Loading...
HomeMy WebLinkAbout20081811 Ver 1_More Info Received_20090122C)2- 18<< January 20, 2009 North Carolina Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 RE: Plan revision per review comments 0 Winstonsalem Public Works Department Engineering Division City of Winston-Salem P.O. Box 2511 Winston.Salem, NC 27102 Tel 336.727.8000 Fax 336.727.2361 www.cityofws.org Application for 401 Water Quality Certification for the replacement of culvert as part of the road widening improvements to SR 1686 (Shattalon Drive) Forsyth County, North Carolina. City Project No. 200502. Dear Sir or Madam: In December 2008, the City of Winston-Salem submitted Pre-construction Notification for replacing an existing pipe culvert. This plan revision is in response to phone conversation with Amy Euliss with the NC-DWQ Winston-Salem regional office. Please find the enclosed copies of the Permit drawing, design plan sheet and construction detail for the above referenced project. The plan revision shows the pipe culvert outlet shifted and rotated to more align with stream. Please call me at 747-6833 with any questions. Sincerely, ENGINEERING DIVISION JAN 2 2 2009 ?w /PWI Todd Love, P.E. Project Engineer Cc: Amy Euliss-NCDWQ Winston-Salem of Nk - WATER UUAUTY vv j MRMWATER BRANCH n8-1$11 I JAN 2 2 2009 Q DENR - WATER. DUALITY WETLANDS AND STORMWATER BRANCH Q _ U Q D z o m U X I- Q W -?-? z W D w m _m12 o W o z o v ? D ® Q n c - m I _ " X N W PROJECT DESCRIPTION Impacts to waters of the United States The project is located in the Yadkin River Basin in Forsyth County. Water resources in the area include Mill Creek and Bethabra Branch. Bethabra Branch is a perennial stream that flows north to south within the project boundaries. Bethabra Branch is a tributary to Mill Creek and does not have an assigned Stream Index Number by the N.C. Division of Water Quality. Neither High Quality Waters (HQW), Water Supplies (WS-I or WS-II) occur within 1.0 mile of the project area. Permanent Impacts There will be a total of 117 linear feet (LF) of permanent stream impacts to Bethabra Branch (BB). These impacts are associated with the removal of 40 LF of an existing 12' by 8' arch pipe culvert and placement of an 89 LF of 15' by 9' arch pipe culvert where BB crosses the roadway. Of the 117 linear feet, 50 linear feet will be due to the replacement of the existing culvert and placement of fill to construct the culvert. The remaining 67 LF of permanent impacts will result from Class I rip rap on the stream banks at the pipe inlet and outlet. Temporary Impacts A total of 25 linear feet (LF) of temporary stream impacts will occur to Bethabra Branch. These impacts are associated with the placement of the new pipe culvert. A temporary impervious dike will be installed at the in-flow and out-flow sides of the pipe culvert for the purpose of diverting stream flow around or through the construction site. The outlet channel will be benched to reduce channel erosion for high flows. Proiect Schedule The project is scheduled for letting in May of 2009 and date of construction availability of July 2009. It is anticipated that the culvert construction will be completed during the summer while school systems are on summer break. REV 1/15/2009 0 Z_ Q ry C . - 3 ? ( l ? I LLJ ? yr , L i w ? t ?5 ( # I 27mio i zsm -------------- r l l ? F? ? / $RP BRP? ,SNP i 'r" l GNP pp,? .- -'" gR? VE P r- PvEN ?,,,_ 1 i i. W Z 4 ig a i UWG Z U? as a ?I z Y ci Oh O r? oil l a? m I IS S _.-BRIG ESE A W W I i I W 1 + 1 + i ? I e ! v f f! ? +I t I ?I 1 1 !r 9-B 1A`M fl (P ?? .;fi g II JJdd t ! I I ? I I W to .° REV i IY ¢.i / -j • ? W ? Q ?z o I3 W I W gig I' W ? ? !I I I 'I $ j till W i• r 1 ?? !I I I i ? f! if i i (/ ; JI S ! } I { + it * ! I a ?I + (I t rr ? I + W !I. ! W i + 0 I O? O R ? at