Loading...
HomeMy WebLinkAbout20171541 Ver 1_PCN Form Submission_20171130Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 11/30/2017 11:38:26 AM (Start Event) Accept by Carpenter,Kristi 11/30/2017 4:02:18 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: December 5, 2017 5:00 PM 11 /30/2017 11:39 AM �� � 6fvlslaa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) November 25, 2017 Ver 2.1 * Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are ans�red. Below is a link to the online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/603610/Page1.aspx A. Processing Information County(or Counties) where the project is located:* Pitt Is this project a public transportation project? (?) r Yes C' No Is this a NCDOT Project? C� Yes C' No (NCDOT only) T.I.P. or state project number: SF-730124 WBS # 17BP.2.R.79 (for NCDOT use only) 1a. Type(s) of approval sought from the Corps: ri Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? rJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 03 - Maintenance 1c. Type(s) of approval sought from the DWR:* check all that apply � 401 Water Quality Certification - Regular � Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express r% Riparian Buffer Authorization 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification For the record only for Corps Permit: * C' Yes C•' No C' Yes r No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from rritigation bank or in-lieu fee program C' Yes C•' No i 1f. Is the project located in anyof NCs twentycoastal counties?* C' Yes �' No 1h. Is the project located in a designated trout watershed?* C� No C' Yes Link to trout information: http://v�uwv.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* HeatherLane 1b. PrimaryContact Email:* hclane@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (252)439-2813 1d. Who is applying for the permit? I7 Owner r Applicant (other than owner) rJ AgenUConsultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: I North Carolina Department of Transportation 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d.Address Street Address 1037 W.H. Smith Blvd. Address Line 2 P.O. Box 1587 a� Greenville Fbstal / Zip Code 27835 2e. Telephone Number: (xxx)xxx-xxxx State / R-ovince / F�gion NC Country 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* jbjohnson@ncdot.gov 4. Agent/Consultant (if applicable) 4a. Name: Corey Cavalier 4b. Business Name: (if applicable) RK&K Engineers 4c. Address Street Address 900 Ridgefield Drive Address Line 2 Suite 350 a� Raleigh Fbstal / Zip Code 27609 4d. Telephone Number: (919)878-9560 (xxx)xxx-xxxx 4e. Fax Number: (xxx)xxx-xxxx 4f. Email Address:* ccavalier@rkk.com State / Rovince / I�gion NC Country AgentAuthorization Letter* Rease provide the Agent Authorization Letter if you are subrritting this document. 730124_AGENT AUTHORIZATION signed.pdf 236.88KB FlLE IYFE M 1ST BE FDF C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* � Replace Bridge #0124 on SR 1550 (Shepherd Mill Rd) over Briery Swamp 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Stokes 1d. Driving directions* If it is a new project and can not easily be found in a G� rrapping system Rease provide directions. From Greenville, NC, drive north on NC 903. Continue straight onto Beargrass Road. Turn right on SR 1550 (Shepherd Mill Rd) before reaching Tucker-Bullock Road. 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) wa 2b. Propertysize: (in acres) 0.97 2c. Project Address Street Address Address Line 2 �� F�stal / Zip Code State / Rovince / F�gion Country 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) � Latitude:* 35.69202 ex:34.208504 3. Surface Waters Longitude:* -77.20627 -77.796371 3a. Name of the nearest body of water to proposed project:* Briery Swamp 3b. Water Resources Classification of nearest receiving water:* C, Sw, NSW Surface Water Lookup 3c. What river basin(s) is your project located in?* Tar-Pamlico RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Substandard bridge to be replaced in a rural area. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) aick the upload button or drag and drop files here to attach docurrent 730124_USGS Map.pdf 596.6KB Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent 730124_Soil_Report.pdf 815.91 KB Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 0.13 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 80 4f. Explain the purpose of the proposed project: i Replace e�asting 91'-5" six span bridge. The bridge will be replaced with a 100' two-span bridge at the existing location. 4g. Describe the overall project in detail, including the type of equipment to be used: Offsite detour. Existing bridge to be removed from wetlands & TOB. Turbidity curtain to be used during removal. Cranes, track hoes, bulldozers, excavators, and various hand tools will be used for construction and removal. 4h. Please upload project drawings for the proposed project. aick the upload button or drag and drop files here to attach docurrent 730124 - 90% Roadway Plans.pdf 3.69M6 730124_UT_UBO_FINAL.pdf 343.87KB Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* C� Yes C' No �' Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? * r Preliminary c' Approved C' Unknown C' N/A Corps AID Number: Exarrple: SAV�2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Hal Bain RK&K Engineers 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Corps of Engineers (Tom Steffens) and NCDEQ (Garcy Ward) site visit was made 8/22/17, but official determination has not been issued. The delineation and determination, however, was verbally accepted. 5d1. Jurisdictional determination upload C7ick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes r No �' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes �' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. No D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): fJ Wetlands r Streams-tributaries fJ Buffers � Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site # - Reason for impact * i Site 1 N�p label (e.g. I�ad Q'ossing 1) Site 1 N�p label (e.g. F�ad Qossing 1) Site 1 N�p label (e.g. F�ad Q-ossing 1) Site 1 N�p label (e.g. Id�ad Qossirig 1) Site 1 N�p label (e.g. 13�ad CXossing 1) Site 1 N�p label (e.g. Fd�ad Qossing 1) Site 1 N�p label (e.g. Fd�ad Qossing 1) Site 1 N�p label (e.g. 13�ad CYossing 1) 2b. Impact type * 2c. Type of wetland * 2d. Wetland name * 2e. 2f. 2g. Impact Forested* Jurisdiction area* type * P Riverine Swamp Forest W1 Yes Both 0.006 F2rrrenent (F) or Terrporary (404, 10) or C7JVR (acres) (� (401, other) T Riverine Swamp Forest W1 Yes Both 0.030 F�rrranent (P� or Terrporary (404, 10) or C7�NR (acres) (� (401, other) P Riverine Swamp Forest W2 Yes Both 0.004 F�rrranent (Fj or Terrporary (404, 10) or d�NR (acres) (� (401, other) T Riverine Swamp Forest W2 Yes Both 0.020 F2rrranent (P� or Terrporary (404, 10) or CNVR (acres) (� (401, other) P Riverine Swamp Forest W3 Yes Both 0.010 F�rrranent (� or Terrporary (404, 10) or C7�NR (acres) (� (401, other) T Riverine Swamp Forest W3 Yes Both 0.020 F�rrranent (P� or Terrporary (404, 10) or C�NR (acres) (� (401, other) P Riverine Swamp Forest W4 Yes Both 0.020 F2rrranent (P� or Terrporary (404, 10) or CMR (acres) (� (401, other) T Riverine Swamp Forest W4 Yes Both 0.020 F�rrranent (� or Terrporary (404, 10) or C7JVR (acres) (� (401, other) 2g. Total Temporary Wetland Impact 0.090 2g. Total Permanent Wetland Impact 0.040 2g. Total Wetland Impact 0.130 2h. Comments: 0.02 ac fill, 0.02 ac mechanized clearing, 0.09 ac hand clearing 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. "" All Perennial or Intermittent streams must be verified by DWR or delegated local government. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. � 5. Pond or Lake Construction If pond or lake construction is proposed, then complete the chart below. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)?* Check all that apply. r Neuse �J Tar-Pamlico r Catawba r Randleman � Goose Creek r Jordan Lake � Other 6b. Impact Type * 6c. Per or 6d. Stream name * Te mp * 61,Allowable P BrierySwamp Location and Exerrpt, Allowable, allowable w/ rritigation F�rrranent (Fj or Terrporary (� 62, Allowable P BrierySwamp Location and 6cerrpt, Allowable, allowable w/ rritigation F�rrranent (� or Terrporary (� B3,Allowable P BrierySwamp Location and Exerrpt, Allowable, allowable w/ rritigation F�rrrenent (� or Terrporary (� 64,Allowable P BrierySwamp Location and 6cerrpt, Allowable, allowable w/ rritigation F�rrranent (Fj or Terrporary (� 6h. Total buffer impacts: Temporary impacts Permanent impacts: Total buffer impacts Zone 1 0.00 Zone 1 1,831.00 Zone 1 1,831.00 Zone 2 0.00 Zone 2 896.00 Zone 2 896.00 6e. Buffer 6f. Zone 1 6g. Zone 2 mitigation impact* impact* required?* No 395 174 (squarefeet) (squarefeet) No 556 223 (squarefeet) (squarefeet) No 501 434 (squarefeeq (squarefeet) No 379 65 (square feet) (square feet) 6i. Comments: 1806 sf Zone 1& 743 sf Zone 2 impacts are in wetlands. Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. Gick the upload button or drag and drop files here to attach docurrent 730124_permit_d rawi n g s_20171130. pdf Fle rrust be F�F E. Impact Justification and Mitigation 1. Avoidance and Minimization 3.88M6 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Bridge is replaced with fewer spans for less impact on stream channel and greater length to open hydraulic connection. Side slopes are as steep as possible (3:1) without implementing special stabilization measures. Sliver fills have been avoided. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* All appropriate BMPs wil be used during construction. Hand clearing will be utilized when able. Mechanized clearing is limited to as close to the toe of slope as possible through the use of NCDOT Method II (std. 200.02). , 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes C•' No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Wetlands and buffer impacts are belowthe minimum criteria threshold. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1a. Does this project require a Stormwater Management Plan? r Yes l" No 1b. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: i Please see attached SMP 1c. What is the overall percent imperviousness of this project? 41 % 1d. Who will be responsible for the review of the Stormwater Management Plan?* r Certified Local Government rJ DWR 401 & Buffer Permitting Branch 2. Diffuse Flow Plan r DEMLR Stormwater Review r DWR Transportation Permitting Branch 2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes l" No 2b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. Include a plan that fully documents how diffuse flow will be maintained. If, due to site constraints, a BMP other than a level spreader is proposed, please provide a plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP Manual and attach a BMP Supplement Form What documentation are you providing? r Level Spreader �J Other BMP (check all that apply) Diffused Flow Documentation aick the upload button or drag and drop files here to attach docurrent 730124_Swale_BMP.pdf 136.73KB Fle lype rrust be FDF 5. DWR 401 Stormwater Review 5a. Is the Stormwater Management Plan (including BMP Supplemental Forms and Operation and Maintenance Agreements) attached? C� Yes �' No Stormwater Management Plan Upload Gick the upload button or drag and drop files here to attach docurrent I 730124_HYD_SMPv2.07_20170407.pdf 265.93KB file type rrust be pdf G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* �' Yes C' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C' Yes C•' No Comments:* This bridge replacement does not meet the minimum criteria for "potential for an environmental impacY'. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes C•' No 2b. Is this an after-the-fact permit application?* C' Yes �' No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes C•' No 3b. If you answered "no," provide a short narrative description. The project is one which qualifies as a 23 CFR 771.117. As such, the project is in a category of projects that add either no or a minor amount of new impervious surface directly, indirectly or cumulatively. Consequently, the project will not result in cumulative impacts that cause or will cause a violation of downstream water quality standards. 4. Sewage Disposal (DWR Requirement) 4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. i N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes �' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes C' No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh Sd. Is another Federal agency involved?* C' Yes C•' No 5e. Is this a DOT project located within Division's 1-8?* �' Yes C' No C' Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* USFWS Endangered Species website (list by county), Preliminary Ground Survey, Natural Heritage GIS layer. Field Scoping determined that a population of Red-Cockaded Woodpeckers has been documented just west (upstream) of bridge crossing. The US Fish and Wildlife Service proposal for listing the Northern Long-eared Bat (Myotis septentrionalis) as an I Endangered species was published in the Federal Register in October 2013. The listing became effecitve April 2015. NCDOT is working closely with the USFWS to understand howthis listing may impact NCDOT projects. NCDOT continue to corrdinate appropriately with USFWS to determine if this project will incur potential effects to the Northern Long-eared bat, and how to address these potential effects, if necessary. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes �' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* I USFWS website 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?* C� Yes C' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * NCDOT Cultural Resources office performed an internal reviewthrough the Programmatic Agreement between State Historic Preservation Office and NCDOT. 7c. Historic or Prehistoric Information Upload Gick the upload button or drag and drop files here to attach docurrent NSR Archaeology PA 16-10-0004 Pitt (No NRHPListedPresent).pdf 7.38M6 NSR Historic Architecture 16-10-0004.pdf 5.48M6 Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* �' Yes C' No 8b. If yes, explain how project meets FEMA requirements: Bridge 124 lies within a Limited Detailed FEMA study. The Water Surface Elevation between the Corrected Effective Model and the Revised Model resulted in a mabmum change of 0.0 ft. 8c. What source(s) did you use to make the floodplain determination?* I The published FIRM Map No. 3720572000L dated, July 7, 2014 and the published Pitt County FIS dated July 7, 2014. Miscellaneous attachments not previously requested. C7ick the upload button or drag and drop files here to attach docurrent SF-730124_1 st_Rd_comments_sealed.pdf 49.95K6 Fle rrust be FDF Signature * r% By checking the box and signing below, I certify that: . I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Corey Cavalier Signature ��o��� ��r�r��r��� Date : current_date Initial Review Is this project a public transportation project? *(') G Yes C' No Change only if needed. i Has this project met the requirements for acceptance in to the review process?* G Yes C' No i BIMS#Assigned* 20171541 Version#* Reviewing Office * Washington Regional Office - (252) 946-6481 Select Project Reviewer* ' Garcy Ward:eads\gpward