HomeMy WebLinkAbout20171493 Ver 1_Build Maps_20171120S
ST
T
T
T
T
FMV
FMV (2)E(2)EMETER
ELEC
VAULT
FM
METERELEC
(TS)
(TS)
FO
FOFO
FO
INNERDUCT
3"3"CCC
THIS STRUCTURERECORDS FOUND FORNO ASSOCIATEDFIBER PEDESTAL DESTROYED
FOR THIS WATER VALVE
OR UTILITY LINES FOUND
NO ASSOCIATED RECORDS
vvvvvvvvvv
COLUMN
STONE
COLUMN
STONE
LT LT
24" CURBMAXWELL DR. 19’ BSTCOLUMN
STONE
COLUMN
STONE24" CURBHARKERS POINT DR. 19’ BST10’ SOILSPARKS RD. 9’ GR.SPOSTS
WD
POSTS
WD
GR.
GR.
GR.
GR.
GR.
RIP RAP
RIP RAP
GUY
INV=0.98’
INV=3.50’BS-1BS-21
0
8 112
1
13
1
1
9
1
2
0
WOODED
WOODED
WOODED
WOODED
WOODED
WOODED
WOODED
WOODED
WOODED
WOODED
SCRUB
SCRUB
SCRUB & MARSH
PUBLIC BEACH ACCESSEIPEIP
EIPEIPEIPEIPWH CNOC WH CNOC
ELEV=5.70’
156’ RT
-BL- STA. 16+91
BM1
ELEV=3.47’NGS "TIDAL 3"
ELEV=14.20’NGS "TIDAL 2"
HARKERS ISLAND RD. 20’ BST
SR1335
17DETAIL SHOWING PAVEMENT - BRIDGE RELATIONSHIP (NOT TO SCALE)
-L-
TYPE-III
TYPE-III
GREU 350, TL-3
BRIDGE APPROACH SLAB
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4 B-4863 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PAVEMENT REMOVAL MATCH TO SHEET 5 -L- STA. 22+00-L- STA. 18+75 +/-
BEGIN BRIDGE
4’PS24’PS4’-DRIVE- POT Sta. 10+00.00
-Y- POT Sta. 10+00.00
-L- POI Sta. 15+50.00
FOR -L- PROFILE, SEE SHEET NO. 8
FOR -Y- PROFILE, SEE SHEET NO. 12
FOR -DRIVE- PROFILE, SEE SHEET NO. 12
-L- STA. 18+60 +/-
BEGIN APPROACH SLAB
CLR RDWY
32’
AT-1AT-1 0401000102030302010032’4’PS24’4’PS034’PS24’4’PS(AVG. HT. 13’)
PROPOSED RETAINING WALL
101520-DRIVE- Sta. 11+40.00
END CONSTRUCTION
B-4863 -L- Sta. 10+00.00
BEGIN PROJECT
-Y- Sta. 11+30.00
END CONSTRUCTION
-L--Y--EVIR
D-20’-Y--EVIRD
-
NAD 83/ NA 2011
INNERDUCT
INNERDUCT
FO
BOX
ELEC
FOR THIS WATER VALVE
OR UTILITY LINES FOUND
NO ASSOCIATED RECORDS
PA
CONC
HOUSETENDERBRIDGE
1SF WD FENDER SYSTEMGUY
GUY GUY
GUY
GUY
GUY BS-3BS-4WD FENDER SYSTEMGUY
GUY
WH CNO
CWH CNOCWD PI
VOT PI
ER FENDER SYSTEMBRIDGE NO.73
"TI
DAL FLOW"THE STRAI
TS"TI
DAL FLOW"THE STRAI
TSFOR -L- PROFILE, SEE SHEET NO. 9
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
5 B-4863 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
MATCH TO SHEET 4 -L- STA. 22+00MATCH TO SHEET 6 -L- STA. 35+00000102TANGENT SECTION ON BRIDGE
TRANSITION LOCATED WITHIN
PROPOSED SUPERELEVATION 253035-L- PC Sta. 22+52.22
ELEV. 54.60’
STA. 27+61.76
-L- HIGH POINT RDWYCLR32’-L-
DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED
CLEARANCE TO PROPOSED BRIDGE
40’ WIDE WORK BRIDGE WITH 10’
TEMPORARY CONSTRUCTION EASEMENT FOR31’90’UNLESS ALL SIGNATURES COMPLETED
NAD 83/ NA 2011
INNERDUCT
INNERDUCT
FO
FO
FO
S
BOX
ELEC
(TS)
GR.
GR.
GR.
BST
84" WD PIER
STRAITS FISHING PIER
CARTERET CO. PARKS & RECREATION
R
IP RA
P
RIP RAP
RIP RAP
RIP RAPBS-3BS-4BS-5BS-6BS-7BS-8SCRUB & MARSH
SCRUB & MARSH
STATE OF NORTH CAROLINA
STATE OF NORTH CAROLINANDR
NDR
SR 1335 HARKERS ISLAND RD. 20’ BST
WH CN
OC
WH CNOC
WH CNOCWH CN
OCBRIDGE NO.96OVERHEAD POWERLI
NE ELEVATI
ONDOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
6 B-4863 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
MATCH TO SHEET 5 -L- STA. 35+00MATCH TO SHEET 7
-L-
STA. 48+00FOR -L- PROFILE, SEE SHEET NO. 10 020100010203TANGENT SECTION ON BRIDGE
TRANSITION LOCATED WITHIN
PROPOSED SUPERELEVATION354045-L- PT Sta. 46+49.23
-L-35RDWYCLR32’DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED
NAD 83/ NA 2011
T
T T
C
MARKER
FIBER
FO
FO
FO
FO
INNERDUCTINNERDUCTINNERDUCT
C
INNERDUCT
vv RUI
NSPONDPONDSR 1335 HARKERS ISLAND RD. 20’ BSTRIP RAP
RIP RAP
LT
72" WD PIER
72" WD PIER
96" WD FLOATING DOCK
BOAT RAMPCONC
PVC
SEAWALL PVC SEAWALLRETENTION SYSTEM
CONC STORM WATER
24" C&G 24" C&GBST PA
S
LT
6
0
" WD36" WD
BST
BST
LT
LT
GR.36" WD36" WD15" RCP 15" RCP
8’ GR.18’
GR.
BST BSTCONC
1SFBUS
1SBLKBUS
GUY
GUY
GUY
GUY
GUY
GUY
1
26
12
8
1
2
9
1
3
0
1
3
3
WOODED
1SFD
SCRUB
SCRUB
PVC SEA
WALLPVC SEA
WALLPVC SEAWALL36" WOOD RAIL
36" WOOD RAIL
EIP
EIP
EIP
EIP
1SFD60.00’EXISTING R/W
EXISTING R/W
H
T
R
G
ELEV=3.88’
222’ RT
-BL- STA. 54+28
BM2
58
S1-
1
5
9S
2
-
1
6
0S2
-
2 CONFLUENCE S1
6
1
6
2
S2
-
3
6
7S1-
3
6
8
S1-
4 S2
-
2 50DETAIL SHOWING PAVEMENT - BRIDGE RELATIONSHIP (NOT TO SCALE)
-L-
TYPE-III
TYPE-III
GREU 350, TL-3
BRIDGE APPROACH SLAB
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
7 B-4863 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PAVEMENT REMOVAL 4’PS24’PS4’MATCH TO SHEET 6
-L-
STA. 48+00GREU 350, TL-3
FOR -L- PROFILE, SEE SHEET NO. 11 CLR RDWY
32’
-L- STA. 50+75 +/-
END BRIDGE
-L- STA. 50+90 +/-
END APPROACH SLAB
(AVG. HT. 8.5’)
PROPOSED RETAINING WALL50 5560-L- PC Sta. 48+02.21
-L- PT Sta. 54+03.19
-L- POT Sta. 62+14.98
0302000101010201020132’4’PS24’4’PS-L-
-L-
B-4863 STA. 55+05.00
END PROJECT
0302-L-
NAD 83/ NA 2011