HomeMy WebLinkAbout20140762 Ver 3_RE External RE R-2915B Demo Plan US 221 Bridge 10_20171127
Wanucha, Dave
From:Wanucha, Dave
Sent:Monday, November 27, 2017 1:47 PM
To:Slaughter, Johnathan H
Cc:Eller, Douglas W; Miles, Randall S; gary.eisner@jrvannoy.com
Subject:RE: \[External\] RE: R-2915B Demo Plan US 221 Bridge 10
Attachments:Turbid Curtain example.JPG
Heath,
We will authorize the additional impacts via this email. I will archive the email chain in the project file for future
reference. With respect to the use of turbidity curtains in flowing water, I have observed in Division 7 where a turbidity curtain
was deployed effectively in flowing water (about same size as the South Fork New River) during removal of a temporary
crossing. It was placed in stream with the current, parallel along one stream bank similar to the sketch in the attachment. I
would encourage you to consider its use, but will leave the final decision up to you and field personnel. Please let me know if
you need anything further.
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Slaughter, Johnathan H
Sent: Wednesday, November 22, 2017 7:41 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: Eller, Douglas W <dweller@ncdot.gov>; Miles, Randall S <rsmiles@ncdot.gov>; gary.eisner@jrvannoy.com
Subject: FW: \[External\] RE: R-2915B Demo Plan US 221 Bridge 10
Dave,
See answer to question 4 below. Let me know if you have further questions.
From: Gary Eisner \[mailto:gary.eisner@jrvannoy.com\]
Sent: Wednesday, November 22, 2017 7:37 AM
To: Slaughter, Johnathan H <hslaughter@ncdot.gov>
Cc: Doug Moxley <doug.moxley@jrvannoy.com>
Subject: \[External\] RE: R-2915B Demo Plan US 221 Bridge 10
1
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
report.spam@nc.gov.
Heath
We plan to handle the Slurry as we did on the NBL Bridge that was constructed just up stream for this Bridge . We used
Permanent Casing ,Pumping in to a sediment bag .
I wanted to send this to your ,before I sent a response .
Thank you
Gary D Eisner
Vannoy Construction
Bridge Construction Manger
Office 336-846-4228
Cell 336-877-0670
E-mail gary.eisner@jrvannoy.com
From: Doug Moxley
Sent: Tuesday, November 21, 2017 7:08 PM
To: Gary Eisner
Subject: FW: R-2915B Demo Plan US 221 Bridge 10
Just saw you aren’t copied on this email. See below. Question #4
From: Slaughter, Johnathan H \[mailto:hslaughter@ncdot.gov\]
Sent: Tuesday, November 21, 2017 12:14 PM
To: Wanucha, Dave; Alsmeyer, Eric C CIV USARMY CESAW (US) (Eric.C.Alsmeyer@usace.army.mil)
Cc: Miles, Randall S; Eller, Douglas W; Doug Moxley; Dagnino, Carla S; Cheely, Erin K
Subject: RE: R-2915B Demo Plan US 221 Bridge 10
1) Site #19 on R-2915B.
2) Yes
3) Well we can’t dewater the South Fork New River. We can install a turbidity curtain but they are not designed to be used
in flowing water and generally don’t work well in those situations.
4) Randall/Doug or Doug – you will need to answer bullet #4.
From: Wanucha, Dave
Sent: Tuesday, November 21, 2017 10:17 AM
To: Slaughter, Johnathan H <hslaughter@ncdot.gov>; Alsmeyer, Eric C CIV USARMY CESAW (US)
(Eric.C.Alsmeyer@usace.army.mil) <Eric.C.Alsmeyer@usace.army.mil>
Cc: Miles, Randall S <rsmiles@ncdot.gov>; Eller, Douglas W <dweller@ncdot.gov>; Doug Moxley <doug.moxley@jrvannoy.com>;
Dagnino, Carla S <cdagnino@ncdot.gov>; Cheely, Erin K <ekcheely@ncdot.gov>
Subject: RE: R-2915B Demo Plan US 221 Bridge 10
Heath,
Unless the Corps objects, we can allow this request without a formal modification. This email will suffice, but please provide the
additional information listed below. Thanks.
-What is the permitted Site Number to which you refer?
-Will work pad construction and removal be staged so that no more than half of the channel is blocked at any time?
-South Fork of New River is High Quality Waters (HQW). How will DOT manage turbidity/sediment impacts during construction
and demolition of causeways?
-How is DOT managing drill slurry material?
2
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Slaughter, Johnathan H
Sent: Monday, November 20, 2017 8:00 AM
To: Alsmeyer, Eric C CIV USARMY CESAW (US) (Eric.C.Alsmeyer@usace.army.mil) <Eric.C.Alsmeyer@usace.army.mil>; Wanucha,
Dave <dave.wanucha@ncdenr.gov>
Cc: Miles, Randall S <rsmiles@ncdot.gov>; Eller, Douglas W <dweller@ncdot.gov>; Doug Moxley <doug.moxley@jrvannoy.com>;
Dagnino, Carla S <cdagnino@ncdot.gov>; Cheely, Erin K <ekcheely@ncdot.gov>
Subject: R-2915B Demo Plan US 221 Bridge 10
Importance: High
Eric/Dave,
Vannoy Construction has requested authorization to increase the size of the southern causeway under the old bridge crossing
the South Fork New River. The causeway change is needed due to the condition of the old bridge. There is concern about
sections of the old bridge falling into the river as pieces are cut. The expanded causeway would catch those sections should
their assumption be correct. This is a parallel impact to the causeway on the other side from a linear foot perspective but will be
a larger area of temporary impact than shown in the final plans.
Please advise as to whether you need to officially modify the plans or if this email to the file will suffice.
Erin – Please handle any official permit modification if one is required.
From: Gary Eisner \[mailto:gary.eisner@jrvannoy.com\]
Sent: Thursday, November 16, 2017 1:26 PM
To: Eller, Douglas W <dweller@ncdot.gov>
Cc: Miles, Randall S <rsmiles@ncdot.gov>; Doug Moxley <doug.moxley@jrvannoy.com>; Slaughter, Johnathan H
<hslaughter@ncdot.gov>
Subject: \[External\] RE: Demo Plan US 221 Bridge 10
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
report.spam@nc.gov.
Mr. Eller
I have attached a Drawing with the second Phase Causeway for bridge Demo on it . It look to be about 57’6” long and 30 ‘ wide
. I come up with an area of 192 SY . This Causeway would be installed after the removal of the Causeway drawn on the plans on
the North end .
Please contact me with any questions.
3
Thank you
Gary D Eisner
Vannoy Construction
Bridge Construction Manger
Office 336-846-4228
Cell 336-877-0670
E-mail gary.eisner@jrvannoy.com
From: Gary Eisner
Sent: Thursday, November 09, 2017 8:35 AM
To: Eller, Douglas W (dweller@ncdot.gov)
Cc: 'Miles, Randall S'; Doug Moxley
Subject: Demo Plan US 221 Bridge 10
CONTRACT : C203758
WBS: 34518.3.6,34518.3.7
COUNTY: ASHE,WATAUGA
T.I.P.NO: R-2915A,R-2915B
Mr. Eller
Vannoy Construction would like to submit for your Review, the Demo Plan for Bridge # 10 on the Above mentioned project .
Please contact me with any Questions .
Thank you
Gary D Eisner
Vannoy Construction
Bridge Construction Manger
Office 336-846-4228
Cell 336-877-0670
E-mail gary.eisner@jrvannoy.com
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
4
T URBIDl
TYPICAL LAYOUTS:
STREAMS, PONDS & LAKES (PROiECTED & NON—TIDAL)
� :��� � e oa ..
crcmr �oo� m�iuq
znawrc � � fiu i.eu
�� �'
—__ �/ _�.x_
i
TI�AL WATERS ANO/OR HEAVY WIND & WAVE ACTION
G«�����F��/1 . ����-
� M<HOR BIIOY \
�� C o Y�OµuExi nv..rov n
. � CNnxC[ � �
� o . �R��
Soorte: Adap�ed hom Flonda Depanmentof
Trartsporm�ion Rwd an0 Desig� Specificaiions Plam 32]d