HomeMy WebLinkAbout20161268 Ver 1_R-3300 Geotech Surveys_20171207Carpenter,Kristi
From: Steenhuis, Joanne
Sent: Thursday, December 07, 2017 12:57 PM
To: Herndon, T. Mason; Shaver, Brad
Subject: RE: R-3300 Geotech Surveys
Mason,
Per your e-mail response, the DWR is satisfied that the proposed geotechnical work will
fall under the No Written Concurrence required for GC 4132 that corresponds with the
USACE's NW6.
From: Herndon, T. Mason
Sent: Thursday, December 7, 2017 12:06 PM
To: Shaver, Brad <Brad.E.Shaver@usace.army.mil>; Steenhuis, Joanne
<joanne.steenhuis@ncdenr.gov>
Subject: RE: R-3300 Geotech Surveys
Joanne, per our phone conversation earlier, the only ground disturbance anticipated
with this survey will be directly associated the core borings. The Division will be
instructing the contractor to use mats in areas where ground conditions in jurisdictional
are susceptible to rutting.
Thanks!
Mason Herndon
Environmental Program Supervisor
Division 3
NCDOT- Division of Highways
910-341-2036 office
910-604-0050 mobile
trrr�herndcrn(�ncdcrt.�crv
5501 Barbados Blvd
Castle Hayne, NC 28429
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.
From: Herndon, T. Mason
Sent: Monday, December 04, 2017 9:26 AM
To: Shaver, Brad <I�_ra_d..:_�..�5_haver(c�_usa�e:arm�.�:_m�.%I>; Steenhuis, Joanne
i
<jcranne.steenhuis('�ncdenr.�;crv>
Subject: R-3300 Geotech Surveys
The Division's consultant for R-3300 (Stantec) is setting up contracts with Falcon
Engineering and Catlin Engineering to begin boring and soundings at proposed
structures and along the -L- of R-3300 A and B. Attached is the proposals/estimates for
the Structure Borings on A& B and borings/soundings along the -L- of the A
section. The borings/soundings on the B alignment will be done a little later so we do
not have an estimate or numbers for this section yet, but the proposed locations are
shown on the maps that I'm sending to you separately via FTS. We are proposing to
proceed with this work under Nationwide 6 and WQC 4085 and the permits and their
conditions will be included in the contract package.
Please review the attached information and confirm that this work can be completed
under the conditions of these permits and does not require written approval from you
agency.
If you have any questions or require any additional information please do not hesitate
to contact me.
Mason Herndon
Environmental Program Supervisor
Division 3
NCDOT- Division of Highways
910-341-2036 office
910-604-0050 mobile
trrr�herndcrn(�ncdcrt.�crv
5501 Barbados Blvd
Castle Hayne, NC 28429
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.
I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl
I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a,
I�arti��,