Loading...
HomeMy WebLinkAbout20170285 Ver 1_Design/Maps/Site Plans Revised_20171122- TOP OF BANK TYP \ X` tiY _ _ \\�� \ \ ( )' LIMITS OF DISTURBANCE (TYP.) ELAN _ a J° - - � `\ it ` z: -; %S O Q EXTENT OF u = \ - V N /� Y �',:` EXISTING WETLAND ` \•` �. y GRAPHIC Si AU; I RJrH = 10 Rini' � . y �/_ . � .� ✓• — �• •- � — ..,.� .� -. _ \ �'. / -1 o / / — ��i �'�►.._ '\ • '\ /�. LOG GRADE CONTROL 2 �'.� ;�•'f \\� V) Z d (PROVIDED BY OWNER, NOT �'� / ,r.�i; Q --l r ,tib �� IN CONTRACT) / W le. r ' .TEMPORARY CONSTRUCTION \ - ( ACCESS i (PROVIDED BY OWNER, NOT IN 'CONTRACT)`' i v - 25 .FT TROUT,'BUFFER• (TYP) LOG GRADE; CONTROL .(11 ' - + O •, (PROVIDED BY OWNER NOT IN CONTRACT) 1 % / i CROS SECTION (SEE SHEET -C-104) EXISTING 24' 'CMP CULVERT \ 4 „ Z y. INV.. IN: 3139.48 TO BE ABANDONED BORE Ea JACK 118 LF OF 4e -STEEL CASING. PIPE .® 3:5R zw Q INV"IN. 3141.70 LL® U INV OUT -.3137.54 y I— _ 0 co EXISTING 24' •CMP CULVERT TO REMAINQ 0 ACTIVE DURING CONSTRUCTION. ONCE ` may.~" 'Z PROPOSED' 48' CULVERT INSTALLATION fn LL AND STREAM RESTORATION IS COMPLETE _ /� , ;•,. / � � -' ��� TEMPORARY CONSTRUCTION > Z EXISTING 24 CMP TO BE ABANDONED ' _ _ ACCESS 2 (PROVIDED BY PLACE BY PUMPING FLOWABLE FILL OWNER NOT IN CONTRACT) O Z AND SEALING INLET AND OUTLET. "' Q D (PROVIDED BY OWNER, NOT IN CONTRACT) W , O IJ A %i { '• r ROPOSED 48" STEEL ENCASEMENT. PIPE.- m m N'Oo m z z ' / EXISTING; 24" CMP ROPOSED OUTLET PROTECTION GRADE r / TO,BE ABANDONED IN PLACE CONTROL BOULDERS INSTALLED AT 3140.37•. Z a' •,,�1 \ '� .,(PROVIDED BY OWNER, NOT IN CONTRACT) _ PROPOSED CLASS- I RIPRAP. OUTLET PROTECTION' 15' LONG x 6 'WIDE x 24' THICK -HATH �, ROPOSED OUTLET PROTECTION BOULDER WALL MIRAFI 140 N FILTER FABRIC. UNDERLAYMENT L (PROVIDED BY OWNER, NOT IN CONTRACT) Q (PROVIDm BY OWNER, NOT IN CONTRACT) ROPOSEDL OUTLET PROTECTION FOOTER BOULDERS (PROVIDED BY OWN ER. NOT IN CONTRACT) Z PROPOSED OUTLET s S Fr \ EXTENT OF wLIJ J -PROTECTION BOULDER WALL `J\ S EXISTING WETLAND CL ' NOTES ON ERODED STREAM- ' BANK � y, .., r, ✓ •� - .EXCESS (PROVIDED BY OWNER, NOT IN SEDIMENTS FROM STREAM RESTORATION � - CONTRACT -� t � '� -� - \ ' N!111 BE HAULED OFFSITE FOR, PROPER 'DISPOSAL. .• _Lu 6-D Know•what'rbe'OW. 1NOTE. UTILIZE PUMP AROUND DURING'8a. bgfore.you'dig. STREAM RESTORATION: ABANDON EXISTING NTC.OneCallCent24' CMP CULVERT UPON COMPLETION OF STREAM RESTORATIONr PROVIDED Bia1181,1 or1=800.632.4949' �' ( . �. 'OWNER, NOT IN CONTRACT)- SHEET _ TOTAL LIMITS OF DISTURBANCE: 0.14 ACRES - n -T f-1 'A .n -7-" r -N r-\ A , A 11 • i Shadowline Pipe Existing Profile 3155 3153 4 3151 3149 3147 3145 3143 3139 3137 3135 0 20 40 60 80 �2. Is, -� WIMIJ 120 160 'T CROSS SECTION — UPSTREAM RESTORATION =3150 i alas- ---- - --- - _ ` - - - -- _ _ �� - - --- -. - - -- - --. - - ----- ---I 3148 • -3147 t L ---...-'. --..- -- -- --'- - -- - -. - -- • i � E70STING SURFACE , 3146,. BAN*IAL — ---- COIR MAT, 31,45 31441.— PROPOSED GRADING 3143 1 1 1 + I — 1 — 31420 5 10 15 20 25 .30—"— 35 _ 40" 45 50 NOTE€ T APPLY TEMPORARY'EROSION CONTROL SEED MIX TO ALL:DIST.URBED,AREAS FOLLOWING GRADING. 2. STABILIZE°STREAM BANKSMIT,H COIR MATTING, APPLY NATIVE SEED MIX TO ENTIRE RESTORATION CORRIDOR. RECOMIVIEND'E-RNST CONSERVATION SEED3COMPANY", NC MOUNTAINS•RIPARIAN MIX (ERNMX' -304 OR APPROVED' ALTERNATIVE)., _ 3, COIR MA'T ING'SPECIFICATIOW BIODEGRADABLE COIR FIBER MAT'AT 400:GRAMS%SQ. METER WEIGHT; 1"NET'OPENING; MIN. LIGHT'PENE•TRATION 38%;+SHEAR STRESS:3 LBS./SQ. FT. PROFILE _ DOWNSTREAM :OUTLET PR'0.7ECTI:0N 3143 -PROPOSED NV OUT. 3130.34' + .-3142 - CdlMM SM aLv.. 3140.31 ---- -=— - -=--- - . I. 3141 �- ---- ----EASTING SURFACE', + i 3140 - ---- - = -,---._ - -_ .3139 _- ,_ - __ •..,------_- <- ,-�.-_ - -- -- ' 3137 -- - --- - - --- -- - --- ; ' _ 3136 =-. - - ----- '— - - - _ - - --- - '---'----- PROPO$D GRADE CONTROL BOULDERS 3134 -- AND CLASS'l I RIPRAP' _------------ ------ -_ --. --- - '-- —�- --- -- 3135 -----' PE -IN 70 ZOSTING PROPOSED.STREAM 80 STREAM SED _ 0 5 16 15 20 PRS _OUTLET PR07EMM Sim—a. riw CONSTRUCTION SEQUENCE: 1. INSTALL TEMPORARY STREAM DIVERSION PIPE UPSTREAM OF PROPOSED BOREPIT. BALLAST PIPE TO REDUCE SCOUR AND ENSURE STABILITY OF TEMPORARY'PIPE, ADD SANDBAGS AS. NECESSARY TO DIVER STREAM INTO TEMPORARY PIPE: ENSURE, W STREAM FLOW IS DIVERTED DURING ALL, PHASES OF WORK AND Q STREAM RESTORATION WORK (MAY REQUIRE RE PLACEMENT OF Z PIPE). O 7. INSTALL:48" CULVERT: 0 .3 COMPLETE SITE GRADINGAND'INSTAL`LATION OF'GRADE Z W Ci 0 U CONTROL STRUCTURES FOR STREAM RESTORATION':• > � 41 -APPLY TEMPORARY EROSION CONTROL SEED MIX TO:ALL. < . _ DISTURBED AREAS.FOLLOWING GRADING.–j Q S. STABILIZE STREAM BANKS WITH COIR MATTING APPLY NATIVE+. Z Z; SEED MIX. cn LL 6:,,ABANDON 24" CMP CULVERT WITH 'FLOWABLE FILL:AND CAP 3 Z ®'ZLLJ' _ }- BOTH, ENDS. 0 p p V Q � 0� ONTRACT, DRAWINGS. w w I a w9 2 > > u o <2 n Z Z a Z LL9 I L D (. N Z-� z 0 U 0 . Q 0 V Z, I— 0 0 ca z. Fz LLI Q U O .u1 LL1 J (n Q' :LL W.0 <Y SHEET C- 104