Loading...
HomeMy WebLinkAbout20171418 Ver 1_Shoreline Stabilization_20171102V ' state of North Carolina ..:'�,-.� •x.,, -,_$ .sr: Department of Environment and Natural Resources Division of Water Resources 15A NCAC 02H .0500 — Water quality Certification, shoreline Stabilization Division of Water Resources FORM: SSGP 10-2013 Shoreline Stabilization Application Form %' 1 7 1 4 1 Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 I. Applicant Information [ ] 1. Owner Information Name: '+ J 'lei Mailing Address: - Li y7ccIti-4-h 4 VC SCS 9�2- Telephone Number: '7c'4 -73J' .S70 ! Fax Number: E-mail Address: 21�� -q K e6 Y1 e. 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded her ) must be attached if the Agent has signed this application form. Name: I -'r— avis Company Affiliation: Ales -,J i ul Mailing Address: Po 80x et 3 ✓Jen vim✓ /V -C_ Z X303 7 Telephone Number: FaxNumber: 70Y -5f60-1'1&2- E-mail Address: 0 /rbc- P_ )��✓�,. ter'7 Person to receive the Certification Approval: ma4L /� SIS Ii. Project Information [ j 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSCP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) /� County: �'� �,, 6c. --Nearest Town: AI&JUr1 Corr OVep— Subdivision name or site address (include phase/lot number): 2 74 73 Directions to site - please include road names and numbers, landmarks, etc.: Latitude (in dedmal degrees) Longitude (dedmal degrees) 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): _ Xe�,wL 6. Property size (acres): 7. Lake/ river/ ocean ad 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): =Xr�t� re -1014.c e rit) / ru/. 9. Will work be conducted from land? 0 From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: _. 01 ;2!4f � 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): PILl Owner Agent's Signature U Date Agent's signature is valid only if an authorization letter from the owner is provided FORM: SSGP to -2013 Page 2 of 3 —-_._......... __ Iry La ke (At Full Poled/ Normal Nater Level) Full Pond/ Normal Water Level Shoreline r } � z 'fi'g 6 aFP # Sues l L i L i g 1 S y44. 44 1 l 1 a 3 s Please approximately sketch the following information on this plan (provide dimensions for each Item, such as 10 ftx 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation I Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 x✓ 6 ', it k p_ $ ,