Loading...
HomeMy WebLinkAbout20171524 Ver 1_Impact Information_20171129., � V W 0 � � � � • � � V � � O V See Sheet 9-A For Index of Sheets TO WILSONS MILLS THIS PROJECT IS WITHIN THE TOWN OF SELMA MUNICAPAL BOUNDARIES CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. ����� �� ����� �������� �������� �� �������� JOH1�lST01� CO U1�TY LOCATI011L• INTERSECTI0111 OF US 70 A111D US 301 I11t SELMA TYPE OF WORK: GRADI11lG, PAVI11lG, DRAl11lAGE PERMI T DRA Wl1�l G ;r /� TO SELMA �TO SMITHFIELD �� �� � TO I-95 INCOMFLETE PLANS DO NOT USE FOA R9W ACQUISITION DOGUMENT NOT GONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED P�epo�ed ln /he Offlce of; �'DRAULICS ENGINEER GRAPHIC SCALES DESIGN DATA PROJECT LENGTH DIVISI0IV OF HIGHWAYS 50 25 0 50 100 i000 a:.�n n:dge nr., Raleigh Nc, z�6io p� ���Sy LENGTH ROADWAY TIP PROJECT W-5601D0 = 0.122 MILES �� ��e� 20l2 STANDARD SPEClF[CAT70NS �e` � PLANS % � g P.E. � y SIGNATURE: �u n 0 RIGHT OF WAY DATE: T.M. LITTLE PE � � APRIL 25. 2017 PRo�Ecr sNcrxssx ROADWAY DESIGN � PROFILE (HORIZONTAL) ENGINEER ���.�p ���e p LETTING DATE: D.R. ETHRIDGE �� p����� AP RI L 2 5, �L O� H f'ROJECT DES7GN ENGINEER PROFILE (VERTICAL) PE S/GNATl7RE: WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS EXISTING CHANNEL EXISTING EXISTING PERMANENT MECHANIZED HAND IMPACTS TEMP. FILL IN EXCAVATION PERMANENT TEMP. SW CHANNEL CHANNEL SITE STRUCTURE SIZE / STATION FILL IN CLEARING IN CLEARING IN PERMANENT WETLANDS IN WETLANDS SW IMPACTS IMPACTS IMPACTS IMPACTS NO. TYPE (FROM/TO) WETLANDS WETLANDS WETLANDS BANK (AC) (AC) (AC) (AC) PERMANENT TEMP. (AC) (AC) (AC) �FT� STABI NZATIO (FT) (FT) 1 EXISTING 54" RCP -Y28- 14+75 0 0 0 0 0 0 0 0 0 25 TOTALS: 25 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS JOHNSTON COUNTY PROJECT: W-5601 DO BUFFER IMPACTS SUMMARY I M PACT BUFFER WETLANDS IN TYPE ALLOWABLE MITIGABLE REPLACEMENT BUFFERS SITE STRUCTURE SIZE / STATION NO. TYPE (FROM/TO) ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 ZONE 1 ZONE 2 CROSSING BRIDGE IMPACT ft ft2 ( 2) (ft2) (ft2) (ft2) (ft2) ( ) (ft2) (ft2) (ft2) (ft2) 1 EXISTING 54" RCP -Y28- 14+75 X 1572 1084 2656 0 0 0 0 0 TOTAL: 1572 1084 2656 0 0 0 0 0 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS WILSON COUNTY PROJECT: W-5204C