HomeMy WebLinkAbout20211043 Ver 1_USACE Correspondence_20171117Carpenter,Kristi
From: Williams, Andrew E CIV USARMY CESAW (US)
<Andrew.E.Williams2@usace.army.mil>
Sent: Friday, November 17, 2017 3:56 PM
To: Blakeney, Gregory M; Norton, Apri) R;
Militscher.Chris@epa.gov; Gary�jordan@fws.gov;
Gledhill-earley, Renee; Wilson, Travis W.;
mday@tjcog.org; jfr@Ircog.org;
jstrickland@co.cumberland.nc.us;
McInnis.Jay@ncdot.gov; Matthews, Monte K CIV
USARMY CESAW (US)
Cc: Williams, Andrew E CIV USARMY CESAW (US)
Subject: [External] NCDOT R-5709 CPl and 2 NC 211 from US
15/501 in Aberdeen to East of SR 1244 in Raeford
Moore and Hoke Counties
CAUTION: External email. Do not click links or open attachments unless verified. Send all
suspicious email as an attachment to report.spam@nc.gov.
I apologize for not making the CP1 and CP2 meeting for this project, which was held on
June 15, 2017. I reached out to NCDOT via email in July 2017 with some comments
regarding the purpose and need statement and asking them if they could make some
changes to it.
Essentially, we (The Corps) have decided that the current purpose and need statement
is too general and may result in some difficulty in reaching CP 3 at a future date. We
have asked NCDOT to add some specific parameters to the statement, such as the
desired Level of Services (LOS).
I am sending this email to see if any of you would object to NCDOT adding the specific
parameters to the purpose and need statement. Potentially, they could send the revised
purpose and need statement out via email for signatures, and avoid an additional
meeting.
Please let me know as soon as possible whether or not you have any objections to a
revised purpose and need statement for this project. If you have any questions or
concerns, please let me know.
Thanks
Andrew Williams
Regulatory Project Manager
US Army Corps of Engineers
Wilmington District, Raleigh Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
919-554-4884 ext. 26