HomeMy WebLinkAbout20081304 Ver 3_Approval Letter_20090127Beverly Eaves Perdue, Governor
Dee Freeman, Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
January 27, 2009
Treyburn Corporate Park, LLC
Attn: Mr. Terry Sanford, Jr.
2200 West main Street, Suite 900
Durham, NC 27705
Subject Property: Treyburn Walking Trail Phase 1, Durham, NC
UT to Perry Creek [030402, 27-25-(2), C, NSW]
DWQ Project # 2008-13040
County: Durham
AUTHORIZATION of Neuse River Buffer Rule (15A NCAC 02B.0233) Authorization Certificate
Modification
Dear Mr. Sanford, Jr.:
You have our authorization, in accordance with 15A NCAC 02B .0233 and any conditions listed below,
to impact approximately 2,318 ft2 of Zone 1 and 1,488 ft2 of Zone 2 of the protected riparian buffers for
the purpose of constructing the level spreader bypass at the subject property as described within your
application dated October 30, 2008, received by the Division of Water Quality (DWQ) on November 3,
2008 with additional information received by DWQ on January 23, 2009. In addition, you should obtain
or otherwise comply with any other required federal, state or local permits before you go ahead with your
project including (but not limited to) Erosion and Sediment Control, Non-discharge regulations.
This authorization certification is for the purpose and design that you described in your application. If
you change your project, you must notify us and you may be required to send us a new application. If the
property is sold, the new owner must be given a copy of this authorization letter and is thereby
responsible for complying with all conditions. This authorization requires you to follow the conditions
listed below. This Authorization Certificate replaces the previous Authorization Certificate issued to
you on November 13, 2008.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Amount Approved (Units) Plan Location or Reference
Zone 1 Buffers 2,318 (square ft.) Page 12 of PCN
Zone 2 Buffers 1,488 (square ft.) Page 12 of PCN
2. Erosion & Sediment Control Practices
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: htt%//h2o.enr.state.nc.us/ncwetlands
None hCarolina
Naturally
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Treyburn Corporate Park
Page 2 of 4
January 27, 2009
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Pre-Construction Notification. All construction
activities, including the design, installation, operation, and maintenance of sediment and erosion
control Best Management Practices, shall be performed so that no violations of state water quality
standards, statutes, or rules occur.
4. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters without prior
approval by the Division. If placement of sediment and erosion control devices in wetlands and
waters is unavoidable, design and placement of temporary erosion control measures shall not be
conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks,
adjacent to or upstream and down stream of the above structures. All sediment and erosion
control devices shall be removed and the natural grade restored within two (2) months of the date
that the Division of Land Resources or locally delegated program has released the project.
5. Diffuse Flow (DWQ Reviewed Plans),
All stormwater shall be directed as diffuse flow at non-erosive velocities through the protected
stream buffers and will not re-concentrate before discharging into the stream as identified within
15A NCAC 2B.0233(5)
In an effort to comply with the diffuse flow provision of the Buffer Rule (15A NCAC 02B
.0233(5)), you have provided the DWQ with level spreader designs dated January 19, 2009. The
DWQ believes that if implemented, as per these plans, diffuse flow will be achieved. However, if
diffuse flow as per 15A NCAC 02B .0233(5) is not achieved, then the DWQ shall be notified and
corrective actions to restore diffuse flow shall be taken if necessary to impede the formation of
erosion gullies. At no time shall stormwater from the proposed development be piped directly
through the buffer without prior DWQ written authorization.
The structural stormwater practices as approved by this Office as well as drainage patterns must
be maintained in perpetuity. No changes to the structural stormwater practices shall be made
Treyburn Corporate Park
Page 3 of 4
January 27, 2009
without written authorization from the Division of Water Quality. Stormwater easements shall be
recorded for a distance of at least 10 feet on each side of all stormwater conveyances on all lots
containing these structures including future access for maintenance. The stormwater easements
shall allow for the ability to maintain the structures, perform corrective actions as described
above and shall provide protection of the structures from potential alternations by future property
owners.
An Operation & Maintenance (O&M) agreement signed by the current landowner must be
approved by the DWQ. This O&M agreement must transfer with the sale of the land or transfer
of responsibility for the stormwater facilities and the DWQ must be notified of every transfer.
6. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning fencing
(or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A
NCAC 213.0233.
7. Certificate of Completion
Upon completion of all work approved within this authorization, and any subsequent
modifications, the applicant is required to return the attached certificate of completion to the 401
Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail
Service Center, Raleigh, NC, 27699-1650.
8. Deed Notifications
Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands,
waters and protective buffers in order to assure compliance for future wetland, water and buffer
impact. These mechanisms shall be put in place at the time of recording of the property, or of
individual lots, whichever is appropriate. A sample deed notification can be downloaded from the
401/Wetlands Unit web site at: http://h2o.enr. state. nc. us/ncwetlands. The text of the sample deed
notification may be modified as appropriate to suit to this project.
Any disputes over determinations regarding this Authorization (associated with the approved buffer
impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to
review as provided in Articles 3 and 4 of G.S. 150B. This Authorization shall expire five (5) years from
the date of this letter.
This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B
.0233. If you have any questions or would like a copy of the buffer rules, please call Amy Chapman or
Cyndi Karoly at (919) 733-1786. This letter does not authorize any impacts to either Waters of the
United States or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or NC
Division of Water Quality (DWQ) if any impacts are proposed to either of these waters.
Sincerely, )r4--Z4
11 Coleen H. Sullins
Treyburn Corporate Park
Page 4 of 4
January 27, 2009
CHS/cbk/asc
Enclosures: Certificate of Completion
cc: Lauren Witherspoon, DWQ Raleigh Regional Office
DLR Raleigh Regional Office
Summit Consulting, Attn: Mr. Alan Pytcher, 314-A North Madison Blvd, Roxboro, NC 27573
File Copy
Matt Matthews, DWQ Wetlands and Stormwater Branch
Filename: 081304v3Treybum WalkingTrailPhase 1(Durham)NBRmod