HomeMy WebLinkAbout20171501 Ver 1_RE Onslow Bridge #54 end bent stabilization_20171121
Carpenter,Kristi
From:Carpenter,Kristi
Sent:Tuesday, November 21, 2017 1:36 PM
To:Westphal, Anneliese; Lane, Stephen;
'brad.e.shaver@usace.army.mil'; Mason, James S
Cc:Steenhuis, Joanne; Chapman, Amy
Subject:RE: Onslow Bridge #54 end bent stabilization
Anneliese,
The NW3 has to meet several conditions in order to not require a written approval. You
can use the following link to view all the thresholds and circumstances that would need
to be met in order for approval to not be required.
http://edocs.deq.nc.gov/WaterResources/0/doc/493391/Page1.aspx
After reading page 5 of the provided DCM application it sounded to me as though there
would be enough impact to trigger written notification. Sending in an electronic PCN
would give us the information needed to make a solid determination on whether the
written approval is necessary. Due to this project being in conjunction with a CAMA
project additional fees would not be charged for the approval if needed.
Thanks,
Kristi Lynn
From: Westphal, Anneliese
Sent: Tuesday, November 21, 2017 1:19 PM
To: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>; Lane, Stephen
<stephen.lane@ncdenr.gov>; 'brad.e.shaver@usace.army.mil'
<brad.e.shaver@usace.army.mil>; Mason, James S <jsmason@ncdot.gov>
Cc: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>; Chapman, Amy
<amy.chapman@ncdenr.gov>
Subject: RE: Onslow Bridge #54 end bent stabilization
Hi Kristi Lynn,
Could you please explain what the trigger is for written approval from DWR?
Thank you,
Anneliese
Anneliese Westphal
Environmental Specialist
Division 3
NCDOT- Division of Highways
910 341 2000 office
910 675 0143 fax
awestphal@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429-5647
1
From: Carpenter,Kristi
Sent: Tuesday, November 21, 2017 10:19 AM
To: Westphal, Anneliese <awestphal@ncdot.gov>; Lane, Stephen
<stephen.lane@ncdenr.gov>; 'brad.e.shaver@usace.army.mil'
<brad.e.shaver@usace.army.mil>; Mason, James S <jsmason@ncdot.gov>
Cc: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>; Chapman, Amy
<amy.chapman@ncdenr.gov>
Subject: RE: Onslow Bridge #54 end bent stabilization
All,
It appears to us that this project will require written approval from DWR.
Please submit the application electronically using the following link:
https://deq.nc.gov/about/divisions/water-resources/water-quality-
permitting/transportation-permitting/transportation-permitting-applications-and-
forms.
Thanks,
Kristi Lynn Carpenter
919.707.8785
From: Steenhuis, Joanne
Sent: Monday, November 20, 2017 5:02 PM
To: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>
Subject: FW: Onslow Bridge #54 end bent stabilization
Kristi Lynn,
Here is a project that needs to get a BIMS number. I am pretty sure it is a non-notifying
for us.
From: Westphal, Anneliese
Sent: Friday, November 17, 2017 4:22 PM
To: Lane, Stephen <stephen.lane@ncdenr.gov>
Cc: Shaver, Brad E SAW <Brad.E.Shaver@usace.army.mil>; Steenhuis, Joanne
<joanne.steenhuis@ncdenr.gov>; Herndon, T. Mason <tmherndon@ncdot.gov>
Subject: Onslow Bridge #54 end bent stabilization
Stephen,
Today I mailed a hard copy of a cover letter and permit application for the subject
bridge via the courier to your office. An electronic copy of the letter and application are
attached to this email.
The green cards from the property owners were returned to my office today, and they
were included with the hard copy.
Bridge maintenance has everything lined up to start this project on Monday, December
4, 2017. Therefore, please let me know if the permit can be issued by then and if you
2
thst
are available the week of November 27 – December 1 for an onsite preconstruction
meeting.
Thank you so much,
Anneliese
Anneliese Westphal
Environmental Specialist
Division 3
NCDOT- Division of Highways
910 341 2000 office
910 675 0143 fax
awestphal@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429-5647
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
3