Loading...
HomeMy WebLinkAbout20150539 Ver 3_Approval Letter_20171120Water Resources ENVIRONMENTAL QUALITY November 20, 2017 Donald C. Adams 1340 Old Drug Store Road Garner, NC 27529 ROY COOPER Gave ,er MICHAEL S. REGAN Secretary LINDA CULPEPPER lawim Director DWR #15-0539 v3 Johnston County Subject: AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER BASIN RIPARIAN BUFFER PROTECTION RULES (15A NCAC 026.0233) WITH ADDITIONAL CONDITIONS Parkview Subdivision Phase 14 Dear Mr. Adams: You have our approval for the impacts listed below for the purpose described in your application dated October 22, 2017 and received by the Division of Water Resources (Division) on October 26, 2017. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This Authorization Certificate shall expire five (5) years from the date of this letter. This approval requires you to comply with the following conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Buffer Rules are met. No other impacts are approved, including incidental impacts [15A NCAC 02B. 0233(8)]. Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Buffers—Zone 1 133: Utility Corridor 639 (square feet) 0 (square feet) Buffers — Zone 2* B2: Road & retaining wall 1349 (square feet) 0 (square feet) 133: Utility Corridor 426 (square feet) 0 (square feet) Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http://portal.ncdenr.org/web/wq/aps 1628 Mail Service. Center, Raleigh, NC 27699-1628 Phone: (919) 791-4200 Location: 3800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788-7159 Parkview Subdivision Phase 14 DWR #15-0539 v3 BUFFER APPROVAL Page 2 of 4 *Buffer impact B1 listed on the application as minor grading in Zone 2 is considered exempt and does not require written authorization from the Division provided that diffuse flow and the health of existing vegetation in Zone 1 is not compromised and disturbed areas are stabilized. 2. Stormwater Management Plan (SMP) Approval from Local Community Required The stormwater management plan (SMP) must be approved by Johnston County and meet the requirements of this Certification. The SMP may not be modified without prior written authorization from Johnston County. [15A NCAC 02H .0506(b)(3)] 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur [15A NCAC 02H .0501 and .0502]. 4. Protective Fencing All wetlands, streams, surface waters, and riparian buffers located within 50 feet of the construction area on the project site shall be clearly marked (example- orange fabric fencing) prior to any land disturbing activities and must be maintained on the property until the project phase is completed. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H .0507 (c)] 5. This approval is forthe purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Buffer Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and is responsible for complying with all conditions. 6. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Buffer Authorization can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). Parkview Subdivision Phase 14 DWR #15-0539 v3 BUFFER APPROVAL Page 3 of 4 The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending by First Class Mail via the US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (e.g. UPS, FedEx): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Please send one (1) copy of the petition to DWR: If sending by First Class Mail via the US Postal Service: Karen Higgins NCDWR-401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (e.g. UPS, FedEx): Karen Higgins NCDWR-401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 This letter completes the review of the Division under the Neuse Riparian Buffer Rules as described in 15A NCAC 02B .0233. Please contact Stephanie Goss at 919-791-4256 or Stephanie. Goss@ncdenr.gov if you have any questions or concerns. Si erel . A/ Gil (i Danny Smit Supervisor, Water Quality Regional Operations Section Parkview Subdivision Phase 14 DWR #15-0539 v3 BUFFER APPROVAL Page 4 of 4 cc: DWR RRO 401/Buffer file DWR 401 & Buffer Permitting Unit file via Laserfiche Jamie Guerrero via e-mail at iamieguerrerope@gmail.com