HomeMy WebLinkAbout20171541 Ver 1_SF-730124_1st_Rd_comments_sealed_20171130IVCFMP and NCDOT MOA Project Review
PROIECT INFORMATION
Project TIP:
Sch Let Date:
CLOMR Case Number:
Municipality:
County:.
CID Number:
Project Engineer:
Project Reviewer:
MODEL STATUS
SF-730124
1/10/2018
N/A
N/A
Pitt
370372
Craig A Freeman, PE
Matthew Dudley, PE
Stream Name:
Route Number:
Road Name on Panel:
Effective FIS Date:
Panel Number:
Panel Effective Date:
Bounding Stations:
Type of Study (detailed, limited, redelineated): Limited
Effective Model on File? YES
Effective Model Format (HEC-RAS, HEC2, Other): HEC-RAS
Proposed Model Format (HEC-RAS, HEC2, Other): HEC-RAS
PROJECT SPECIFIC Nf3TES (pre-model review)
3.0.1
4.1.0
Biery Swamp
SR 1550
Sheppard Mill Rd
7/7/2017 _
5720
7/7/2014
062/037
This project has a maximum decrease of 0.0-ft and will be submitted as a MOA type 1. Please note that
there are decreases of 0.3-ft at the upstream and downstream internal bridge sections, respectively, for
the structure at 3989.1.
REVIEW COMMENTS:
None
MINOR COMMENTS
1. Please consider extending the upstream tie in to RS 6244.9 to reflect a WSEL difference between
the CE and RE plans of 0.00-ft.
2. Please verify that the submitted "Vicinity Map" is sufficient to be used as the "Title Sheet from
Plans" which is a required aspect of the MOA submittal.
• •�► u'
N o ne \\\\���>>� � �iA �ti-i���yr
1��\ �� � . . , � �/ f j°y'+�yr
FINAL DETERMINATION: `� � •' ��s��o�'�' '�
� �'•� y•.-� _
A final determination will be made once the above comments have been addressed. ''O- SEAL �;
i��� 1 d� .� �
Matthew Dudlev, PE 8/10/2017 ���y� '4'(�a��.•'e�, r�*
Name, Title Date ��'�i,�''i',� �J��'`fi
r'����� i�1 � i�����`�\\��/0�/7