Loading...
HomeMy WebLinkAbout20171541 Ver 1_SF-730124_1st_Rd_comments_sealed_20171130IVCFMP and NCDOT MOA Project Review PROIECT INFORMATION Project TIP: Sch Let Date: CLOMR Case Number: Municipality: County:. CID Number: Project Engineer: Project Reviewer: MODEL STATUS SF-730124 1/10/2018 N/A N/A Pitt 370372 Craig A Freeman, PE Matthew Dudley, PE Stream Name: Route Number: Road Name on Panel: Effective FIS Date: Panel Number: Panel Effective Date: Bounding Stations: Type of Study (detailed, limited, redelineated): Limited Effective Model on File? YES Effective Model Format (HEC-RAS, HEC2, Other): HEC-RAS Proposed Model Format (HEC-RAS, HEC2, Other): HEC-RAS PROJECT SPECIFIC Nf3TES (pre-model review) 3.0.1 4.1.0 Biery Swamp SR 1550 Sheppard Mill Rd 7/7/2017 _ 5720 7/7/2014 062/037 This project has a maximum decrease of 0.0-ft and will be submitted as a MOA type 1. Please note that there are decreases of 0.3-ft at the upstream and downstream internal bridge sections, respectively, for the structure at 3989.1. REVIEW COMMENTS: None MINOR COMMENTS 1. Please consider extending the upstream tie in to RS 6244.9 to reflect a WSEL difference between the CE and RE plans of 0.00-ft. 2. Please verify that the submitted "Vicinity Map" is sufficient to be used as the "Title Sheet from Plans" which is a required aspect of the MOA submittal. • •�► u' N o ne \\\\���>>� � �iA �ti-i���yr 1��\ �� � . . , � �/ f j°y'+�yr FINAL DETERMINATION: `� � •' ��s��o�'�' '� � �'•� y•.-� _ A final determination will be made once the above comments have been addressed. ''O- SEAL �; i��� 1 d� .� � Matthew Dudlev, PE 8/10/2017 ���y� '4'(�a��.•'e�, r�* Name, Title Date ��'�i,�''i',� �J��'`fi r'����� i�1 � i�����`�\\��/0�/7