permit n/a Water Quality Certification (401) n/a USCOE /Section 10 n/a Stormwater Management Plan n/a CAMA n/a NCDOT Encroachment Agreement n/a Railroad Encroachment Agreement n/a Other: Residuals Management Plan ❑ For all new facilities, expanding facilities, or modifications that result in a change to sludge production and/or sludge processes, provide a Residuals Management Plan meeting the requirements of 15A NCAC 02T .0504(i) and 15A NCAC 02T .0508, the Plan must include: ❑ A detailed explanation as to how the generated residuals (including trash, sediment and grit) will be collected, handled, processed, stored, treated, and disposed. ❑ An evaluation of the treatment facility's residuals storage requirements based upon the maximum anticipated residuals production rate and ability to remove residuals. ❑ A permit for residuals utilization or a written commitment to the Applicant from a Permittee of a Department approved residuals disposal/utilization program that has adequate permitted capacity to accept the residuals or has submitted a residuals/utilization program application ❑ If oil, grease, grit or screenings removal and collection is a designated unit process, a detailed explanation as to how the oil/grease will be collected, handled, processed, stored and disposed. ® Not Applicable Application for Authorization to Construct Permit (FORM ATC -12-14) Page 5 Water Resources ENVIRONMENTAL QUALITY State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) SECTION 4: PROJECT INFORMATION A. WASTEWATER TREATMENT PLANT FLOW INFORMATION —COMPLETE FOR NEW OR EXPANDING FACILITIES 1. Provide the following flow information: Application for Authorization to Construct Permit (FORM ATC -12-14) Page 6 Plant Flows Existing Plant Design MGD Current NPDES Permit Limit MGD Current Annual Average (past 12 months) MGD For Past 12 Months: Start Date: month/yr End Date: month/yr For Past 24 Months: Start Date: month/yr End Date: month/yr Maximum Month MGD MGD Maximum Day MGD MGD Peak Hour MGD MGD Application for Authorization to Construct Permit (FORM ATC -12-14) Page 6 State of North Carolina i+y Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) WASTEWATER TREATMENT FACILITY DESIGN INFORMATION — COMPLETE FOR NEW OR EXPANDING FACILITIES AND FOR TREATMENT PROCESS MODIFICATIONS 1. Have all of the requirements of 15 NCAC 02H. 0100, 15A NCAC 02T. North Carolina General Statute 133-3. North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities been met by the proposed design and specifications? 0 Yes or 0 No. If no, provide justification as to why the requirements are not met, consistent with 15A NCAC 02T .0105(n): 2. Provide the design influent and effluent characteristics that are used as the basis for the project design, and the NPDES permit limits for the following parameters: Based on the "Project Basis of Design" parameters listed above, will the proposed design allow the treatment facility to meet the NPDES Permit Limits listed above? 0 Yes orE] No. If no, describe how and why the Permit Limits will not be met, Application for Authorization to Construct Permit (FORM ATC -12-14) Page 7 Project Basis of Design Design Influent Design Influent Influent Concentration Load Concentration - (Must be (Must be Current Annual supported by supported by Design Effluent Average (past Engineering Engineering Concentration and/or NPDES Permit Limits 12 months) if Calculations Calculations Load (monthly average) Parameter Available [Section 3.H]) [Section 3.H]) Ammonia Nitrogen mg/L Summer mg/L Summer (NH3-N) mg/L mg/L Ib/day mg/L Winter mg/L Winter Biochemical mg/L Summer mg/L Summer Oxygen Demand mg/L mg/L Ib/day (BODS) mg/L Winter mg/L Winter Fecal Coliform per 100 mL per 100 mL Nitrate + Nitrite Nitrogen (NO3-N + mg/L mg/L NO2-N) Total Kjeldahl mg/L Nitrogen mg/L mg/L Total Nitrogen Ib/year Ib/year mg/L mg/L Total Phosphorus mg/L mg/L Ib/day Ib/year Ib/year Total Suspended mg/L mg/L Ib/day mg/L mg/L Solids (TSS) Based on the "Project Basis of Design" parameters listed above, will the proposed design allow the treatment facility to meet the NPDES Permit Limits listed above? 0 Yes orE] No. If no, describe how and why the Permit Limits will not be met, Application for Authorization to Construct Permit (FORM ATC -12-14) Page 7 Wafer Resources ENVIRONMENTAL QUALITY State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) 4. Per 15A NCAC 02T .0505('1, by-pass and overflow lines are prohibited. Is this condition met by the design? ® Yes or ❑ No If no, describe the treatment units bypassed, why this is necessary, and where the bypass discharges 5. Per 15A NCAC 02T .0505(k), multiple pumps shall be provided wherever pumps are used Is this condition met by the design? ® Yes or ❑ No If no, provide an explanation. 6 Per 15A NCAC 02T.050501, power reliability shall be provided consisting of automatically activated standby power supply onsite capable of powering all essential treatment units under design conditions, or dual power supply shall be provided per 15A NCAC 02H. 0124(2)(a) Is this condition met by the design? ® Yes or ❑ No If no, provide (as an attachment to this Application) written approval from the Director that the facility: ➢ Has a private water supply that automatically shuts off during power failures and does not contain elevated water storage tanks, and ➢ Has sufficient storage capacity that no potential for overflow exists, and ➢ Can tolerate septic wastewater due to prolonged detention 7. Per 15A NCAC 02T .0505(0), a minimum of 30 days of residual storage shall be provided. Is this condition met by the design? ® Yes or ❑ No If no, explain the alternative design criteria proposed for this project in accordance 15A NCAC 02T .105(n). 8. Per 15A NCAC 02T.0505(g), the public shall be prohibited from access to the wastewater treatment facilities Explain how the design complies with this requirement The prosect area is located within the existing gated WWTP 9. Is the treatment facility located within the 100 -year flood plain? ❑ Yes or ® No If yes, describe how the facility is protected from the 100 -year flood: C. WASTEWATER TREATMENT UNIT AND MECHANICAL EQUIPMENT INFORMATION —COMPLETE FOR NEW OR EXPANDING FACILITIES AND FOR MODIFIED TREATMENT UNITS PRELIMINARY AND PRIMARY TREATMENT (i e, physical removal operations and flow equalization): Application for Authorization to Construct Permit (FORM ATC -12-14) Page 8 No. of Plan Sheet Specification Calculations Treatment Unit Units Type Size per Unit Reference Reference Provided? (Yes or No) Manual Bar Screen MGD at peak hourly flow Mechanical Bar MGD at peak hourly flow Screen Grit Removal MGD at peak hourly flow Flow Equalization -- gallons ft diameter; ft side Primary Clarifier Circular water depth Primary Clarifier Rectangular square feet; ft side water depth Other Application for Authorization to Construct Permit (FORM ATC -12-14) Page 8 Water Resources ENVIRONMENTAL QUALITY State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) SECONDARY TREATMENT (BIOLOGICAL REACTORS AND CLARIFIERS) (i.e., biological and chemical processes to remove organics and nutrients) 3. TERTIARY TREATMENT No. of Type Size per Unit Plan Sheet Specification Calculations Treatment Unit Units Type Size per Unit Reference Reference Provided? gal/day per bank at (Yes or No) Aerobic Zones/ (Parallel; in gallons Tanks Circular side water depth Anoxic Zones/ gallons Tanks Rectangular side water depth Anaerobic tablet; liquid) gallons Zones/Tanks square feet Sequencing Batch -- gallons Reactor (SBR) -- gallons Membrane -- gallons Bioreactor (MBR) Post -Aeration ft diameter; ft Secondary Clarifier Circular side water depth square feet, ft Secondary Clarifier Rectangular side water depth Other 3. TERTIARY TREATMENT 4. DISINFECTION Treatment Unit No. of Type Size per Unit Plan Sheet Specification Calculations Treatment Unit Units Type Size per Unit Reference Reference Provided? gal/day per bank at (Yes or No) Ultraviolet Light (Parallel; in ft diameter, ft Tertiary Clarifier Circular side water depth square feet; ft Tertiary Clarifier Rectangular side water depth Tertiary Filter tablet; liquid) square feet Tertiary Membrane square feet Filtration Post -Treatment -- gallons Flow Equalization Post -Aeration gallons Other 4. DISINFECTION Treatment Unit No. of Type Size per Unit Plan Sheet Specification Calculations Provided? Units Reference Reference (Yes or No) gal/day per bank at Ultraviolet Light (Parallel; in peak hourly flow; series) number of banks; number of lamps/bank (Gas; gallons of contact Chlorination tablet; liquid) tank/unit Application for Authorization to Construct Permit (FORM ATC -12-14) Page 9 Water Resources ENVIRONMENTAL QUALITY State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) Dechlorination No. of (Gas, gallons of contact I Plan Sheet Specification Calculations Treatment Unit Units tablet, liquid) tank/unit Reference Reference Provided? 5. RESIDUALS TREATMENT 6. PUMP SYSTEMS (include influent, intermediate, effluent, major recycles, waste sludge, thickened waste sludge and plant drain pumps) Location No. of purpose Type Plan Sheet Specification Calculations Treatment Unit Units Type Size per Unit Reference Reference Provided? n/a C-103 & 104 n/a (Yes or No) Gravity Thickening square feet; ft side Tank water depth Mechanical Thickening/ dry Ib/hour Dewatering Aerobic Digestion gallons Anaerobic gallons Digestion Composting dry Ib/hour Drying dry Ib/hour Other 6. PUMP SYSTEMS (include influent, intermediate, effluent, major recycles, waste sludge, thickened waste sludge and plant drain pumps) Location No. of Pumps purpose Type Capacity of each pump plan Sheet Reference Specification Reference GPM TDH clarifiers 4 return/waste sludge air lift 220 n/a C-103 & 104 n/a 7. MIXERS Location No. of Mixers Purpose Type Power of ixer each MP) plan Sheet Reference Specification Reference Application for Authorization to Construct Permit (FORM ATC -12-14) Page 10 Wa ter Resources ENVIRONMENTAL QUALITY 8. BLOWERS State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) Location No. of Blowers purpose Type Capacity of each Blower (CFM) plan Sheet Reference Specification Reference Clarifier 2 1 drive sludge air lifts positive displacement 50 C-103 & 104 113760 Below Any habitable residence or place of assembly under separate 100 ft ❑ Yes ❑ No ownership or not to be maintained as part of the project site Any private or public water supply source 100 ft ❑ Yes ❑ No Surface waters (streams — intermittent and perennial, perennial 50 ft ❑ Yes ❑ No waterbodies, and wetlands) Any well with exception of monitoring wells 100 ft ❑ Yes ❑ No Any property line 50 ft ❑ Yes 9. ODOR CONTROL Location No. of Units purpose Type Plan Sheet Reference Specification Reference Setback Parameter Treatment/Storage Design? If identify Unit Setback Waivers in Item D.2 Below Any habitable residence or place of assembly under separate 100 ft ❑ Yes ❑ No ownership or not to be maintained as part of the project site Any private or public water supply source D. SETBACKS —COMPLETE FOR NEW WASTEWATER TREATMENT STRUCTURES 1 The minimum distance for each setback parameter to the wastewater treatment/storage units per 15A NCAC 02T .0506(b) are as follows. Have any setback waivers been obtained per 15A NCAC 02T .0506(d)? ❑ Yes or ❑ No. If yes, have these waivers been written, notarized and signed by all parties involved and recorded with the County Register of Deeds? ❑ Yes or ❑ No If no, provide an explanation: n a Application for Authorization to Construct Permit (FORM ATC -12-14) Page 11 Minimum Distance Is Minimum Distance Required from Nearest Requirement met by the "No", Setback Parameter Treatment/Storage Design? If identify Unit Setback Waivers in Item D.2 Below Any habitable residence or place of assembly under separate 100 ft ❑ Yes ❑ No ownership or not to be maintained as part of the project site Any private or public water supply source 100 ft ❑ Yes ❑ No Surface waters (streams — intermittent and perennial, perennial 50 ft ❑ Yes ❑ No waterbodies, and wetlands) Any well with exception of monitoring wells 100 ft ❑ Yes ❑ No Any property line 50 ft ❑ Yes ❑ No Have any setback waivers been obtained per 15A NCAC 02T .0506(d)? ❑ Yes or ❑ No. If yes, have these waivers been written, notarized and signed by all parties involved and recorded with the County Register of Deeds? ❑ Yes or ❑ No If no, provide an explanation: n a Application for Authorization to Construct Permit (FORM ATC -12-14) Page 11 State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) SECTION 5: APPLICATION CERTIFICATION BY PROFESSIONAL ENGINEER Professional Engineer's Certification per 15A NCAC 02T.0105: I, Mike Dowd, attest that this application package for an Authorization to Construct (Typed Name of Professional Engineer) for the Mars Hill Wastewater Treatment Plant (Facility and Project Name) was prepared under my direct supervisory control and to the best of my knowledge is accurate, complete and consistent with the information supplied in the engineering plans, specifications, calculations, and all other supporting documentation for this project. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with all applicable regulations and statutes, 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities, and this Authorization to Construct Permit Application, except as provided for and explained in Section 4.13.1 of this Application. I understand that the Division of Water Resources' issuance of the Authorization to Construct Permit may be based solely upon this Certification and that the Division may waive the technical review of the plans, specifications, calculations and other supporting documentation provided in this application package. I further understand that the application package may be subject to a future audit by the Division. Although certain portions of this submittal package may have been prepared, signed and sealed by other professionals licensed in North Carolina, inclusion of these materials under my signature and seal signifies that I have reviewed the materials and have determined that the materials are consistent with the project design. I understand that in accordance with General Statutes 143-215 6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal with written signature placed over or adjacent to the seal and dted: JIM I i SEAL 024487 EL Z.O��y � I (!�14 Application for Authorization to Construct Permit (FORM ATC -12-14) Page 12 State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) SECTION 6: APPLICATION CERTIFICATION BY APPLICANT Applicant's Certification per 15A NCAC 02T .0106(b): I, Darhvl Boone, Town Manager, attest that this application package for an Authorization to Construct (Typed Name of Signature Authority and Title) for the Mars Hill Wastewater Treatment Plant (Facility and Project Name) has been reviewed by me and is accurate and complete to the best of my knowledge. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. I further certify that in accordance with 15A NCAC 02T .0120(b), the Applicant or any affiliate has not been convicted of environmental crimes, has not abandoned a wastewater facility without proper closure, does not have an outstanding civil penalty where all appeals have been abandoned or exhausted, are compliant with any active compliance schedule, and does not have any overdue annual fees. I understand that the Division of Water Resources' issuance of the Authorization to Construct Permit may be based solely upon acceptance of the Licensed Professional Engineer's Certification contained in Section 5, and that the Division may waive the technical review of the plans, specifications, calculations and other supporting documentation provided in this application package. I further understand that the application package may be subject to a future audit. I understand that in accordance with General Statutes 143-215.6A and 143-215.6B any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Signature: Date: IA— V-17 THE COMPLETED APPLICATION AND SUPPORTING INFORMATION SHALL BE SUBMITTED TO: NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER RESOURCES/NPDES By U.S. Postal Service By Courier/Special Delivery: 1617 MAIL SERVICE CENTER 512 N. SALISBURY STREET, 9TH FLOOR RALEIGH, NORTH CAROLINA 27699-1617 RALEIGH, NORTH CAROLINA 27604 TELEPHONE NUMBER: (919) 807-6396 Application for Authorization to Construct Permit (FORM ATC -12-14) Page 13 rM Permit NCO057151 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT TO DISCHARGE WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, ,as amended, Town of Mars Hill is hereby authorized to discharge wastewater from a facility located at the Mars Hill Wastewater Treatment Plant (WWTP) 504 Cascade Street, Mars Hill Madison County to receiving waters designated as Gabriel Creek in the French Broad River Basin in accordance with effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV hereof. This permit shall become effective March 1, 2016. This permit and authorization to discharge shall expire at midnight on September 30, 2 02 0. Signed this day February 2, 2016. m C•,� y Zimmerman, P. G., Direet+gf--- ivision of Water Resources By Authority of the Environmental Management Commission Page 1 of 5 Permit NCO057151 SUPPLEMENT TO PERMIT COVER SHEET All previous NPDES Permits issued to this facility, whether for operation or discharge are hereby revoked. As of this permit issuance, any previously issued permit bearing this number is no longer effective. Therefore, the exclusive authority to operate and discharge from this facility arises under the permit conditions, requirements, terms, and provisions included herein. Town of Mars Hill is hereby authorized to: 1. continue to operate an existing 0.425 MGD wastewater treatment system consisting of following treatment components: • comminutor • bar screen • grit removal chamber • flow meter with totalizer • three (3) aeration tanks • clarifier • aerobic digestor with sludge return • chlorine -contact tank • sludge drying beds • standby power supply these facilities located at the Mars Hill WWTP, 504 Cascade Street, Mars Hill, Madison County, and 2. discharge from said treatment works via Outfall 001, at the location specified on the attached map, into Gabriel Creep [Stream Segment 6-96-12], a waterbody currently classified C within subbasin 04-03-04 [HUC: 06010105] of the French Broad River Basin. Page 2 of 5 ' . r PART I Permit NCO057151 A. (1.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS [15A NCAC 02B .0400 et seq.; 02B .0500 et seq.] During the period beginning on the effective date of this permit and lasting until expiration, the Permittee is authorized to discharge from Outfall 001. Such discharges shall be limited, monitored and reported 1 by the Permittee as specified below: _ 'EFFLUENT 4 , , , LIlVIITS MONTI'ORYNG `REQUI)ttEMENTS CHARACTERISTICS _ " Monthly Weekly Daily , Measurement Simple' Sample (Parameter Codes) Average Average. Maximum Frequencyr Type . Location 2 Flow 00500 0.425 MGD Continuous Recording I or E Total Residual Chlorine 3 C0530 17 pg/L 2/Week Grab E BOD, 5 -day (20°C) 4 C0310 30.0 mg/L 45.0 mg/L Weekly Composite I & E Total Suspended Solids 4 C0530 30.0 mg/L 45.0 mg/L Weekly Composite I & E Dissolved Oxygen 00300 Daily Ave. > 5.0 mg/L Weekly Grab E Temperature (°C) 00010 Weekly Grab E NH3 as N (April 1— October 31) C0610 2.0 mg/L 6.0 mg/L Weekly Composite E NH3 as N (November 1 — March 31) C0610 4.0 mg/L 12.0 mg/L Weekly Composite E Fecal Coliform (geometric mean) 31616 200/100 ml 400/100 ml Weekly Grab E pH 00400 Not < 6.0 or > 9.0 Standard Units Weekly Grab E Total Nitrogen (NO2+NO3+TKN) C0600 Semi -Annually Composite E Total Phosphorus C0665 Semi -Annually Composite E Dissolved Oxygen 00300 Weekly Grab U & D Temperature (°C) 00100 Weekly Grab U & D Footnotes: 1. Beginning no later than 270 days from the effective date of this permit, the Permittee shall submit discharge monitoring data electronically using the NCDWR's Electronic Discharge Monitoring Report (eDMR) internet application [see Section A. (2.)]. 2. E = Effluent; I = Influent; U = Upstream 50 ft from the outfall; D = Downstream two (2) miles at NCSR 1559 3. Total Residual Chlorine (TRC) - The Division shall consider compliant all effluent TRC values reported below 50 pg/L. However, the Permittee shall continue to record and report all values detected by North Carolina - certified test methods (including field certified), even if these values fall below 50 pg/L. 4. The monthly average effluent BOD5 and Total Suspended Solids concentrations shall not exceed 15% of the respective influent value (i.e., 85% removal required). Condition: This discharge shall contain of floating solids or foam. Page 3 of 5 Permit NCO057151 A. (2.) ELECTRONIC REPORTING - DISCHARGE MONITORING REPORTS [GS. 143-215.1(b)] Proposed federal regulations require electronic submittal of all discharge monitoring reports (DMRs) and specify that, if a state does not establish a system to receive such submittals, then Permittees must submit DMRs electronically to the Environmental Protection Agency (EPA). NOTE: This special condition supplements or supersedes the following Sections within Part Il of this permit (Standard Conditions for NPDES Permits): • Section B. (11.) Signatory Requirements • Section D. (2.) Reporting • Section D. (6.) Records Retention • Section E. (5.) Monitoring Reports 1. Reporting [Supersedes Section D. (2.) and Section E. (5.) (a)1 Beginning no later than 270 days from the effective date of this permit, the Permittee shall submit discharge monitoring data electronically using the NC DWR's Electronic Discharge Monitoring Report (eDMR) internet application. Monitoring results obtained during the previous month(s) shall be summarized for each month and submitted electronically using eDMR. The eDMR system allows permitted facilities to enter monitoring data and submit DMRs electronically using the internet. Until such time that the state's eDMR application is compliant with EPA's Cross -Media Electronic Reporting Regulation (CROMERR), Permittees will be required to submit all discharge monitoring data to the state electronically using eDMR and will be required to complete the eDMR submission by printing, signing, and submitting one signed original and a copy of the computer printed eDMR to the following address: NCDEQ / DWR / Information Processing Unit ATTENTION: Central Files / eDMR 1617 Mail Service Center Raleigh, North Carolina 27699-1617 If a Permittee is unable to use the eDMR system due to a demonstrated hardship, or due to the facility being physically located in an area where less than 10 percent of the households have broadband access, then a temporary waiver from the NPDES electronic reporting requirements may be granted and discharge monitoring data may be submitted on paper DMR forms (MR 1,1.1, 2, 3) or alternative forms approved by the Director. Duplicate signed copies shall be submitted to the mailing address above. Requests for temporary waivers from the NPDES electronic reporting requirements must be submitted in writing to the Division for written approval at least sixty (60) days prior to the date the facility would be required under this permit to begin using eDMR. Temporary waivers shall be valid for twelve (12) months and shall thereupon expire. At such time, DMRs shall be submitted electronically to the Division unless the Permittee re -applies for and is granted a new temporary waiver by the Division. Page 4 of 5 Permit NC0057151 Information on eDMR and application for a temporary waiver from the NPDES electronic reporting requirements is found on the following web page: hq://portal.NCDEO.ordweb/wg/admin/bog//iyu/edmr Regardless of the submission method, the first DMR is due on the last day of the month following the issuance of the permit or in the case of a new facility, on the last day of the month following the commencement of discharge. 2. Signatory Requirements [Supplements Section B. (11.) (b) and Supersedes Section B. (11.) (d)1 All eDMRs submitted to the permit issuing authority shall be signed by a person described in Part 11, Section B. (I 1.)(a), or by a duly authorized representative of that person as described in Part H, Section B. (11.)(b). A person, not an assigned position, must be delegated signatory authority for eDMR reporting purposes. For eDMR submissions, the person signing and submitting the DMR must obtain an eDMR user account and login credentials to access the eDMR system. For more information on North Carolina's eDMR system, registering for eDMR and obtaining an eDMR user account, please visit the following web page: http://portal.NCDEO.or web/wq/admin/bog ipu/edmr Certification. Any person submitting an electronic DMR using the state's eDMR system shall make the following certification [40 CFR 122.22]. NO OTHER STATEMENTS OF CERTIFICATION WILL BE ACCEPTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. " 3. Records Retention [Supplements Section D. (6.)1 The Permittee shall retain records of all Discharge Monitoring Reports, including eDMR submissions. These records or copies shall be maintained for a period of at least 3 years from the date of the report. This period may be extended by request of the Director at any time [40 CFR 122.41]. Page 5 of 5 DESIGN CALCULATIONS SEWER SYSTEM LVIPROVEMENTS WWTP AND I-26 INTERCHANGE TOWN OF MARS HILL MADISON COUNTY, NORTH CAROLINA CA&0 OQ.o�Essio.�,-y MIKE DOWD, PE SEAL 024487 = N GINE�•� � ChNAEL TV McGill ASSOCIATES Engineering • Planning • Finance Asheville, North Carolina NOVEMBER 2017 WWTP Design Flow: NPDES Permit No. NC0057151 Discharge Limit = Design Daily Flow = ddf = 425,000 gallons/day (295 gallons/minute) Average Annual Daily Discharge = 160,000 gallons/day (I 11 gallons/minute) Design Return Activated Sludge Flow: Return Activated Sludge Flow = 50% to 150% of design average flow per Ten State Standards 92.41 RAS Q =148 to 443 gallons/minute (37 to 111 gpm per sludge eductor) Return Sludge Pipe Capacity The controlling (smallest, and longest) return sludge line connects Clarifier #2 to the digester. This return sludge line must be capable of carrying half of the RAS, or up to 222 gpm. Pipe Diameter = 6 inches Inlet elevation = 2201.99' Outlet elevation = 2202.15' Length = 20.68 feet oz.ls—z2o199 Slope = 2z = 0.0077 2068 RH = diameter (in) = 6 = 0.125 48 48 1.486 2 1 1.486 2 1 ft V — 0.013 X (RHP X S2 — 0.013 x (0.125)3 x (0.0077)z = 2.51 s ft'R( Z)Z ft3 x7.48 gall (,60s 1Q = VA = 2.51 X =0.49s l ft3 J minl = 222 gpm Air Lift Pump Capacity The previous Authorization to Construct application for the WWTP expansion sized the sludge holding basin's blower at 225 cfin, with 200 cfin required for basin aeration and 25 cfin to operate two sludge air lift pumps. Consequently, 50 cfin should operate four air lift PUMPS. The McGraw Hill Pump Handbook, 1St ed. by Karassik, Messina, Krutzsch, & Fraser states that —0.15 cfin is required to pump 1 gpm for an air lift pump with a Head/Submergence 2 ratio of 0.4. The amount of liquid that can be pumped per cfin increases as H/S ratio decreases, implying that for this application, the air required should be less than 0.15 cfm/gpm. Head= 3 ft Submergence = 17.3 ft (according to original design drawings) H/S Ratio = 0.17 443 gpm - 4 air lift pumps =111 gpm/pump 50 cfm _ 4 air lift pumps =12.5 cfin/pump 12.5 cfm_ cfm 111 gpm 0.11 gpm Transactions of the American Institute of Mining and Metallur 'cgY al Engineers Vol. 63, p. 444 discusses calculating air requirements in the article "Unwatering a Mine by Air -Lift," and gives an air lift formula attributed to the Ingersoll-Rand Co. as follows: Li = length of the lift section (ft) = 3 LS = length of the submerged section (ft) = 17.3 C = constant that depends on Ll (given as 245 for 10-60 ft of lift) = 245 0.8L1 _ 0.8(3) CFM _ Va Clo LS +34 24510 17.3+34) = 0.055 gal 910 ( 34 ) 910 ( 34 Air= 0.055 cFM x 443 gal = 24.3 CFM gal mtn While it may not be appropriate to extrapolate given that this formula is meant for a minimum lift of 10 ft, this result as well as the previous citation suggests that a total of 50 CFM should be at least adequate for the return sludge flow required. Air Lift Pump Discharge Pressure While the intake of the sludge eductors extends almost to the full depth of the sludge hoppers, the proposed PD blower will discharge into sludge eductors at a depth of approximately 12 feet according to design drawings. 12 ft depth = 5.2 psi 2.31psi Head loss through blower silencer, inlet filter, air piping and fittings = 0.5 psi Pressure = 5.2 psi + 0.5 psi = 5.7 psi = 6.0 psi 3 Main Aeration Blower VFD Controls As the aeration basins are currently operated, dissolved oxygen in aeration basin #3 is frequently observed to be 3.0 mg/1 or higher. Operators would prefer to maintain dissolved oxygen concentrations closer to the 2.0 mg/l minimum stated in Ten State Standards 92.33. The main blowers for the plant are two 75 hp Roots 616J blowers driven by 1750 rpm motors with belts and pulleys Motor pulley dia. = 18" Blower pulley dia. =13" Blower speed =1750 rpm( -13"1) = 2420 rpm Pressure at the blowers will be the sum of piping losses, water pressure at the diffusers, and head loss through the diffusers. Diffuser depth= 11.25 ft 11.25 ft depth = 4.87 psi 2.31 psi Head loss through coarse bubble diffusers = 0.5 psi Head loss through blower silencers and inlet filter = 1.0 psi Head loss through air piping and fittings = 0.5 psi Pressure = (4.87 + 0.5 + 1.0 + 0.5) psi = 6.87 psi According to the pressure -performance curves provided by the manufacturer for the existing blowers, the existing blowers should discharge approximately 1600 cfin at 7.0 psi. The replacement of the existing motors with newer 75 hp motors on variable frequency drives capable of turning the motor rpm down from 1750 to 700 rpm or slower would permit the blowers to discharge at any point on their curve. E mi -y m w�ww� w��w rw wwr�w wrwww wiwiw wiiiw w�www iiiii ww!iww �� �iw �_�� �Qwrw wwrr wrrrw w���� i � MM i E .� ���www www- w_ w_r_r_w_r_ �ri_w_r_w rr_ww�w w.�w�i iwwwr���wwwww�w� ��wi i __iii -iii iii --iiiii