Carpenter,Kristi
From:Wanucha, Dave
Sent:Wednesday, November 15, 2017 9:51 AM
To:Hiatt, Todd M
Subject:RE: R-2915C US 221 project review_follow-up
Hey Todd,
I’ve got meetings all day tomorrow on the W-S Outerbelt. Thanks for keeping me in the
loop on this one and let me know how it goes tomorrow. I’m especially curious how the
inlet repair and adjacent area at Site 10 (346 RT) was finalized. I’ll visit the project
sometime in December. Thanks again.
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Hiatt, Todd M
Sent: Wednesday, November 15, 2017 9:32 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: Slaughter, Johnathan H <hslaughter@ncdot.gov>; Poindexter, David A
<dpoindexter@ncdot.gov>; winkler, jeffrey d <jdwinkler@ncdot.gov>; Johnston,
Gregory W <gjohnston@ncdot.gov>
Subject: RE: R-2915C US 221 project review_follow-up
Dave,
I am going to do the follow-up inspection for the ICA extension tomorrow. My plan is to
be at the field office around 10:00AM. I was notified yesterday that all of the items on
the previous inspection reports had been completed. Please let me know if you would
like to attend.
Thanks,
Todd Hiatt, PE
1
Roadside Environmental Field Operations Engineer – Divisions 11 and 12
Roadside Environmental Unit
NC Transportation
336-679-3417 office
tmhiatt@ncdot.gov
1636 Shacktown Road
Yadkinville, NC 27055
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Wanucha, Dave
Sent: Thursday, November 09, 2017 10:07 AM
To: Chapman, Amy <amy.chapman@ncdenr.gov>
Cc: Kichefski, Steven L SAW <Steven.L.Kichefski@usace.army.mil>; Slaughter, Johnathan
H <hslaughter@ncdot.gov>; Latham, Tim <tim.latham@ncdenr.gov>; Hiatt, Todd M
<tmhiatt@ncdot.gov>; Johnston, Gregory W <gjohnston@ncdot.gov>
Subject: R-2915C US 221 project review_follow-up
Amy,
Yesterday, we reviewed EC measures and sediment loss cleanup efforts around most of
the problem areas per Todd Hiatt’s recent ICA 9 (attached). Recent intense storm
events caused flooding and many EC measures were blown out including those at waste
pit/slope sites. Given the weather conditions, DOT staff/contractors are doing the best
they can, but much more needs to be done. I agreed with Todd and Tim Latham
(NCDMLR) that the project should not resume operations until EC measures are
repaired/installed and JS areas cleaned as directed by Roadside staff, NCDMLR and
myself. Greg Johnston, DOT on-site project engineer representative, agreed. A few
pictures are attached (Site 10 inlet picture is Station 346 RT per Todds attached report).
Dave W.
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
2
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
3