Loading...
HomeMy WebLinkAboutNC0021474_Compliance Evaluation Inspection_20171113s �o Water Resources Environmental Quality November 13, 2017 Mr. David Cheek, City Manager City of Mebane 106 East Washington Street Mebane, North Carolina, 27302 Subject: Compliance Evaluation Inspection Report NPDES Permit NCO021474 Mebane WWTP, Alamance County Dear Mr. Cheek: ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director NOV 21 2017 VFater Quection perrnitting On November 7, 2017, Paul DiMatteo of the Division of Water Resources ("Division"), Winston-Salem Regional Office conducted a Compliance Evaluation Inspection of the above referenced wastewater treatment system. The presence and cooperation of Dennis Hodge, Anthony Bowes, and Amy Varinoski was greatly appreciated. This type ofinspection consists of two basic parts: an on-site inspection of the facility and a review of facility files and self-monitoring data. Observations from each area of the inspection are summarized below. Site Review 1. Permit The current permit became effective on July 1, 2014 and expires on May 31, 2019. A copy of the current permit was available for review. Permitted components include an aeration basin, clarifiers, cloth media disk filters, chlorine disinfection and dechlorination. 2. Facility Site Review The facility was as described in the permit. A minor permit modification and Authorization to Construct was issued this year to relocate the effluent pipe to a point downstream. The operators reported that the work was expected to be completed within the coming months. Operators also reported that the cloth filter media was recently replaced with a material that was more suited to the characteristics of the plant's wastewater. 3. Operation and Maintenance Dennis Hodge is the current Operator in Responsible Charge, and Anthony Bowes and Amy Varinoski are backup ORCs. All operators are properly designated and hold the correct credentials. Operators use a SCADA system to automate some of the operation of the aeration basins, a Hach ` "Nothing Compares-`--.- State ompares`--.- State of North Carolina I Environmental Quality 450 W Hanes Mill Road, Suite 300, Winston-Salem, North Carolina 27105 Phone 336-776-98001 FAX 336-776-9797 it JOB Cal database to track maintenance, and mobile devices to track plant performance. Process controls are also verified daily at the plant's laboratory. 4. Flow Measurement Both influent and effluent flow meters are checked every 3 months by Instrument Services, Inc. The meters were last calibrated in September 2017. Generally, only the influent flow is reported, but on occasion the influent flow meter will be out of service and effluent flow will be reported instead. However, it was noted that water at the effluent flow device was turbulent, which may lead to erroneous measurements. When effluent flow is reported, care should be taken to ensure that it is within 10% of the true value. 5. Effluent/Receiving Waters The effluent is discharged to Moadams Creek, Class WS -V; NSW water in the Cape Fear River Basin. In -stream monitoring requirements have been waived as long as the City of Mebane remains a member of the Upper Cape Fear River Basin Association. The effluent appeared clear. Documentation Review 6. Records/Reports Discharge Monitoring Reports (DMRs) and lab data are maintained according to the permit. DMRs include all permit parameters. Copies of DMRs, operator visitation logs, lab reports and Chain -of - Custody forms were available for review during the inspection. Recordkeeping practices appeared excellent. 7. Self -Monitoring Program A review of DMRs from July, 2015 through September, 2017 showed no violations, and a comparison of submitted DMR data with bench records showed no errors or concerns. 8. Laboratory Most parameters, including field parameters, are analyzed by the Mebane WWTP Laboratory under certification #138. The remaining parameters are analyzed by either Meritech under certification #165 or Research and Analytical Labs under certification #34. Field parameter calibration and sampling procedures appeared acceptable. Laboratory thermometers showed that the fecal incubator and total suspended solids oven were within the proper range. Flow proportional composite sampling is conducted at the influent and effluent. Temperature records of the influent sampler's refrigeration unit showed that it sometimes reaches <0°C inside the refrigerator. While the operators said that the sample itself does not freeze, care must be taken to ensure that this continues to be the case. The operators said that sampler tubing and aliquot volume are checked monthly. The effluent composite sampler produced a 118 mL aliquot. 9. Sludge Handling Disposal The plant has two aerobic digesters. A mobile belt press is brought in about every 5 weeks to dewater sludge for subsequent use by Earth Tech in remediation projects or by McGill for composting and conversion to a sellable product. We appreciate the efforts made to effectively comply with this permit. If you should have any questions, please do not hesitate to contact Paul DiMatteo at (336) 776-9691 or our office at (336) 776-9800. Sincerely, C�J�0/'�/,•jJ, ' n v herri V. Knight, P.E., Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office Division of Water Resources, NCDEQ Enclosures—Inspection Report and Summary CC: Dennis Hodge, by email WQS Winston-Salem Regional Office - Enforcement File NPDES Compliance/Enforcement Unit - Enforcement File Central Files United States Environmental Protection Agency Form Approved EPA Washington, D C 20460 OMB No 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A National Data System Coding (i a, PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 E 2 15 1 3 I NCO021474 I11 12 17/11/07 17 181,.E 191 s I 20I 21111111 1111111 11 11 1 11 1111 1 1 11111 1111111 11 1 1 166 I Inspection Work Days Facility Self -Monitoring Evaluation Rating -131 QA -Reserved 67 70 IJ 71 I JI 72 1 L�i J 1 731 LI_L_ 1 I74 75 80 Section B Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 10.15AM 17/11/07 14/07/01 Mebane WWTP Exit Time/Date Permit Expiration Date 635 Corregidor Rd 01 45P 17111/07 19/05/31 Mebane NC 27302 Name(s) of Onsite Representative(s)/Tities(s)/Phone and Fax Number(s) Other Facility Data M Dennis James Hodge/ORC/336-906-5583/ Name, Address of Responsible Official/Titie/Phone and Fax Number Contacted Linda R Hoit,106 E Washington St Mebane NC 27302//919-563-6141/ No Section C Areas Evaluated During Inspection (Check only those areas evaluated) Permit N Flow Measurement Operations & Maintenance Records/Reports Self -Monitoring Program 0 Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters Laboratory Section D• Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Paul DiMatteo WSRO WQ/1336-776-9691/ ?"_0_' Il//31701 Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete Page# NPDES yr/mo/day Inspection Type (Cont. 1 31 NC002142 I11 12 17/11/07 17 18 ICI C 1 Section D• Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Site Review 1. • Permit The current permit became effective on July 1, 2014 and expires on May 31, 2019 A copy of the current permit was available for review. Permitted components include an aeration basin, clarifiers, cloth media disk filters, chlorine disinfection and dechlorination 2. Facility Site Review The facility was as described in the permit. A minor permit modification and Authorization to Construct was issued this year to relocate the effluent pipe to a point downstream. The operators reported that the work was expected to be completed within the coming months. Operators also reported that the cloth filter media was recently replaced with a material that was more suited to the characteristics of the plant's wastewater 3 Operation and Maintenance Dennis Hodge is the current Operator in Resporsible Charge, and Anthony Bowes and Amy Varinoski are backup ORCs. All operators are properly designated and hold the correct credentials Operators use a SCADA system to automate some of the operation of the aeration basins, a Hach JOB Cal database to track maintenance, and mobile devices to track plant performance. Process controls are also verified daily at the plant's laboratory. 4. Flow Measurement Both influent and effluent flow meters are checked every 3 months by Instrument Services, Inc. The meters were last calibrated in September 2017 Generally, only the influent flow is reported, but on occasion the influent flow, meter will be out of se -vice and effluent flow will be reported instead However, it was noted that water at the effluent flow device was turbulent, which may lead to erroneous measurements. When effluent flow is reported, care should be taken to ensure that it is within 10% of the true value 5. Effluent/Receiving Waters The effluent is discharged to Moadams Creek, Class WS -V; NSW water in the Cape Fear River Basin. In -stream monitoring requirements have been waived as long as the City of Mebane remains a member of the Upper Cape Fear River Basin Association. The effluent appeared clear. Documentation Review 6. Records/Reports Discharge Monitoring Reports (DMRs) and lab data are maintained according to the permit DMRs include all permit parameters Copies of DMRs, operator visitation logs, lab reports and Chain -of -Custody forms were available for review during the inspection Recordkeeping practices appeared excellent. 7 Self -Monitoring Program A review of DMRs from July, 2015 through September, 2017 showed no violations, and a comparison of submitted DMR data with bench records showed no errors or concerns. 8. Laboratory Most parameters, including field parameters, are analyzed by the Mebane WWTP Laboratory under certification #138. The remaining parameters are analyzed by either Meritech under certification #165 or Research and Analytical Labs under certification #34 Field parameter calibration and sampling procedures appeared acceptable. Laboratory thermometers showed that the fecal incubator and total suspended solids oven were within the proper range. Flow proportional composite sampling is conducted at the influent and effluent. Temperature records of the influent sampler's refrigeration unit showed that it sometimes reaches <0°C inside the refrigerator. While the operators said that the sample itself does not freeze, care must be taken to ensure that this continues to be the case. The operators said that sampler tubing and aliquot volume are checked monthly. The effluent composite sampler produced a 118 mL aliquot. 9 Sludge Handling Disposal Page# permit- NC0021474 Owner -Facility. Mebane WWTP Inspection Date: 11/07/2017 Inspection Type Compliance Evaluation The plant has two aerobic digesters. A mobile belt press is brought in about every 5 weeks to dewater sludge for subsequent use by Earth Tech In remediation projects or by McGill for composting and conversion to a sellable product. Page# 4 Permit NCO021474 Owner -Facility: Mebane WWTP Inspection Date: 11/07/2017 Inspection Type- Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex- MLSS, MCRT, Settleable N ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Process control parameters include DO, pH, temperature. NH4. NO3 Probes in the aeration basin automate much of the process, but they are also double checked twice per day in the lab In the lab they also check sludge microorganisms once per week. Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ N ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ Is all required information readily available, complete and current? ❑ ❑ Is access to the plant site restricted to the general public? ❑ ❑ ❑ ❑ Is the inspector granted access to all areas for insoection? ❑ ❑ ❑ ❑ Comment: Plant recently received a Minor Permit Modification and Authorization, to Construct to ❑ Is the chain -of -custody complete? E relocate the outfall downstream. Operators reported that the work is currently on track to be ❑ Dates, times and location of sampling completed before this Thanksgiving. Name of individual performing the sampling Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? ❑ ❑ ❑ Is all required information readily available, complete and current? ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg required 5 years)? ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? ■ ❑ ❑ ❑ Is the chain -of -custody complete? E ❑ ❑ ❑ Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete do they include all permit parameters? 0 ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? 0 ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ 0 ❑ on each shift? Is the ORC visitation log available and current? 0 ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? 0 ❑ ❑ ❑ Page# 4 I Permit. NCO021474 Owner - Facility, Mebane WWTP Yes No NA NE # Is flow meter used for reporting? 0 ❑ Inspection Date: 11/07/2017 InspectionType- Compliance Evaluation ❑ Is flow meter calibrated annually? 0 ❑ Record Keeping Yes No NA NE Is the backup operator certified at one grade less or greater than the facility classification? 0 ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? ❑ ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ ❑ ❑ Comment: Record keepina practices were excellent. Annual report available on the City of Mebane's website. Flow Measurement - Influent Yes No NA NE # Is flow meter used for reporting? 0 ❑ ❑ ❑ Is flow meter calibrated annually? 0 ❑ ❑ ❑ Is the flow meter operational? N ❑ ❑ ❑ (if units are separated) Does the chart recorder match the flow meter? ❑ ❑ ❑ E Comment: Primary device is a 9" Parshall flume• secondary is an ultrasonic device. Calibration is ❑ ❑ ❑ checked quarterly by ISI Instrument Services, Inc. Last checked on September 1, 2017. ❑ ❑ Comment: Manual bar screen is available for back-up if the mechanical screen goes down or Device is lust after ant removal At times when accumulated grit is removed from the grit basin flow Is diverted around this flume, and effluent flow is used for reporting measurement device. There is another Parshall flume on the manual influent train but it Bar Screens Yes No NA NE Type of bar screen a.Manual a Manual b.Mechanical b.Mechanical ❑ Are the bars adequately screening debris? 0 ❑ ❑ ❑ Is the screen free of excessive debris? ❑ ❑ ❑ Is disposal of screening in compliance? ❑ ❑ ❑ Is the unit in good condition? E ❑ ❑ ❑ Comment: Manual bar screen is available for back-up if the mechanical screen goes down or grit needs to be removed from the grit chamber However, this diverts flow from the influent flow measurement device. There is another Parshall flume on the manual influent train but it lacks a secondary device or a correctly placed staff gauge in the flume Grit Removal Yes No NA NE Type of grit removal a Manual b.Mechanical ❑ Is the grit free of excessive organic matter? ❑ ❑ ❑ E Is the grit free of excessive odor? 0 ❑ ❑ ❑ # Is disposal of grit in compliance? 0 ❑ ❑ ❑ Page# 5 Permit NCO021474 Inspection Date- 11/07/2017 Grit Removal Owner -Facility- MebaneWWTF Inspection Type Compliance Evaluation r Yes No NA NE Comment* Wastewater is slowed after the bar screen, allowing grit to settle out. Per ORCs the chamber is cleaned about every 2 months. Influent Sampling Yes No NA NE # Is composite sampling flow proportional? 0 ❑ 1111 Type of aeration system Is sample collected above side streams? N ❑ ❑ ❑ Is proper volume collected? ❑ ❑ ❑ 0 Is the tubing clean? N ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees E ❑ ❑ ❑ Celsius)? ❑ ❑ Is the DO level acceptable? ❑ Is sampling performed according to the permit? ❑ ❑ ❑ ❑ Comment- Ms Varinoski reported that the aliquot volume was set to 130 mL. This was not verified at the influent Thermometer inside the sample refrigerator read -2.1 C. Operators said they have not had issues with sample freezing_ Aeration Basins Yes No NA NE Mode of operation Ext. Air Mr Hodge said he aims for Type of aeration system Surface with nutrient reduction. Is the basin free of dead spots? 0 ❑ ❑ ❑ Are surface aerators and mixers operational? E ❑ ❑ ❑ Are the diffusers operational? ❑ ❑ 0 ❑ Is the foam the proper color for the treatment process? N ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? ❑ ❑ ❑ Is the DO level acceptable? ❑ ❑ ❑ Is the DO level acceptable?(1.0 to 3 0 mg/1) ❑ ❑ ❑ N Comment. 2 aeration basins each have 5 surface aerators. Their SCADA system allows them to automatically activate and deactivate blowers based on certain conditions Operators said they achieve biological nitrogen reduction through this process. Mr Hodge said he aims for lower DO of about 0 8 mg/L In the aeration basin to help with nutrient reduction. Pumps -RAS -WAS Yes No NA NE Are pumps in place? ❑ ❑ ❑ Are pumps operational? ❑ ❑ ❑ Are there adequate spare parts and supplies on site? ❑ ❑ ❑ Page# 6 I Permit- NCO021474 Owner - Facility: Mebane WWTP Inspection Date: 11/07/2017 Inspection Type- Compliance Evaluation Pumps -RAS -WAS Yes No NA NE Comment: No leaks or odor were apparent in the pump house and the operators reported that all pumps were operational. Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) Yes No NA NE ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ E ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ■ Comment. There seemed to be a much higher amount of floating scum in the smaller clarifiers than the larger one but water coming over the weirs appeared clear. Operators said they try to keep the sludge blanket very low, about 0 25 feet This was not verified during the inspection. Filtration (High Rate Tertiary) Yes No NA NE Type of operation. Cross flow Is the filter media present? 0 ❑ ❑ ❑ Is the filter surface free of clogging? 0 ❑ ❑ ❑ Is the filter free of growth? 0 ❑ ❑ ❑ Is the air scour operational? ❑ ❑ ❑ ❑ Is the scouring acceptable? ❑ ❑ ❑ ❑ Is the clear well free of excessive solids and filter media? N ❑ ❑ ❑ Comment. A cloth media disk filtration system ("Agua MiniDisk") was Installed several years ago. Operators reported that the media was replaced with a more suitable material over the past year, and the media typically lasts 7-10 years. Operators also reported that the system has a peak capacity of 7 5 mgd and half of the old sand filter basin is still available to install additional systems if needed. Disinfection -Liquid Yes No NA NE Is there adequate reserve supply of disinfectant? N ❑ ❑ ❑ (Sodium Hypochlorite) Is pump feed system operational? E ❑ ❑ ❑ Page# 7 I Permit, NCO021474 Owner -Facility- Mebane WWTP Yes No NA NE Type of system? Liquid ❑ Inspection Date: 11/07/2017 Inspection Type Compliance Evaluation ❑ Is the feed ratio proportional to chlorine amount (1 to 1)? M ❑ Disinfection -Liquid Yes No NA NE Is bulk storage tank containment area adequate? (free of leaks/open drains) M ❑ ❑ ❑ Is the level of chlorine residual acceptable? ❑ ❑ ❑ M Is the contact chamber free of growth, or sludge tuildup? 0 ❑ ❑ ❑ Is there chlorine residual prior to de -chlorination? ❑ ❑ ❑ M Comment- Liquid sodium hypochlorite. Operators reported they receive about 600 gallons every 2 weeks. De -chlorination Yes No NA NE Type of system? Liquid ❑ ❑ ❑ Is the feed ratio proportional to chlorine amount (1 to 1)? M ❑ ❑ ❑ Is storage appropriate for cylinders? ❑ ❑ ❑ ❑ # Is de -chlorination substance stored away from chlorine containers? 0 ❑ ❑ ❑ Are the tablets the proper size and type? ❑ ❑ 0 ❑ Comment: Liquid sodium bisulfite dechlorination. Operators said thev receive about 370 gallons eve month Tanks for both sodium hypochlorite and sodium bisulfate are housed in the same building, and each tank has a large plastic tub around it to Drovide containment in case of a Spill Are tablet de -chlorinators operational? ❑ ❑ 0 ❑ Number of tubes in use? Comment. Aerobic Digester Yes No NA NE Is the capacity adequate? -M ❑ ❑ ❑ Is the mixing adequate? M ❑ ❑ ❑ Is the site free of excessive foaming in the tank? M ❑ ❑ ❑ # Is the odor acceptable? M ❑ ❑ ❑ # Is tankage available for properly waste sludge? 0 ❑ ❑ ❑ Comment: About every 5 weeks a mobile belt Dress is brought in to remove sludge from the holdin tanks Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? ❑ 0 ❑ ❑ Is flow meter calibrated annually? 0 ❑ ❑ ❑ Is the flow meter operational? 0 ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ 110 Page# 8 t Permit- NCO021474 Owner - Facility Mebane WWTP Inspection Date: 11/07/2017 Inspection Type- Compliance Evaluation Flow Measurement - Effluent Yes No NA NE Comment- There is a rectangular weir followed by an ultrasonic device inside the sodium bisulfite contact basin The water in the basin was very turbulent. Operators reported that flow from this device Is only reported when the Influent device is not in use. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment: Effluent pipe is currently being relocated There was some accumulation of larger bubbles/foam at the outfall. No evidence of toxicity or other stream Impacts Effluent Sampling Yes No NA NE Is composite sampling flow proportional? S ❑ ❑ ❑ Is sample collected below all treatment units? E ❑ ❑ ❑ Is proper volume collected? N ❑ ❑ ❑ Is the tubing clean? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? ❑ ❑ ❑ Is the facility sampling performed as required by the permit (frequency, sampling type ❑ ❑ ❑ ❑ representative)? Comment: Composite sampler takes about 80 aliquots per sampling period Sampler was set for a 110 mL aliquot a 118 mL aliquot was pulled during the inspection. Thermometer inside the refrigerator read 0.9 C. Operators said that they pull samples every day, though they only routinely perform analyses for samples pulled on Tuesday and Thursday (Monday and Wednesday for fecal). Other samples are stored in the laboratory refrigerator in case more analysis Is needed Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? S ❑ ❑ ❑ Are all other parameters(excluding field parameters) performed by a certified lab? E ❑ ❑ ❑ # Is the facility using a contract lab? ❑ E ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees N ❑ ❑ ❑ Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0 2 degrees? ❑ ❑ ❑ Incubator (BOD) set to 20 0 degrees Celsius +/- 1.0 degrees? ❑ ❑ ❑ 0 Page# 9 n Permit- NCO021474 Owner -Facility. MebaneWWTP Inspection Date- 11/07/2017 Inspection Type- Compliance Evaluation Laboratory Yes No NA NE Comment: Facllltvanalvzes most parameters except toxicitv. metals. TKN. and BOD. Thermometer Inside fecal water bath read 44.7 C. TSS oven read 103.8 C. Facility also maintains internal CoCs for parameters analvzed In their own lab. Field parameter calibration and sampling procedures appeared adequate Standby Power I I Yes No NA NE Is automatically activated standby power available? 0 ❑ ❑ ❑ Is the generator tested by interrupting primary power source? N ❑ ❑ ❑ Is the generator tested under load? E ❑ ❑ ❑ Was generator tested & operational during the Inspection? ❑ ❑ ❑ N Do the generator(s) have adequate capacity to operate the entire wastewater site? 0 ❑ ❑ ❑ Is there an emergency agreement with a fuel vendor for extended run on back-up power? ❑ ❑ ❑ 0 Is the generator fuel level monitored? N ❑ ❑ ❑ Comment. Operators reported that the on -s to -generator could power the entire plant for over 24 hours with a full tank Generator is tested under load every Monday. Page# 10