HomeMy WebLinkAbout20081868 Ver 1_Staff Comments_20090109
4"A {)f- Iy~g
~CDE~R
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F, Easley, Governor James H. Gregson, Director William G, Ross Jr" Secretary
December 19, 2008
MEMORANDUM:c-,-,
TO: Joanne Steenhuis
401 Wetlands
Division of Water Quality - WiRO
FROM: Doug Huggett, NC DENR-DCM Major Permits Coordinator
400 Commerce Ave" Morehead City, NC 28557 (Courier 11-12-09)
SUBJECT: CAMA / Dredge & Fill Major Permit Application Review
Applicant: Donald Caison
Project Location: Lot 1, Mallard Drive, adjacent to a canal off the AIWW, Hampstead, NC,
Pender Co.
Proposed Project: construct a single-family residence, excavate an upland boat basin, install a
bulkhead, construct a pier and install two boat lifts
Please indicate below your agency's position or viewpoint on the proposed project and return
this form by January 14, 2009. If you have any questions regarding the proposed project,
contact Heather Coats at (910) 796-7424, when appropriate, in-depth comments with supporting
data is requested.
This agency has no comment on the proposed project.
~ e '-~
w)t{~ 1-'1-0/
Jlf .s
REPLY:
X This agency has no objection to the project as proposed,
This agency approves of the project only if the recommended changes are
incorporated, See attached.
This agency objects to the project for reasons described In the attached
comments,
SIGNED
\J-.. .-=-' {- __ \/'
/(, ,'-.-.,
. .
A ,/\./i..~~-i
DATE
c'
-,1
,/r'l
"-'~
i
1-)-. \ C L -; ,. \ \ "0
127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845
Phone: 910-796-7215 \ FAX: 910-395-3964 \ Internet: www.nccoastalmanagement.net
An Equal Opportunity I Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper