Loading...
HomeMy WebLinkAbout20090092 Ver 1_Application_20090127Office Use Only Corps action ID no DWQ project no 2 0 9 2 Form Version 1 3 Dec 10 2008 Pre-Construction ' ication (PCN) Form A Applicant Information 1 Processing la Type(s) of approval sought from the Corps X Section 404 Permit ? Section 10 Permit lb Specify Nationwide Permit (NWP) number or General Permit (GP) number 31 1 c Has the NWP or GP number been verified by the Corps? XYes No 1d Type(s) of approval sought from the DWQ (check all that apply) X401 Water Quality Certification - Regular X Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express X Ripanan Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ? Yes X No For the record only for Corps Permit ? Yes X No if Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program ? Yes XNo 1 g Is the project located in any of NC's twenty'coastal counties If yes, answer 1 h below X Yes ? No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes X No 2 Project Information 2a Name of project Craven 119 2b County Craven 2c Nearest municipality / town Cove City 2d Subdivision name N/A 2e NCDOT only, T I P or state project no 2B 202521 3 Owner Information N/A 3a Name(s) on Recorded Deed 3b Deed Book and Page No 3c Responsible Party (for LLC if applicable) 3d Street address 3e City, state, zip 3f Telephone no 3g Fax no 3h Email address Page 1 of 11 PCN Form - Version 1 3 December 10, 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is XAgent ? Other, specify 4b Name Jay B Johnson 4c Business name (if applicable) North Carolina Department of Transportation 4d Street address P O Box 1587 4e City, state, zip Greenville, NC 27835 4f Telephone no 252-830-3490 4g Fax no 252-830-3341 4h Email address tbjohnson@ncdot gov 5 Agent(Consuitant Information (if applicable) NIA 5a Name 5b Business name (if applicable) 5c Street address 5d City, state, zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 11 B. Project Information and Prior Project History 1 Property Identification la Property identification no (tax PIN or parcel ID) Craven 119 Latitude N 35 159618 Degrees Longitude 1 b Site coordinates (in decimal degrees) - W 77 339749 Degrees (DD DDDDDD) (-DD DDDDDD) 1 c Property size NIA acres 2. Surface Waters 2a Name of nearest body of water (stream, river, etc ) to Grape Creek proposed project 2b Water Quality Classification of nearest receiving water C,Sw,NSW 2c River basin Neuse 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Agricultural 3b List the total estimated acreage of all existing wetlands on the property NIA 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 60' 3d Explain the purpose of the proposed project Bridge to Pipe Replacement 3e Describe the overall project in detail, including the type of equipment to be used The Existing Timber Bridge will be replaced with 2@95x67"x40' CAAP with Headwalls Excavators,Dump Trucks,and Crane Trucks 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes XNo ? Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination, what type El Preliminary ? Final of determination was made? N/A 4c If yes, who delineated the jurisdictional areas? Agency/Consultant Company Name (if known) Other NCDOT and NCDWQ 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5. Project History 5a Have permits or certifications been requested or obtained for ? Yes XNo ? Unknown this project (including all prior phases) in the past? 5b if yes, explain in detail according to "help file" instructions 6. Future Project Plans 6a Is this a phased project? ? Yes XNo 6b If yes, explain Page 3 of 11 PCN Form - Version 1 3 December 10, 2008 Version C. Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) XWetlands XStreams - tributaries X Buffers XOpen Waters ? Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? PEI T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0 2h Comments 3. Stream Impacts if there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (1) (INT)? other) (feet) feet) S1 X P ? T X PER ? INT ? Corps X DWQ 20' 45' S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? PEI T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h Total stream and tributary impacts Acres 31 Comments Page 4 of 11 PCN Form - Version 1 3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individual) list all open water impacts below 4a Open water impact number - Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f Total open water impacts 00 4g Comments 5. Pond or Lake Constniction N/A If pond or lake construction proposed, then complete the chart below 5a Pond ID 5b Proposed use or purpose 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 00 5g Comments 5h Is a dam high hazard permit required ? Yes ? No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction Page 5of11 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If an impacts require mitigation, then you MUST fill out Section D of this form 6a XNeuse ? Tar-Pamlico ? Other Project is in which protected basin? ? Catawba ? Randleman 6b 6c 6d 6e 6f 6g Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? Pipe B1 X P ? T Installat Grape Creek ? Yes 2,400 1 600 ion X No , B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h Total buffer impacts 2,400 1,600 61 Comments Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project No 404 Wetlands are Filled Grape Creek is not an Anadromous Fish Location lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Slopes will be Vegetated instead of Rip Rap for Slope Stabilization and Protection 2. Compensatory Mitigation for Impacts to Waters of the U S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ? Yes XNo 2b If yes, mitigation is required by (check all that apply) ? DWQ ? Corps 2c If yes, which mitigation option will be used for this project? ? Mitigation bank El Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank N/A 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4. Complete if Making a Payment to In-lieu Fee Program NIA 4a Approval letter from in-lieu fee program is attached ? Yes 4b. Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ? warm ? cool ?cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non-riparian wetland mitigation requested acres 49 Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan N/A Elf using a permittee responsible mitigation plan, provide a descnpbon of the proposed mitigation plan Page 7 of 11 PCN Form - Version 1 3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ N/A 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes X No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required- I 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund) 6h Comments Page 8 of 11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a Does the project include or is it adjacent to protected riparian buffers identified XYes ? No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why ? Yes XNo Comments Existing Side Ditches are not Relocated 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 05% 2b Does this project require a Stormwater Management Plan? ? Yes XNo 2c If this project DOES NOT require a Stormwater Management Plan, explain why Existing Roadside Ditches Will not be Relocated 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ? Cerhfied Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review NIA 3a In which local governments junsdiction is this protect? NIA ? Phase 11 3b Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply) ? Water Supply Watershed ? Other 3c Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review N/A ? Coastal counties 4a Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply) ? Session Law 2006-246 ? Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review NIA 5a Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page;9 of 11 ° PCN Form - Version 1 3 December 10, 2008 Version F. Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? lb If you answered `yes" to the above, does the protect require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter ) ? Yes ? No Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after-the-fact permit application? ? Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violabon(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility NIA Page 10 of 11 PCN Form - Version 1 3 December 10, 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? El Raleigh 5c If yes, indicate the USFWS Field Office you have contacted ? Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? North carolina Wildlife resources Commission 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? North carolina Wildlife Resources Commission 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation (l Yes ® No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? North Carolina State Historic Preservation Office 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b If yes, explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? NC Flood Mapping Jay B Johnson January 20, (344mv tA&A,-- 2009 Applicant/Agent's Printed Name A ica is Signature ' Date (Agent s signature i v lid onl a uthor¢ation letter from the applicant is provided Page 11 of 11 _ a Bridge I & A Form 10 (86) F PROMPT ACTION Bridge No 240£ t ? Revised 313012000 NOTICE County ?cIAVEN! _ North Carolina Department of Transportation Bridge Inspection & Analysis Route "? Division of Highways Bridge Maintenance Unit NHS, 0 BrOge Inspection Team Leader `BG'LITTE TON, JR., _ _ r Date ' Ir2151200$ Y` Assisted By PCJ?tPQC,6C F _._ _ MEMORANDUM TO BRAD PRICE?? ???-? Badge Maintenance Supervisor A condition inspection of the subject bridge was made 92%412{}Q8 It is recommended that the conditions listed below be given prompt attention An electronic notice of this memorandum Is furnished for your use Please send an electronic notice of the action taken as a result of these recommendations to the State Bridge Maintenance Engineer and one to your Superintendent Retain one copy for your files CODE PROMPT ACTION PHOTOGRAPH TF 2 DECK BOARD #2 OUT FROM EBT 1 ? IS BROKEN THRU AT BAY 1 DUE TO - - NAILERS DECAYED AND/OR MISSING OVER BEAMS 1 & 2. .- t ..... ._ 1 .r . N REPAIRS By Bridge Maintenance Supervisor Date COMPLETE Action Taken : L VIIILL NOT CO RECOMMENDED By Division Bridge Maintenance Engineer WORK AT THIS TIME Date Distribution Bridge Maintenance Supervisor Original and 2 Copies - Division Bridge Maintenance Engineer 1 60 py Dmsion Engineer 1 Co Central Bridge Maintenance Office 1 Copy BRIDGE INSPECTOR'S RECOMMENDATIONS FOR MAINTENANCE REPAIRS Bndge 2$0119 CountyGRA??NEN> Date 'i2-64$ These Repairs Should Be Made Within Twelve Months From The Date Of This Inspection. Function Description of Unit Quanity Remarks Est Code Function cost 552 COMPLETE CLEAN SF 400 THE BEAMS ARE CORRODED WITH PAINT PEELING & PAINTING OF & MISSING STRUCTURAL STEEL ' 580 MAINT OF TIMBER MH 200 THE BULKHEADS @ END BENTS 1 & 2 HAVE BOARDS SUBSTRUCTURE WITH 100%a DECAY WITH FILL LEAKAGE. (I - ''^T ACTION) THE BULKHEADS ARE DECAYED WITH GAPS ALLOWING FILL LEAKAGE. THE WINGWALL BOARDS ARE DECAYED ANDIOR MISSING AT END BENTS 1 & 2 ALLOWING EROSION OF FILL THE RT END OF END BENT 1 CAP IS DECAYED. DEBRIS ON TOP OF CAPS. P-0 @ END BENT 1 IS DECAYED. P-2 @ END BENT 2 IS DECAYED. P-4 @ END BENT 2 HAS NUMEROUS VERTICAL FACIAL CRACKS TO 1!4" WIDE & DELAMINATION, FULL HEIGHT. 581 REPAIRS @ TIMBER MH 200 DECK BOARD #2 FROM END BENT 1 IS BROKEN THRU BRIDGE FLOORS AT BAY 1 @! NW CORNER (PROMPT ACT'-ON) NAILER DECAYED OVER B-1 @ END BENT 9 (PIA) NAILER DECAYED OVER B,2 @ END BENTS 1 & 2 (PIA) NAILER DECAYED OVER B-5 @ END BENT 1 (PIA) NAILER DECAYED OVER B-7 @ END BENT 1 (PIA) NAIILER DECAYED OVER B-8 @ END BENTS 1 & 2 WIA) NAILER DECAYED OVER B-9 @ END BENT 2 (PIA) NAILER DECAYED OVER B-10 @ THREE (3) LOCATIONS ALONG FULL LENGTH. (PROMPT ACTION) (PIA) = PROS "0T ACTION 578 GENERAL MAINT OF MH 50 BEAM #10 HAS REDUCED FLANGE WITH SECTION SUPERSTRUCTURE LOSS & PITTING ALONG FULL LENGTH Revised 614197 State of North Carolina Dept of Transportation Division of Highways Team Leader BG LITTLETON, JR. Assisted By PDI Item No. I Grade" FIELD INSPECTION REPORT Bridge Inspecion & Analysis 10 5 (STEEL BEAMS) BEAM #10 IS CORRODED WITH FLANGE REDUCED TO 1/16" & PITTED AREA IS 7 1/2' BACK FROM END BENT 2 (PHOTO) B-10 IS PITTED TO 1116" ALONG BOTTOM FLANGE OTHER BEAMS ARE SIMILAR (PHOTO) PAINT IS PEELING WITH SURFACE CORROSION AT WEBS THRU OUT (PHOTO) 16 6 (DRAINAGE) DRAINAGE THRU DECK BOARD GAPS 52 6 (PAINT) THE PAINT IS PEELING WITH SURFACE CORROSION NOTED AT THE WEBS & FLANGES OF STEEL BEAM #8 ALL OTHERS ARE SIMILAR (PHOTO) 35a 5 (TIMBER CAPS) FILL LEAKAGE THRU BULKHEAD & GAPS IN DECK BOARDS IS CAUSING BUILD UP ON END BENT 1 CAP IN BAY 5 SIMILAR AT ALL BAYS AT END BENTS 1 & 2 (PHOTO) THE RT END OF END BENT 1 CAP IS DECAYED TO 6" WIDE X 6" HIGH X 7" LONG INTO END (PHOTO) 35b 5 (TIMBER PILES) P-4 @ END BENT 1 IS DECAYED TO 1" DEEP X 360 DEGREES FROM THE GL UP 24" HIGH (PHOTO) P-2 @ END BENT 2 IS DECAYED WITH SECTION MISSING ON THE SOUTH FACE TO 12" WIDE X 20" HIGH X 1" DEEP (PHOTO) P-4 @ END BENT 2 HAVE NUMEROUS VERTICAL CRACKS TO 114" WITH DELAMINATION, FULL HEIGHT (PHOTO) 900? a Nvf, E0id 2,98 ON n. a Cti £1•SI 6802/2T/TQ Li-i N 0 w N Ile O Y 11 N i W O n , m O n o M N t- ?O 00 c" v 01 W N O O m I w li g t ;n 2 I- Z z o a r z v > M ? I ? NO N ,I` W o o I- oo'?U 0 ?Wl= tj w a r U MQ ° W d m t Q p U LECE r) D V +• = tY O Z t V t a O I (,) OC (Y X M U Z (D 2 DO V n W 0 o 1 ., Q vzi I I ti 3 Q w o M 7-Z N? > c) U t- n°. N V) ? C ? Q dZp fl- o z LLJ W W W (r cV TWO N V) :t? >_ N ?p bL?iti1 UQ Z jW j mN N N m N Lu O OU a t+- m r jU 2 ,? v V N t a) t t c? m W w cr O v °Q N Y ? Q U 0 c0 Z N u O - Lit O UD {.. w or U ov) uL . W ?J wn?w odrZO 00 W `"o t ? ? ? ?? O W as QU o<:2 a Z W LL m M w?9IS ? ? b W C5 U_ v a C,4 0. N t to U M cr lO a 0 w 4 . O t `n a " to J O yF-F- Q U t? 1`?l Z Q N mm U S ° Z(nZ N n Q K w W a s iru> (3 in "' b W? of M co °m co W Q o m aa ? (L-0 O Q cn < tn Li 4 ? a. 4 m? 20? U Ln Ld ,1 Q mm ? 4 i I a A HN (If co Z) Ln --- pp Z a O(\j ? + U pn t O ??OO Z U q p LL O ? + Y ? tiZO'jQ LL t cr_ - MOOZa d o N O w ZN O v d o t to w l.t. w OI ~ qO Z N 0 ? b IL M O MQLn ? w aJ ?° ° ' w a - z W 1Au?o MdN Q"zmx o t i w i5 ?Z a Kl ON t a - w tt tow " aNF-3N t 7 a w I Q " N W M U M tnt-3N d1 U j0 >_ °D ¢C) N a I a o W _ ?a?t- °z t- J X lp a? a ^, ? a d o a agca U N N - N co m +? W +) V CO `" W CO C7 ( W °? O O O?? ? N t7 I,j X n U W 41 b ° N 1-- Y ? ? > f- b?z a Q, ?N ?c r ?4r > J_ N ?p m Q a ? ? Q V CZ ty O U Q ' ?? V1? - ``? - O + O W O } 2 f? J F. L, LL ___.--- 0 t t X ° ? } L, I LL L C) Z M z j Z I Q U 2= 'a v to v Ln to cV dL ?tT m ? l4 O x 4 Q p d ` N Z?Q V)zQW k p EU` } 00 NO00 O00 Q ?QO Q00 w Q N NQ J = J W _ Lt7 W Q O ? Q O W ? ?! ? y U' 3 V 2 2 Q (/) O ?? `? tt n tt `D tt N Q, to t ?R10 o NRD 83 ` o LO c? x= U D] m p RJ J In O t? 2 a d J 2 a W2 m ? W ti ",n n n" w o 4 en f to F F N kn to W r' I I- x z g vi Sri ~ N o o ? o W ?? W a O o O W p= W I.r? ?4 O ? ? ? ° N '- "' ?a (am", UWJ C? u aua'-'ava?--v Q d 0 -< U ' W 00 -0 = D t= W ? ? W a 47 N ? ti a . L . C, ? O a - 27 - o W--? ? m th U QOUN S Ir V W O F? W ~ ?2OW :2 o NN-N-N-N-N? m o jmmC o? J4.W1 co O q 13f M xo mm > 0 X 3 0 ° LLJ W W ti ( L O IN o a a a a ? u' P d W q, vv 77 ??? ZQ a a a a Bridge TO Pipe Replacement, Craven 119, SR 1237,I3eat Swamp Road over Grape Creek Craven County with 2@ 95"x67"x40' CARP Erosion Control Schedule • Install erosion/sediment control measures according to plans. • Grading of slopes; 1.5: 1= stabilize with Class B riprap • Seed all disturbed areas as soon as final grading is completed. • Clean out and/or rework all temporary sediment control measures after significant rainfall event (or as otherwise needed). These measures should be maintained until a permanent vegetative cover is established and project is complete Pipe Installation Schedule • Install erosion/sediment control devices per plans. • Remove material while limiting, as much as possible, material and sediment from entering the stream and/or escaping from the project. • Prepare pipe foundation while taking care to limit material and sediment from entering the stream and/or escaping from the protect. Where possible new grade should be below the existing streambed. Bedding material will be washed stone. • Place new pipe and compact fill. • Install slope protection on outlet and inlet ends of pipe (Class B Granite riprap) • Establish permanent vegetation as soon as possible • Remove sediment control devices after project has stabilized and permanent vegetative cover is established. Bridge I&A Form 1(82)H FIELD INSPECTION REPORT State of North Carolina Dept of Transportation Brifte Inspecion & Analysis Division of Highways Team Leader BG LITTLETON, JR. Assisted By PDI Item No Grade 35c 4 (TIMBER BULKHEADSIWINGS) BULKHEAD BOARD #5 BELOW END BENT 1 CAP IS DECAYED TO 100% WITH FILL LEAKAGE FROM P-1 TO 3' RT OF P-3 (PROMPT ACTION) (PHOTO) BULKHEAD BOARD #2 UP FROM GL IS 100% DECAYED WITH FILL LEAKAGE AT END BENT 1 FROM P-3 RT 3' (PROMPT ACTION) THREE (3) BULKHEAD BOARDS ARE 100% DECAYED & MISSING AT THE RT EXTERIOR SIDE OF EB 1, SW CORNER WITH FILL LEAKAGE (PROMPT ACTION) (PHOTO) BULKHEAD BOARD #4 UNDER END BENT 2 CAP IS 100% DECAYED WITH FILL LEAKAGE FROM 2' LT OF P-2 TO 3' LT OF P-4 (PROMPT ACTION) (PHOTO) BULKHEAD BOARDS #2 & #5 ABOVE GL AT END BENT 2 ARE 100% DECAYED WITH FILL LEAKAGE BETWEEN P-3 & P-4 (PROMPT ACTION) (PHOTO) THE RT EXTERIOR BULKHEAD AT END BENT 2 HAS SEVERAL BOARDS WITH 100% DECAY ALLOWING FILL LEAKAGE AT THE SE CORNER (PROMPT ACTION) (PHOTO) THE NE WINGWALL BOARDS ARE DECAYED (PHOTO) THE NE EXTERIOR BULKHEAD BOARDS ARE DECAYED (PHOTO) THE NW EXTERIOR BULKHEAD & WINGWALL HAVE DECAYED BOARDS WITH GAPS ALLOWING FILL LEAKAGE (PHOTO) THE TOP WINGWALL BOARD IS MISSING AT SW CORNER (PHOTO) THE SE WINGWALL AT END BENT 2 HAS DECAYED BOARDS WITH BOARDS MISSING (PHOTO) 50 6 (APPROACH RDWY) WEST APPROACH IS SOIL EAST IS SIMILAR (PHOTO) 54 6 (RESPONSE TO LIVE LOAD) THERE IS A MODERATE AMOUNT OF FLEXING IN THE TIMBER DECK DUE TO DECAYED NAILERS 61 YES (PROMPT ACTION) ISSUED FOR DECK, NAILERS & BULKHEADS 62 YES (PRESENT POSTING) SV-11, TTST-17 TONS ACME Mapper 2 0 - 2 0 km NxNE of Great Dover Swamp NC Page 1 of 1 N ,.. r k ? '?8 ? A Y f1w L+ s } t µs ? t? a p . w L qj p - a t t ?q c t w U 1JV? f? ? y?t {[f^?" 1 Y l ,w n k t $ ?}Lsli}t $V1%}q'1?i SCI t A t A? F 5 " x r ' , 1 r 49 ? ? ^ ye dl Y t 1 Al?? ? ? i 4L4 h^ YeX ? ? ?ZU p : _t 'a xb x i'w. ,. q - . Y?? v Y ? kt « r l ° y f " ' rT? `°it4 3 Y r ?f x _ t ,e x ? ., ? x x ? e 'v c .n. try ? Y?'i v r ? ? ¢ ? .. i} - r „ ? , r F?Y t ?x ate Map data 02MB Tete Atlas - s arms of Usp http Hmapper acme coml 12/512008 cc State Bridge Maintenance Engineer Bridge Maintenance Superintendent File Bridge I & A Form 10 (86) F PROMPT ACTION Bridge No, h ,,240T'1?9, ' Revised 611311997 NOTICE CONTINUED County cRa?vEni ` ;.'` Department of Transportation Bridge Inspection &. Analysis Route SR 1237 Division of Highways Bridge Maintenance Unit Bridge Inspection CODE PROMPT ACTION PHOTOGRAPH 7' 1 THE TIMBER BULKHEADS AT END TBH 44 BENTS=14 2 HAVE BOARDS WITH 100% DECAY WITH VOIDS ALLOWING, ? ? FILL LEAKAGE BETWEEN PILES V thy' _??? . Y: ? XT' EXTERIOR PORTIONS OF WAL LSz rd?, ` BO J4RD#S,BELO,W END+BENTG11)GAP WITH 160% DEGAYI VOID ALLOWING° ' , , FILL LEAKAGEz,UTHERS,ARE,< SIMILAR AT END;BENT 1 BULKMEADi ? , - - - s t , , ? a a r s s / CODE PROMPT ACTION! PHOTOGRAPH BOARD #4 BELOW END BENT 2,CAP . ' WITH 100% DEQAY/VOID'ALLO.WING; i FILL LEAKAGE. QTHER3'ARE g , S A I d R SIMILAR-AT END BENT 2,,BULKHEAb a n0. 3 n .• M1x ' _ 2 + _ ' n n f i of ; g x f 3 3:i ,: . V . V Y _x aF r 5 ra^'n '2 t i t .`. „t au ym J-5 h 4 JJ`t fC I ti t v Yx J.z "? -- - - ? fl??Q a a e a> ??a 4e1? I o ? n A m r m aw ? s ? A 4 v ? ? z pll g m Yt ? "°a z ? in r m -I C y n N IE h°fE z ('i'? SNOUI. DEq P." \ -TI V) t- _ _ EDGE OF PgyEMENT m EDGE OF PAVEMENT v rn n o ? ~ ? n /./? D m VJ m r O OZ n m r I r g ?1 m C r --4 A _ -`?i BBD gg 3 ? z A ? FJ TI 4.J ? ` ? E N r Vf I N ' ? fl5 ? ? Z o D $ b e l$ ?? m m a p m o .? y ~ m .1 3 m z V rr-i. D 3] n Q p y r m % - t n o ? A y N ? O e m N A N y ti X Z T .?{ N C r ° r • ? T D .mv ?r1 A ? r • e O ?IC N 0 to II O?n 9 F- m -m =m m ? ° n $ O o mg moo x? o x m n a x A v' ?"' m co 5z -?-I pp z C 1 p y -I C= D O N O V) ( m <1 Q nm 4 o O b ®?* © 9 O n-1 Tl m r D > m O p p K b A n m a fm~" Cp'1 o S C) p I- z an -. m s m g N Z m c C-) - n m a A K a A m v p 0 K- m N I' Z A z ti m z o m ni ~ ? ~ C rn ? m m v c N °m Z Co a rn m Q n m D as PROPOSED BRIDCF_ 10 PIPE REPLACEMENT CRAVEN 119 SR 12-7h'EATN SWAMP ROAD OVER GRAPE t rtEEK PROJECT NUMBER 2h 2025 1 ! COUNTY CRAVEN DATE 01-20-09 CRAVEN 119 EXISTING TIMBER BRIDGE 2X' )LONG W m z =U DOWNSTREAM PROFILE PROPOSED 20 95" x 67" x 40' CARP WITH HEADWALLS TOP OF AWS (CROWN OF ROADWAY) --? ----- ------ ---- ------ -' UNDERCL ARANCE ---?; <r Co 18 0 W N?NL?-? in N z ca Q z Ll.J SR 1237 --- ------- I 18? Lu DRAWING IS NOT TO SC,klE L 18, cc State Bridge Maintenance Engineer Bridge Maintenance Superintendent File Bridge I & A Form 10 (86) F PROMP T ACTION Bridge No' 24490 11 Revised 611311997 NOTICE CONTINUED county cRaVE[V'r'°° r 7? ? . F Department of Transportation Bridge Insp ection & Analysis Route SR 1237 't Division of Highways I , r Bridge Maintenance Unit tinage inspection CODE PROMPT ACTION PHOTOGRAPH 7N,1'11'1111 (7} TIMBER NAIL.ERS ARE DECAYED 1 ANDIOR MISSING SECTIONS OVER ;STEE&EfEAMS #1, 2, 5, 7, .8, 9 & 1't)_ a 4 ,! ; n DECAYED & MISSING. POR710,14S ,v t r VARY IN LENGTH= FROM,24" 7h047' LONG`. r NAILER OVER BEAM=1' @&EBT END: ? - r , t ?`: -• A 1, - M t ? ` i'S`t ? ? • ? i ' y a , ? `?fM * ?, d £ e? of `„ x , x ? r ? r f `y< '{F, 14 ? irk„ ,r - - nt x ` CODE PROMPT ACTION PHOTOGRAPH n k s n n ,+ t ` } E NAILER -OVER BEAM 10 @sMl®- t 9? r'a (Y "Y - ?' ? F ?';..i ? 1? iaSVi?K -Ss? '-? %?, isL ? t 7T aJ i PORTION r ?? .m ?Y x, s Z* w.x 'i i NaTE,,,PHOTOS OF REMAINING DECAY EQrNA1LERS ARE SIMILAR: Bndge MA Form 1(82)H FIELD INSPECTION REPORT State of Forth Carolina Dept of Transportation Bridge Inspecion & Analysis Division of Highways Team Leader BG LITTLETON, JR Assisted By PDI T Item No Grade 2b 4 (TIMBER DECK & NAILERS) DECK BOARD #2 OVER END BENT 1 BROKEN THRU IN BAY #1 DUE TO DECAYED & MISSING NAILERS OVER BEAMS 1 & 2 (PROMPT ACTION) (PHOTO) NAILER OVER B-1 DECAYED & MISSING FROM END OVER EB 1 OUT 30" (PROMPT ACTION) (PHOTO) NAILER OVER B-2 DECAYED & MISSING FROM END OVER EB 1 OUT 30" (PROMPT ACTION) (PHOTO) NAILER OVER B-2 DECAYED & MISSING FROM END OVER EB 2 BACK 25" LONG (PROMPT ACTION) (PHOTO) NAILER OVER B-5 DECAYED & MISSING FROM END OVER EB 1 OUT 30" (PROMPT ACTION) (PHOTO) NAILER OVER B-7 DECAYED WITH PORTIONS MISSING FROM END OVER EB 1 OUT 70" (PROMPT ACTION) (PHOTO) NAILER OVER B-8 DECAYED WITH PORTIONS MISSING FROM END OVER EB 1 OUT 30" (PROMPT ACTION) (PHOTO) NAILER OVER B-8 DECAYED WITH PORTIONS MISSING FROM END OVER EB 2 BACK 72" LONG (PROMPT ACTION) (PHOTO) NAILER OVER B-9 DECAYED & MISSING FROM END OVER EB 2 BACK 24" LONG (PROMPT ACTION) (PHOTO) NAILER OVER B-10 DECAYED & MISSING FROM END OVER EB 1 OUT 30" (PROMPT ACTION) (PHOTO) NAILER OVER BA 0 IS DECAYED 24" LONG BEGINNING 52" OUT FROM EB 1 WITH PORTIONS MISSING (PROMPT ACTION) (PHOTO) NAILER OVER B-10 IS DECAYED 62" LONG BEGINNING 96" OUT FROM EB 1 WITH PORTIONS MISSING (PROMPT ACTION) (PHOTO) DECK BOARDS 1 & 2 HAVE GRADER DAMAGE AT THE NW CORNER (PHOTO) DECK BOARDS ARE WEATHERED WITH GAPS FEW HAVE BEEN REPLACED (PHOTO) PORTIONS OF NAILERS HAVE BEEN REPLACED AT RANDOM SECTIONS 3b 7 (TIMBER RAILS) NEW 4 7 (WHEELGUARDS) NEW z a Q j CL- m cr- ISM o (? o z A U ? [T] Z ? z ------ Cr_ O O p ? LL- Q g - N ? I U- LQ Z `tr C' ;?_ ? 4 I? W p O W o ;g w~o ?? W ---- - - Z J 3 J O Q? N Z O Q d n J IZ. L ? S N J O In U W C? W ? ??? W vWiw O Z <c W c "? W W W O ?p W U J? ?? ?° W a O z zCC Z ?N ?p W ? O j U Qom. j s Z? 2? LL- ? RE Craven 119 txt From Travis Wilson [travis wilson@ncwildlife org] sent Thursday, December 18, 2008 11 17 AM To Sutton, Michael W Subject RE Craven 119 WRC does not request a moratorium for this project Travis W Wilson Eastern Region Highway Project Coordinator Habitat Conservation Program NC Wildlife Resources Commission 1142 I-85 service Rd Creedmoor, NC 27522 Phone 919-528-9886 ext 226 Fax* 919-528-9839 Travis Wilson@ncwildlife org -----Original Message----- From Sutton, Michael W [mailto msutton@ncdot gov] Sent Friday, December 12, 2008 4 07 PM To Wilson, Travis, Johnson, Jay B subject Craven 119 Travis Division 2 plans on replacing craven 119 with 2@95"x67" Pipes we would like to know if Grape creek has a moratorium A quad map is attached for your use Thanks mike Page 1