HomeMy WebLinkAboutNC0082694_Compliance Evaluation Inspection_20171030Water iiesource6
ENVIRONMENT AL OUALI iY
October 30, 2017
Mr. Bill Trudnak, Public Works Director
Town of Dallas
210 North Holland Street
Dallas, NC 28034
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Director
RECEIVEDINMEWWP
NOV 07 2017
Water Quality
Subject: Compliance Eva IuationTR9Wf?8n'ectlon
Dallas WTP
NPDES Permit No. NCO082694
Gaston County
Dear Mr. Trudnak:
Enclosed is a copy of the Compliance Evaluation Inspection for the inspection conducted at
the subject facility on October 25, 2017, by Ori Tuvia and Maria Schutte. Zachary Foreman's
cooperation during the site visit was much appreciated. Please advise the staff involved with this
NPDES Permit by forwarding a copy cf the enclosed report.
The report should be self-explanatory; however, should you have any questions concerning
this report, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at
ori.tuvia@ncdenr.gov.
Cc: NPDES Unit,
MRO Files
Sincerely,
ri Tuvia, Environmental Engineer
Mooresville Regional Office
Division of Water Resources, DEQ
Mooresville Regional Office
I nraftnn Rin Feet C ontor Gua Qmtr+ Int Nfinmmamnlla W 9R11r
United States Environmental Protection Agency
Form Approved
EPA Washington, D C 20460
OMB No 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A National Data System Coding (i e , PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 15 1 3 I NCo082694 111 12 17/0/25 J17 18 ICI 19 I c I 201 I
21111111 1111 II 1111111111111111111 11111111 111 166
I
Inspection Work Days Facility Self-Monitonng Evaluation Rating B1 QA Reserved
67 10 7014 1 71 1ti 1 72 1 N 1 731 1 174 75 80
LJ LJ I I I
Section B FacilityData
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermrt Number)
01 45PM 17/10/25
15/10/01
Dallas WTP
1342 Dallas -Stanley Hwy
Exit Time/Date
Permit Expiration Date
Dallas NC 28034
02 45PM 17/10/25
20/07/31
Name(s) of Onsite Representative(s)/Tities(s)/Phone and Fax Number(s)
Other Facility Data
///
Michael Wayne HurUORC/704-922-1309/
Zachary Foreman//704-922-1309 /
Name, Address of Responsible OfficiaUTitle/Phone and Fax Number
Contacted
James M Palenick,210 N Holland St Dallas NC 280342749/Intenm Town
Manager/704-922-3176!7049224701 No
Section C Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Laboratory
Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Mane Schutte Division of Water Quality//704-663-1699i
On A Tuvia MRO WQ//704-663-1699/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W Corey Basinger MRO WQ//704-235-2194/
EPA Form 3560-3 (Rev 9-94) Zrevious editions are obsolete
V�'r Page# 1
NPDES yr/mo/day Inspection Type
31 N00082694 I11 12 17/10/25 j 17 18 ICI
Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
^ •• N s j. � • r F .
1
Page# 2
M
N
Permit NCO082694 Owner -Facility Dallas WTP
Inspection Date 10/25/2017 Inspection Type Compliance Evaluation
Permit
Yes No NA NE
(If the present permit expires in 6 months or less) Has the permittee submitted a new
❑
❑
M
❑
application?
0
❑
❑
❑
Is the facility as described in the permit?
M
❑
❑
❑
# Are there any special conditions for the permit?
❑
M
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the Inspector granted access to all areas for Inspection?
0
❑
❑
❑
Comment . The subject permit expires on 7/31/2020
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
M
❑
❑
❑
Is all required Information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab reg required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
M
❑
❑
❑
Dates, times and location of sampling
Name of Individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete do they Include all permit parameters?
E
❑
❑
❑
Has the facility submitted Its annual compliance report to users and DWQ?
❑
❑
M
❑
(if the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
0
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
❑
Is a copy of the current NPDES permit available on site?
0
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
0
❑
Comment The records reviewed during the inspection were organized and well maintained Discharge
Monitoring Reports (DMRs). Chain of Custodies (CDCs). ORC logs and Calibration logs,
were reviewed for the period October 2016 through June 2017
Laboratory
Yds No NA NE
Page#
3
V
Permit NCO082694 Owner - Facility Dallas WTP
Inspection Date 10/25/2017 Inspection Type Compliance Evaluation
Yes No NA NE
Is composite sampling flow proportional?
❑
❑
Laboratory
Yes No NA NE
Are field parameters performed by certified personnel or laboratory?
0
❑
❑
❑
Are all other parameters(excluding field parameters) performed by a certified lab?
0
❑
1111
❑
# Is the facility using a contract lab?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
❑
❑
❑
❑
Celsius)?
Incubator (Fecal Coliform) set to 44 5 degrees Celsius+/- 0 2 degrees?
❑
❑
M
❑
Incubator (BOD) set to 20 0 degrees Celsius +/-1 0 degrees?
❑
❑
M
❑
Comment On-site field analyses (PH and total residual chlorine) are performed under field laboratory
certification #5606, K&W Labs (total suspended solids, metals, turbidity, fluoride) and
Meritech Labs (toxicity) have also been contracted to provide analytical support
Effluent Samplina
Yes No NA NE
Is composite sampling flow proportional?
❑
❑
M
❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
M
❑
❑
❑
Is the tubing clean?
❑
❑
0
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6 0 degrees
❑
❑
0
❑
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
M
❑
❑
❑
representative)?
Comment The subject permit requires effluent grab samples
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? M ❑ ❑ ❑
Does the facility analyze process control parameters, for ex MLSS, MCRT, Settleable M ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment. The facility appeared to be properly operated and maintained. The process control
measurements (pH and total residual chlorine levels prior to drying beds) were being
Properly documented and maintained on-site
Laaoons Yes No NA NE
Type of lagoons?
# Number of lagoons in operation at time of visit? 2
Are lagoons operated in?
# Is a re -circulation line present? ❑ ❑ 0 ❑
Is lagoon free of excessive floating materials? M ❑ ❑ ❑
Page# 4
Permit NCO082694 Owner - Facility Dallas WTP
Inspection Date 10/25/2017 Inspection Type Compliance Evaluation
❑
❑
M
❑
Lagoons
Yes No NA NE
# Are baffles between ponds or effluent baffles adjustable?
❑
❑
N
❑
Are dike slopes clear of woody vegetation?
0
❑
❑
❑
Are weeds controlled around the edge of the lagoon?
0
❑
❑
❑
Are dikes free of seepage?
0
❑
❑
❑
Are dikes free of erosion?
0
❑
❑
❑
Are dikes free of burrowing animals?
0
❑
❑
❑
# Has the sludge blanket in the lagoon (s) been measured periodically in multiple
❑
❑
0
❑
locations?
❑
❑
M
❑
# If excessive algae is present, has barley straw been used to help control the growth?
❑
❑
M
❑
Is the lagoon surface free of weeds?
❑
0
❑
❑
Is the lagoon free of short circuiting?
0
❑
❑
❑
Comment. The facilllty Is equipped with two settling ponds (1 -primary and 1 -overflow) Overflow pond
❑
# Is the site free of dry sludge remaining in beds?
0
was covered with weeds
❑
❑
Is the site free of stockpiled sludge?
M
The facility is equipped with dual pumps at the primary pond to pump
the wastewater onto
❑
Is the filtrate from sludge drying beds returned to the front of the plant?
the drying beds
❑
M
❑
# Is the sludge disposed of through county landfill?
Drying Beds
Yes No NA NE
Is there adequate drying bed space?
M
❑
❑
❑
Is the sludge distribution on drying beds appropriate?
❑
❑
M
❑
Are the drying beds free of vegetation?
N
❑
❑
❑
# Is the site free of dry sludge remaining in beds?
0
❑
❑
❑
Is the site free of stockpiled sludge?
M
❑
❑
❑
Is the filtrate from sludge drying beds returned to the front of the plant?
❑
❑
M
❑
# Is the sludge disposed of through county landfill?
M
❑
❑
❑
# Is the sludge land applied?
❑
❑
0
❑
(Vacuum filters) Is polymer mixing adequate?
❑
❑
M
❑
Comment The facility is equipped with two drying beds (alternated)
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
❑
❑
M
❑
Is flow meter calibrated annually?
❑
❑
0
❑
Is the flow meter operational?
❑
❑
0
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
M
❑
Comment Instantaneous flows are based on calculations that include number of
pumps, flow rate, and
pump run time
Page# 5
Permit NC0082694 Owner -Facility Dallas WTP
Inspection Date 10/25/2017 Inspection Type Compliance Evaluation
Effluent Pipe
Yes No NA NE
Is right of way to the outfall properly maintained?
❑
❑
❑
M
Are the receiving water free of foam other than trace amounts and other debris?
❑
❑
❑
0
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
❑
N
Comment
Page# 6