Loading...
HomeMy WebLinkAbout20171501 Ver 1_RE Onslow Bridge #54 end bent stabilization_20171122 Carpenter,Kristi From:Westphal, Anneliese Sent:Wednesday, November 22, 2017 1:27 PM To:Carpenter,Kristi; Lane, Stephen; 'brad.e.shaver@usace.army.mil'; Mason, James S Cc:Steenhuis, Joanne; Chapman, Amy; Herndon, T. Mason Subject:RE: Onslow Bridge #54 end bent stabilization Attachments:Onslow Bridge 54 Permit Drawings_20171122.pdf Kristi Lynn, I spoke with Joanne Steenhuis today. She asked me to add a permit impact summary table to the permit drawings. Please see attached – the table is page 3 of 3. Also on page 3 in the lower left hand corner, you will find the lat/long of the project, the river basin, and the stream name. Please let me know if I can provide anything else. Thank you. Anneliese Anneliese Westphal Environmental Specialist Division 3 NCDOT- Division of Highways 910 341 2000 office 910 675 0143 fax awestphal@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429-5647 From: Carpenter,Kristi Sent: Tuesday, November 21, 2017 1:36 PM To: Westphal, Anneliese <awestphal@ncdot.gov>; Lane, Stephen <stephen.lane@ncdenr.gov>; 'brad.e.shaver@usace.army.mil' <brad.e.shaver@usace.army.mil>; Mason, James S <jsmason@ncdot.gov> Cc: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>; Chapman, Amy <amy.chapman@ncdenr.gov> Subject: RE: Onslow Bridge #54 end bent stabilization Anneliese, 1 The NW3 has to meet several conditions in order to not require a written approval. You can use the following link to view all the thresholds and circumstances that would need to be met in order for approval to not be required. http://edocs.deq.nc.gov/WaterResources/0/doc/493391/Page1.aspx After reading page 5 of the provided DCM application it sounded to me as though there would be enough impact to trigger written notification. Sending in an electronic PCN would give us the information needed to make a solid determination on whether the written approval is necessary. Due to this project being in conjunction with a CAMA project additional fees would not be charged for the approval if needed. Thanks, Kristi Lynn From: Westphal, Anneliese Sent: Tuesday, November 21, 2017 1:19 PM To: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>; Lane, Stephen <stephen.lane@ncdenr.gov>; 'brad.e.shaver@usace.army.mil' <brad.e.shaver@usace.army.mil>; Mason, James S <jsmason@ncdot.gov> Cc: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>; Chapman, Amy <amy.chapman@ncdenr.gov> Subject: RE: Onslow Bridge #54 end bent stabilization Hi Kristi Lynn, Could you please explain what the trigger is for written approval from DWR? Thank you, Anneliese Anneliese Westphal Environmental Specialist Division 3 NCDOT- Division of Highways 910 341 2000 office 910 675 0143 fax awestphal@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429-5647 From: Carpenter,Kristi Sent: Tuesday, November 21, 2017 10:19 AM To: Westphal, Anneliese <awestphal@ncdot.gov>; Lane, Stephen <stephen.lane@ncdenr.gov>; 'brad.e.shaver@usace.army.mil' <brad.e.shaver@usace.army.mil>; Mason, James S <jsmason@ncdot.gov> Cc: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>; Chapman, Amy 2 <amy.chapman@ncdenr.gov> Subject: RE: Onslow Bridge #54 end bent stabilization All, It appears to us that this project will require written approval from DWR. Please submit the application electronically using the following link: https://deq.nc.gov/about/divisions/water-resources/water-quality- permitting/transportation-permitting/transportation-permitting-applications-and- forms. Thanks, Kristi Lynn Carpenter 919.707.8785 From: Steenhuis, Joanne Sent: Monday, November 20, 2017 5:02 PM To: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov> Subject: FW: Onslow Bridge #54 end bent stabilization Kristi Lynn, Here is a project that needs to get a BIMS number. I am pretty sure it is a non-notifying for us. From: Westphal, Anneliese Sent: Friday, November 17, 2017 4:22 PM To: Lane, Stephen <stephen.lane@ncdenr.gov> Cc: Shaver, Brad E SAW <Brad.E.Shaver@usace.army.mil>; Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>; Herndon, T. Mason <tmherndon@ncdot.gov> Subject: Onslow Bridge #54 end bent stabilization Stephen, Today I mailed a hard copy of a cover letter and permit application for the subject bridge via the courier to your office. An electronic copy of the letter and application are attached to this email. The green cards from the property owners were returned to my office today, and they were included with the hard copy. Bridge maintenance has everything lined up to start this project on Monday, December 4, 2017. Therefore, please let me know if the permit can be issued by then and if you thst are available the week of November 27 – December 1 for an onsite preconstruction meeting. Thank you so much, Anneliese Anneliese Westphal Environmental Specialist Division 3 NCDOT- Division of Highways 910 341 2000 office 910 675 0143 fax awestphal@ncdot.gov 3 5501 Barbados Blvd Castle Hayne, NC 28429-5647 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 4