Loading...
HomeMy WebLinkAbout220140762 Ver 3_Corps email_20171121 Wanucha, Dave From:Alsmeyer, Eric C CIV USARMY CESAW (US) <Eric.C.Alsmeyer@usace.army.mil> Sent:Tuesday, November 21, 2017 10:13 AM To:Slaughter, Johnathan H; Wanucha, Dave Cc:Miles, Randall S; Eller, Douglas W; Doug Moxley; Dagnino, Carla S; Cheely, Erin K Subject:\[External\] RE: R-2915B Demo Plan US 221 Bridge 10; AID ???? CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. Heath: This will technically need to be authorized, but you have already sent me the required info, so I don’t need any more info on the revision. I do need to know what the Action ID is for this, and whether it’s an IP or NWP. I couldn’t find the authorization in our database. Please reply or call if you have any questions or if I may serve you in any other way. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Thank you, Eric A Eric Alsmeyer Project Manager Regulatory Division Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Tel: (919) 554-4884, x23 Fax: (919) 562-0421 Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx From: Slaughter, Johnathan H \[mailto:hslaughter@ncdot.gov\] Sent: Monday, November 20, 2017 8:00 AM To: Alsmeyer, Eric C CIV USARMY CESAW (US) <Eric.C.Alsmeyer@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Miles, Randall S <rsmiles@ncdot.gov>; Eller, Douglas W <dweller@ncdot.gov>; Doug Moxley <doug.moxley@jrvannoy.com>; Dagnino, Carla S <cdagnino@ncdot.gov>; Cheely, Erin K <ekcheely@ncdot.gov> Subject: \[EXTERNAL\] R-2915B Demo Plan US 221 Bridge 10 Importance: High Eric/Dave, Vannoy Construction has requested authorization to increase the size of the southern causeway under the old bridge crossing the South Fork New River. The causeway change is needed due to the condition of the old bridge. There is concern about sections of the old bridge falling into the river as pieces are cut. The expanded causeway would catch those sections should 1 their assumption be correct. This is a parallel impact to the causeway on the other side from a linear foot perspective but will be a larger area of temporary impact than shown in the final plans. Please advise as to whether you need to officially modify the plans or if this email to the file will suffice. Erin – Please handle any official permit modification if one is required. From: Gary Eisner \[mailto:gary.eisner@jrvannoy.com\] Sent: Thursday, November 16, 2017 1:26 PM To: Eller, Douglas W <dweller@ncdot.gov> Cc: Miles, Randall S <rsmiles@ncdot.gov>; Doug Moxley <doug.moxley@jrvannoy.com>; Slaughter, Johnathan H <hslaughter@ncdot.gov> Subject: \[External\] RE: Demo Plan US 221 Bridge 10 CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. Mr. Eller I have attached a Drawing with the second Phase Causeway for bridge Demo on it . It look to be about 57’6” long and 30 ‘ wide . I come up with an area of 192 SY . This Causeway would be installed after the removal of the Causeway drawn on the plans on the North end . Please contact me with any questions. Thank you Gary D Eisner Vannoy Construction Bridge Construction Manger Office 336-846-4228 Cell 336-877-0670 E-mail gary.eisner@jrvannoy.com From: Gary Eisner Sent: Thursday, November 09, 2017 8:35 AM To: Eller, Douglas W (dweller@ncdot.gov) Cc: 'Miles, Randall S'; Doug Moxley Subject: Demo Plan US 221 Bridge 10 CONTRACT : C203758 WBS: 34518.3.6,34518.3.7 COUNTY: ASHE,WATAUGA T.I.P.NO: R-2915A,R-2915B Mr. Eller Vannoy Construction would like to submit for your Review, the Demo Plan for Bridge # 10 on the Above mentioned project . Please contact me with any Questions . Thank you Gary D Eisner Vannoy Construction 2 Bridge Construction Manger Office 336-846-4228 Cell 336-877-0670 E-mail gary.eisner@jrvannoy.com Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3