Loading...
HomeMy WebLinkAbout20171374 Ver 1_DOT request_20171127Wanucha, Dave From: Slaughter, Johnathan H Sent: Monday, November 27, 2017 8:29 AM To: Wanucha, Dave Subject: FW: [External] NWP 14 verification with NCDMS mitigation req. RE: AID SAW-2017-02438, NCDOT, Project Number NCDOT_17BP.11.R.143_SR1710_Old Stage Rd_BR10; Yadkin. Attachments: 2017NWP14.pdf; 17-11-24_NCDOT_17BP.11.R.143_SR1710_Old Stage Rd_BR10; Yadkin_MRT.pdf; e17-11-24 _NCDOT_17BP.11.R.143_SR1710_Old Stage Rd_BR10; Yadkin_NWP14.pdf Dave, We have received the 404 for Yadkin #10. The contractor would like to start in December so he would appreciate anything you could do to expedite the 401. Thanks. -----Original Message----- From: Alsmeyer, Eric C CIV USARMY CESAW (US) [mailto:Eric.C.Alsmeyer@usace.army.mil] Sent: Friday, November 24, 2017 4:54 PM To: Slaughter, Johnathan H <hslaughter@ncdot.gov> Cc: Harmon, Beth <beth.harmon@ncdenr.gov>; Hughes, Andrea W CIV USARMY CESAW (US) <Andrea.W.Hughes@usace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (US) <Kimberly.D.Browning@usace.army.mil>; Kichefski, Steven L CIV USARMY CESAW (US) <Steven.L.Kichefski@usace.army.mil> Subject: [External] NWP 14 verification with NCDMS mitigation req. RE: AID SAW-2017-02438, NCDOT, Project Number NCDOT_17BP.11.R.143_SR1710_Old Stage Rd_BR10; Yadkin. CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. Heath: Attached to this message is your requested Section 404 permit authorization for the following project: AID SAW-2017-02438, NCDOT, Project Number NCDOT_17BP.11.R.143_SR1710_Old Stage Rd_BR10; Yadkin. Also attached are the corresponding regional and general conditions, and a copy of the permit compliance certification. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Please note that the general and special conditions must be strictly adhered to in order for this permit authorization to remain valid and that the compliance certification must be returned to this office when the work is completed. This electronic copy is your official Department of the Army authorization; no paper copy will be mailed. This verification has also been e-mailed to the NC Division of Mitigation Services. Please reply or call if you have any questions or if I may serve you in any other way. Eric Alsmeyer Project Manager Regulatory Division Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Tel: (919) 554-4884, x23 Fax: (919) 562-0421 Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx (If you need information that is not yet available on our new website, please let me know) -----Original Message----- From: Slaughter, Johnathan H [mailto:hslaughter@ncdot.gov] Sent: Monday, November 20, 2017 7:40 AM To: Alsmeyer, Eric C CIV USARMY CESAW (US) <Eric.C.Alsmeyer@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Eleni Riggs (eriggs@rkk.com) (eriggs@rkk.com) <eriggs@rkk.com> Subject: [EXTERNAL] Yadkin Bridge #10 Eric/Dave, I know that you haven't had this PCN long but the contractor is wanting to begin in December. If you can expedite this one they would appreciate it. WRC comments aren't needed since it's Yadkin County. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.