Loading...
HomeMy WebLinkAbout20161079 Ver 1_Correspondence_20191108Strickland, Bev From: Homewood, Sue Sent: Wednesday, November 08, 2017 4:15 PM To: 'Bailey, David E CIV USARMY CESAW (US)'; Joey Lawler Cc: Philip Rumley Subject: RE: [External] RE: Follow-up to PNG Southern Alamance Project Joey, The Division appreciates the efforts made to bring the site back in compliance with the 401. No further action is necessary at this time. I will send a formal NOV resolution letter but it'll probably take me a couple weeks to get it out. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood @ ncden r.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Bailey, David E CIV USARMY CESAW (US)[mailto:David.E.Bailey2@usace.army.mil] Sent: Wednesday, November 08, 2017 3:53 PM To: Joey Lawler <JLawler@smeinc.com>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Philip Rumley <philip.rum ley@pied montng.com> Subject: [External] RE: Follow-up to PNG Southern Alamance Project CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. Thanks Joey. The Corps considers the previously noted permit non-compliance issues resolved; no further action required from the Corps. Thanks for your detailed response and pictures. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE -SAW -RG -R 1 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David. E. Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. -----Original Message ----- From: Joey Lawler [mailto:JLawler@smeinc.com] Sent: Monday, October 30, 2017 1:18 PM To: Homewood, Sue (sue.homewood@ncdenr.gov) <sue.homewood@ncdenr.gov>; Bailey, David E CIV USARMY CESAW (US)<David.E.Bailey2@usace.army.mil> Cc: Philip Rumley <philip.rum ley@pied montng.com> Subject: [EXTERNAL] Follow-up to PNG Southern Alamance Project Sue and David - please see the attached letter from my follow-up visit to the PNG Southern Alamance site. The work described in our original response letter has been completed. Please let me know if you need anything else -j Joey Lawler, PWS Natural Resources Project Manager <Blockedhttp://www.smeinc.com/> S&ME 9751 Southern Pine Blvd. Charlotte, NC 28273 map <Blockedhttp://maps.google.com/maps?q=9751%20Southern%20Pi ne%20BIvd%2CCharlotte%2CNC%2C28273%2CU nite d % 20States> O: 704.523.4726 M: 704.604.6474 Blockedwww.smeinc.com <Blockedhttp://www.smeinc.com/> Linkedln <Blockedhttps://www.linkedin.com/company-beta/43081/> I Twitter <Blockedhttps://twitter.com/sme_engineering> I Facebook <Blockedhttps://www.facebook.com/sme.engineeri ng/> This electronic message is subject to the terms of use set forth at Blockedwww.smeinc.com/email <Blockedhttp://www.smeinc.com/emai1> . If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email.