Loading...
HomeMy WebLinkAbout20171358 Ver 1_Stormwater Management Plan_20171205Wanucha, Dave From: Sent: To: Cc: Subject: Attachments: Mark Davis <msdavis@vaughnmelton.com> Tuesday, December 05, 2017 9:34 AM Wanucha, Dave Frank Gioscio [External] FW: Town of Beech Mountain Sidepath Project Permit Application - Stormwater Management Plan Beech Mtn Sidepath Project_HYD_SMPv2.07_(20171129) (Oct 2016) (003).xls; Town of Beech Mountain Sidepath - Alternate Design.pdf �A�JTI��'; External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. Dave, Attached is the subject Stormwater Management Plan you requested. The sidepath will be constructed with a 2% maximum cross-slope, which will allow stormwater to sheetflow off the path onto grassed shoulders and fill slopes. There will be no lateral ditches associated with the sidepath. In addition, I am including an alternate design sheet on the north end of the project to reduce costs of retaining walls and right of way acquisition. The Town cannot afford retaining walls and space is limited adjacent to NC 184 on the north end due to residences. An alternate design using an 8-foot wide boardwalk is being investigated from Sta. 11+90 to Sta. 16+30 to reduce costs and avoid impacts to the residences in this area. We are waiting on comments from NCDOT regarding this design. This design will not affect the permit areas in the original permit application. If you have any questions, please advise. Thanks, Mark Mark S. Davis Environmental Specialist Vaughn & Melton Consulting Engineers 40 Colonial Square Sylva, NC 28779 rn�sd_avi s C�.va_u.� h n rn� eltcr_n..�ca.rn� 828-354-0117 (Office) 828-508-9670 (Cell) ��`�� ��� - �, From: Wanucha, Dave [mailto:dave.wanucha@ncdenr.gov] Sent: Wednesday, November 15, 2017 11:27 AM To: Mark Davis <msdavis@vaughnmelton.com> Subject: Town of Beech Mountain Sidepath Project Permit Application Mark, Please send information regarding your stormwater management plan (SMP). You stated in the PCN that the project is covered by NCDOT's NPDES Permit, which is fine but we need information related to how stormwater will be managed for the project. Attached is a spreadsheet DOT uses for that purpose. I'm guessing that existing roadside grass-lined ditches will be utilized to treat stormwater; however, you need to provide a narrative and/or specs to explain what exactly will be done because there is nothing in the application that describes the plan. Thanks. Dave Wanucha Division of Water Resources Transportation Permitting Unit NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile ��u�_.�OV�ii�_u�lh�_�u��d�u�ir.ar�u NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 a������ �������,��:s���������� �� ����� ������ ��`��,� ����:����,�,� �,� ,�������� �� ��`�� �V����� �°��������� ��.����� ��������,� ��W�r ����:� a���.� �� ���,����,���� �� �������� �s�����,�.