Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
November 25, 2017 Ver 2.1
*
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are ans�red.
Below is a link to the online help file.
http://edocs.deq.nc.gov/WaterResources/0/doc/603610/Page1.aspx
A. Processing Information
County(or Counties) where the project is located:*
Gaston
Is this project a public transportation project? (?)
r Yes C' No
Is this a NCDOT Project?
C� Yes C' No
(NCDOT only) T.I.P. or state project number:
W-5212N
WBS #
(for NCDOT use only)
1a. Type(s) of approval sought from the Corps:
I7 Section 404 Permit (wetlands, streams and waters, Clean Water Act)
� Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
�J Nationwide Permit (NWP)
r Regional General Permit (RGP)
Nationwide Permit (NWP) Number:
NWP Number Other:
List all MN nurrbers you are applying for not on the drop dow n list.
14 - Linear transportation
1c. Type(s) of approval sought from the DWR:*
check all that apply
rJ 401 Water Quality Certification - Regular
r Non-404 Jurisdictional General Permit
r 401 Water Quality Certification - E�ress
r Riparian Buffer Authorization
*
1d. Is this notification solelyfor the record because
written approval is not required?
For the record only for DWR 401 Certification: C' Yes C•' No
For the record only for Corps Permit: C' Yes r No
1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
If so, attach the acceptance letter from rritigation bank or in-lieu fee program
C' Yes C•' No
i 1f. Is the project located in anyof NCs twentycoastal counties?*
C' Yes �' No
1h. Is the project located in a designated trout watershed?*
C� No
C' Yes
Link to trout information: http://v�uwv.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx
B. Applicant Information
1a. Who is the Primary Contact?*
Trish Beam
1b. Primary Contact Email:*
pdbeam@ncdot.gov
1c. PrimaryContact Phone:*
(xxx)xxx-xxxx
(980)552-4218
1d. Who is applying for the permit?
� Owner rJ Applicant (other than owner) r AgenUConsultant
(Check all that apply)
2. Owner I nformation
2a. Name(s) on recorded deed:
2b. Deed book and page no.:
2c. Responsible party:
(for Corporations)
2d.Address
Street Address
Address Line 2
��
F�stal / Zip Code
2e. Telephone Number:
(xxx)xxx-xxxx
2f. Fax Number:
(xxx)xxx-xxxx
2g. Email Address:*
State / Rovince / Region
Country
mstafford@ncdot.gov
3. Applicant Information (if different from owner)
3a. Applicant is:
C' Agent
C� Other �ivision 12 tngineer
If other please specify.
3b. Name:
Mark Stafford
3c. Business Name:
(if applicable)
3d. Address
Street Address
1710 East Marion Street
Address Line 2
��
Shelby
Fbstal / Zip Code
28151
3e. Telephone Number:
(xxx)xxx-xxxx
3f. Fax Number:
(xxx)xxx-xxxx
3g. Email Address:*
mstafford@ncdot.gov
State / FYovince / F�gion
North Carolina
Country
United States
C. Project Information and Prior Project History
1. Project Information
1a. Name of project:*
Hwy 279 Widening/Improvements
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality/town:*
Between Cherryville and Dallas
1d. Driving directions*
If it is a new project and can not easily be found in a C�5 rrapping system Rease provide directions.
From Cherryville, follow Hwy 279 to first section starting at St Marks Church Road (SR 1438) to just past Whitesides Road (SR 1624);
second section begins at Besstown Road (SR 1446) to just past Long Shoals Road (SR 1609); third section begins at Davis Creek Court
(SR 1764) to just past Ashbrook Park Road (SR 1602); fourth section begins at White Jenkins Road (SR 1456) to just past Camp Sertoma
Road (private road)
2. Project Identification
2a. Property Identification Number:
(tax RN or parcel ID)
2b. Propertysize:
(in acres)
2c. Project Address
Street Address
Address Line 2
Qty
Fbstal / Zip Code
2d. Site coordinates in decimal degrees
State / FYovince / F�gion
Country
Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as
appropriate, based on howthe location was determined. (For e>cample, most mobile phones with GPS provide locational precision in decimal degrees to
map coordinates to 5 or 6 digits after the decimal place.)
I Latitude:*
Permit site 1)35.364660; Permit site 2)
35.337627; Permit site 3) 35.336138;
Permit site 4) 35.325291
ex:34.208504
3. Surface Waters
Longitude:*
1) -81.316432; 2) -81.233548; 3) -
81.232894:4)-81.227103
-77.796371
3a. Name of the nearest body of water to proposed project:*
Little Beaverdam Creek; Little Long Creek
3b. Water Resources Classification of nearest receiving water:*
Little Beaverdam Creek - WS-IV watershed; Little Long Creek - Class C
Surface Water Lookup
3c. What river basin(s) is your project located in?*
Catawba
RiverBasin Lookup
4. Project Description
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Paved NC highway; General land use in the vicinity of the permit sites are cropland and pasture
4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for
DWR)
Gick the upload button or drag and drop files here to attach docurrent
topo_area4_8.pdf 136.07KB
topo_area9_13.pdf 89.17KB
topo_area14_16.pdf 78.13K6
topo_area 17_22. pdf 126.17KB
Fle type rrust be pdf
4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.
(for DWR)
C7ick the upload button or drag and drop files here to attach docurrent
Little_Beaverdam_Crk_soilmap.pdf
Little_Long_Crk_soilmap. pdf
Unnamed_tributary_soilmap.pdf
Fle lype rrust be pdF
4d. List the total estimated acreage of all existing wetlands on the property:
0.07
4e. List the total estimated linear feet of all existing streams on the property:
(interrrdtent and perennial)
250
4f. Explain the purpose of the proposed project:
Roadway widening in four areas along Hwy 279 by the addition of a third travel lane
584.55KB
884.17KB
381.7KB
4g. Describe the overall project in detail, including the type of equipment to be used:
4h. Please upload project drawings for the proposed project.
Gick the upload button or drag and drop files here to attach docurrent
W5212N 25% Roadway Plansheets.pdf
W-5212N hyd_Permit_Drawings_2017-06-20.pdf
W-5212N Erosion Control Culvert Construction.pdf
Fle type rrust be pdf
5. Jurisdictional Determinations
5.75M6
4.85M6
3.03M6
5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?*
r Yes C' No �' Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made? *
C� Preliminary l" Approved C' Unknown
Corps AID Number:
Exarrple: SAV�2017-99999
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Othe r:
Carolina Ecosystems
l" N/A
5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5d1. Jurisdictional determination upload
aick the upload button or drag and drop files here to attach docurrent
W5212N_JD_draft_signed.pdf
Fle type rrust be FDF
6. Project History
32.74MB
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
r Yes r No r Unknown
7. Future Project Plans
7a. Is this a phased project?*
C' Yes C•' No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the
proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the
Army authorization but don't require pre-construction notification.
D. Proposed I m pacts I nventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
r7 Wetlands r% Streams-tributaries r Buffers
r Open Waters r Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. Site # - Reason for
impact *
3) 18" RCP Fill
N�p label (e.g. F�ad Qassing 1)
3) 18" RCP Mechanized
clearing
N�p label (e.g. 13�ad CXossing 1)
3) 15" CSP Mechanized
clearing
fv�p label (e.g. Id�ad Q�ossing 1)
4) 30" RCP
N�p label (e.g. Fd�ad Q-ossing 1)
4) 30" RCP Mechanized
clearing
N�p label (e.g. 13�ad CXossing 1)
2b. Impact type * 2c. Type of wetland *
P Bottomland Hardwood
F�rrranent (Pj or Teriporary Forest
��
P Bottomland Hardwood
F2rrranent (F) or Terrporary Fol'est
��
P Bottomland Hardwood
F2rrranent (P� or Terrporary FOPeSt
��
P Headwater Forest
F2rrranent (P� or Terrporary
��
P Headwater Forest
F2rrrenent (P� or Terrporary
��
2g. Total Temporary Wetland Impact
0.000
2g. Total Permanent Wetland Impact
0.070
2g. Total Wetland Impact
0.070
2h. Comments:
2d. Wetland name * Ze. 2f. 2g. Impact
Forested* Jurisdiction area*
type *
WA No Both 0.010
(404, 10) or d�NR (acres)
(401, other)
WA No Both 0.030
(404, 10) or CNVR (acres)
(401, other)
WA
WC
WC
No Both 0.010
(404, 10) or DJVR (acres)
(401, other)
Yes Both 0.010
(404, 10) or d�NR (acres)
(401, other)
Yes Both 0.010
(404, 10) or CTJVR (acres)
(401, other)
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites
impacted.
3a. Site #- Reason 3b.lmpact 3c. Type of 3d. Stream name *
for impact* type* impact*
1) Upstream P Bank Little Beaverdam Creek
floodplain F�rrranent(P� Stabilizati
bench/Riprap (�Terrporary on
bank stabilization
fv�p label (e.g. Finad
Qossing 1)
1) Triple RCBC P Culvert Little Beaverdam Creek
F�ctension F�rrranent(P�
fv�p label (e.g. Fd�ad or Terrporary
Qossing 1) �T�
1) Upstream P Bank Little Beaverdam Creek
Floodplain F�rrranent(Fj Stabilizati
Bench/Riprap (�Terrporary on
bank stabilization
N�p label (e.g. F�ad
CYossing 1)
1) Temporary T Dewaterin Little Beaverdam Creek
Dewatering for F2rrranent(Pj g
Culvert orTerrporary
extension/floodpla ��
in bench
construction
fv�p label (e.g. 13�ad
trossing 1)
1) Riprap Bank P Bank UTto Little Beaverdam
Stabilization F�rrranent(� Stabilizati Creek
N�p label (e.g. Road (�Terrporary On
Qossing 1)
1) Temporary T Dewaterin UTto Little Beaverdam
Dewatering for F�rrranent(P� g Creek
Riprap bank aTerrporary
stabilization ��
N�p label (e.g. Finad
Qossing 1)
2) Downstream P Rip Rap Little Long Creek
Floodplain bench �rrranent(�j Fill
construction/cons orTerrporary
tructed ��
glide/Riprap bank
stabilization
N�p label (e.g. I�ad
Qossing 1)
2) Double RCBC P Culvert Little Long Creek
Extension F2rrranent(F'�
fv�p label (e.g. Id�ad or Terrporary
Qossing 1) ��
2) Upstream P Rip Rap Little Long Creek
Floodplain bench F�rrrenent(P� Fill
construction/cons orTerrporary
tructed ��
glide/Riprap bank
stabilization
N�p label (e.g. Fd�ad
CYossing 1)
3e. Stream Type * 3f. 3g. Stream 3h. Impact
Jurisdictior�idth* length*
type *
Perennial Both 11 24
F�rennial (FS2) or interrrittent Average (feet) (linear feet)
(IfM
Perennial Both
F2rennial (� or interrrittent
(IfVT)
Perennial Both
F2rennial (Fff�) or interrrittent
(If�
Perennial Both
F2rennial (Fff2) or interrrittent
(If�
Perennial Both
F�rennial (F�2) or interrrittent
(If�
Perennial Both
F2rennial (F$2) or interrrittent
(If�
Perennial Both
F2rennial (FS2) or interrrittent
(IfM
Perennial Both
F2rennial (F8� or interrrittent
QfVf)
Perennial Both
F�rennial (FS2) or interrrittent
(If�
11 26
Average (feet) (linear feet)
11 22
Average (feet) (linear feet)
11 45
Average (feet) (linear feet)
3 15
Average (feet) (linear feet)
3 22
Average (feet) (linear feet)
5 21
Average (feet) (linear feet)
5 24
Average (feet) (linear feet)
5 30
Average (feet) (linear feet)
3a. Site #- Reason 3b.lmpact 3c. Type of 3d. Stream name *
for impact* type* impact*
2) Temporary T Dewaterin Little Long Creek
Dewatering for F2rrranent(P� g
Culvel't orTerrporary
extension/floodpla ��
in bench
construction
N�p label (e.g. Road
Qossing 1)
4) 30" RCP P Culvert UTto Little Long Creek
extension F�rrranent(P�
N�p label (e.g. F�ad or Terrporary
Qossing 1) �T�
4) Bank P Bank UTto Little Long Creek
Stabilization F2rrranent(Fj Stabilizati
N�p label (e.g. Id�ad (�Terrporary On
Qossing 1)
3e. Stream Type * 3f. 3g. Stream 3h. Impact
Jurisdictior�idth* length*
type *
Perennial Both 5 29
F2rennial (F8� or interrrittent Average (feet) (linear feet)
(IfV�
Intermittent Both
�rennial (�) or interrrittent
(If�
Intermittent Both
F2rennial (Fff�) or interrrittent
(If�
4) Temporary T Dewaterin UTto Little Long Creek Intermittent Both
Dewatering F2rrranent (F) g F�rennial (� or interrrittent
N�p label (e.g. F�ad or Terrporary (IfV�
Qossing 1) ��
*� All Perennial or Intermittent streams must be verified by DWR or delegated local government.
3i. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts:
194
3i. Total temporary stream impacts:
107
3i. Total stream and tributary impacts:
301
3j. Comments:
2) The Floodplain bench construction, constructed glide, and Riprap bank stabilization are within the same stream
length impact area
1 22
Average (feet) (linear feet)
1 10
Average (feet) (linear feet)
1 11
Average (feet) (linear feet)
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list
all open water impacts below.
5. Pond or Lake Construction
If pond or lake construction is proposed, then complete the chart below.
6. Buffer Impacts (for DWR)
If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*
1.5:1 (rock plated) fill slopes were used throughout the project to limit impacts to jurisdictional streams and
wetlands. Preformed scourholes were used where practical at pipe outlets to dissipate energy and promote diffuse
flow. At jurisdictional stream crossings, bank stabilization was used and pipe slopes minimized to reduce flow
velocities.
A constructed glide will be installed at the double 7' x 8' RCBC extension to remedy the perched inverts of the
culvert.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:*
The proposed RCBC extension will be constructed utiliang impervious dikes and a pump and pipe operation.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
C' Yes
C•' No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1a. Does this project require a Stormwater Management Plan?
�' Yes
c' No
1b. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See stormwater management plan in attached HYD permit package
1c. What is the overall percent imperviousness of this project?
%
1d. Who will be responsible for the review of the Stormwater Management Plan?*
r Certified Local Government
fJ DWR 401 & Buffer Permitting Branch
2. Diffuse Flow Plan
r DEMLR Stormwater Review
r DWR Transportation Permitting Branch
2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection
Rules?
C' Yes
If no, explain why:
�' No
5. DWR 401 Stormwater Review
Sa. Is the Stormwater Management Plan (including BMP Supplemental Forms and Operation and Maintenance Agreements) attached?
C•' Yes
C' No
Stormwater Management Plan Upload
aick the upload button or drag and drop files here to attach docurrent
W-5212N_hyd_Permit_Drawi ngs_2017-06-20. pdf
file type rrust be pdf
G. Supplementary Information
1. Environmental Documentation
4.85M6
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the
requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?*
C' Yes �' No
Comments:*
The project is a Type I Categorical Exclusion project which does not involve significant environmental impacts. The
Type I actions are those actions which: do not induce significant impacts to planned growth or land use for the
area, do not require the relocation of significant numbers of people; do not have a significant impact on any
natural, cultural, recreational, historic or other resource; do not involve significant air, noise, or water quality
impacts; do not have significant impacts on travel patterns; and do not otherwise, either individually or
cumulatively, have any significant environmental impacts.
2. Violations (DWR Requirement)
� 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or
DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? *
C' Yes C•' No
2b. Is this an after-the-fact permit application?*
C' Yes �' No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact
nearby downstream water quality?*
f Yes C•' No
3b. If you answered "no," provide a short narrative description.
The project is a Type I Categorical Exclusion project which do not involve significant environmental impacts. They
are actions which: do not induce significant impacts to planned growth or land use for the area, do not require the
relocation of significant numbers of people; do not have a significant impact on any natural, cultural, recreational,
historic or other resource; do not involve significant air, noise, or water quality impacts; do not have significant
impacts on travel patterns; and do not otherwise, either individually or cumulatively, have any significant
environmental impacts.
4. Sewage Disposal (DWR Requirement)
4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the
proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant.
No wastewater is generated from the project.
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
Sa. Will this project occur in or near an area with federally protected species or habitat? *
C' Yes C' No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
�' Yes c' No
5c. If yes, indicate the USFWS Field Office you have contacted.
Asheville
5d. Is another Federal agency involved?*
C' Yes �' No �' Unknown
5e. Is this a DOT project located within Division's 1-8?*
C' Yes C•' No
5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?*
�' Yes C' No
5g. Does this project involve bridge maintenance or removal?*
C' Yes C•' No
I Link to the NLEB SLOPES document: http://sav�reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf
5h. Does this project involve the construction/installation of a wind turbine(s)?**
C' Yes G No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers,
mechanized pile drivers, etc.?*
C' Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?*
NC Natural Heritage Database. Division 12 is located in the white nose syndrome area for Northern Long Eared
Bat; however, there are no known hibernacula or roosting trees in Division 12 counties.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
C' Yes �' No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
There are no salt marshes, oyster reefs or seagrass beds in the Division 12 counties: Cleveland, Lincoln, Gaston,
Ale�nder, Iredell, or Catawba.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/
� 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?*
C' Yes �' No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources? *
Cultural resources reviewand assessment of effects (Project Tracking No. 16-04-0024)
7c. Historic or Prehistoric Information Upload
C7ick the upload button or drag and drop files here to attach docurrent
16-04-0024EFFECTS.pdf 6.71 MB
W-5212N Gaston No NRHP Archaeological Sites Present Form.pdf 28.1 MB
Fle rrust be FDF
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
r Yes l" No
8b. If yes, explain how project meets FEMA requirements:
Hydraulic unit coordination with FEMA
8c. What source(s) did you use to make the floodplain determination?*
Flood map website, http://fris.nc.gov/fris
Miscellaneous attachments not previously requested.
Gick the upload button or drag and drop files here to attach docurrent
waiver_request_double.pdf
waiver_request_triple.pdf
Floodmap_site1.pdf
Floodmap_site2.pdf
Floodmap_site4.pdf
ha�ardous_spill_basin.pdf
signed_NLEB_ConsultationForm.pdf
W-5212N NRTR_final.pdf
Fle rrust be FDF
Signature
*
rJ By checking the box and signing below, I certify that:
4.27M6
4.05M6
312.18KB
393.87KB
383.06KB
4.67KB
97.49KB
74.74MB
■ I have given true, accurate, and complete information on this form;
■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
■ I intend to electronically sign and submit the PCN form.
Full Name:*
Trish Beam
Signature
r -a
_ tr�� ��Fr��
i Date:
current_date
Initial Review
Is this project a public transportation project? *(?)
C� Yes C' No
Change only if needed.
Has this project met the requirements for acceptance in to the review process?*
C� Yes
C' No
BIMS # Assigned*
20171491
Version#*
1
Reviewing Office *
Mooresville Regional Office - (704) 663-1699
Select Project Reviewer*
Donna Hood:eads\drhood