Loading...
HomeMy WebLinkAbout20171444 Ver 1_Approval Letter_20171116ROY COOPER <;o,������<„� MICHAEL S. REGAN Srci���i�rr Environmentul LINDA CULPEPPER /illc�ri�)r L)irec'(or QUQIlty November 16, 20U Duplin County NCDWR Project No. 2017I444 SR 1513 WBS # DF15003.2031084 APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS Mr. Mason Hemdon Environmental Program Supervisor NCDOT, Division 3 5501 Barbados Boulevard Castle Hayne, NC 28429-5647 Dear Mc Herndon: You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of replacing a pipe at Giffords 6ranch on SR 1513 (Alum Springs Road) in Duplin County: Stream Imoacts in the Caoe Fear River Basin Permanent Temporary Permanent Fill in Fili in Fill in Site Intermittent Intermittent Perennial Stream Stream Stream linear ft linear ft linear ft 9 'AL 9 Total Stream Impact for Project: 391inear feet. Temporary Fill in Total Perennial stream Stream Impacts 30 Impacts Requiring Mitigation linear ft N/A The project should have been conswcted in accordance with your application dated received November 7, 2017. After reviewing your after-the-fact application, we have decided that these impacts are covered by General Water Quality Certification Number 408�. This certification corresponds to the Nationwide Perznit 3 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed wi[h your project including (but not limired to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit. This approval is valid solely for the purpose and design described in your application (unless moditied below). Should your project change, you must notify the NCDWR and submit a new application. If thz property is sold, [he new owner must be �iven a copy of [his Certifica[ion and approval Ietter, and is [hereby responsible for complying with all the conditions. If [otal wedand fills for this projec[ (now or in the future) exceed one acre, or of [o[al impac[s to sheams (now or in [he future) exceed I50 linear fee[, compensa[ory mitigation may be required as described in I SA NCAC 2H .0506 (h) (6) and (7). For tliis approval to remain valid, you must adhere ro the conditions listed in the attached certifica[ion and any additional conditions listed below. State o(Nonh Camlina I Gnuironmental Quality 1617 Mail Service Cznter I�leigh, Nonh Carolina 2 7699-1 61 7 Condition(s) of Certification: Project Specific Conditions � 1. Due to the existing geomorphological conditions at the site as described in your application received on November 7, 2017, the pipe replacement did not meet the burial requirement of GC 4085 of 1 foot. The proposed culvert was buried on a 2 percent slope. Due to'the scour at the end of the pipe 9 linear feet of rip rap was added at the downstream pipe outfall. If any compliance issues with the culvert occur, DWR mayrequire DOT to submit a modification ofthis culvert design. [15A NCAC 02H.0506(b)(2)] General Conditions 2 If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible,aquatic life and fish kills: [15A NCAC 02B.0200] 3 During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)] 4 The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0506(b)(2)] r 5 The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [15A NCAC 02H.0506(b)(2)] 6 The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. [15A NCAC 02H.0507(c) and 15A NCAC 02H .0506 (b)(2) and (�)(2)] 7 All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [15A NCAC 02H.0506(b)(3) and (c)(3)] � 8 Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)] 9 All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(b)(3)] 10 No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. [15A NCAG 02H.0506(b)(3)] 11 Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. [15A NCAC 02H.0506(b)(3)] 12 The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A NCAC 02B.0200] 13 All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. [15A NCAC 02H.0506(b)(2)] 14 A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintiained with . the Division Engineer and the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 15 The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502] 16 The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be impo'sed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 17 ' The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [15A.NCAC 02B.0506(b)(2)] 18 Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division�Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed. [15ANCAC 02H.0502(fl] 19 Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. [15A NCAC 02B.0231(a)(6)] 20 There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should� waste or borrow sites, or access roads to wasie or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities.[15A NCAC 02H.0506(bj(3) and (c)(3)] 21 Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3]): a. The erosion and sediment control measures for the proj ect must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Desdgn Manual.. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina 5ediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d: The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. - 22 Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. [15A NCAC 02H.0506(b)(3) and (c)(3)] If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for o�cial state holidays. The original and one (1) copy of the petition must be iiled with the Office of Administrative Hearings. , The pefltion may be faaced-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the fa�ced transmission. The mailing address for the Office of Administrative Hearings is: Office of Administra[ive Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 4313000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: General Counsel Depardnent of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division of Water Resowces under Section 401 of the Clean Water Act. If you have any quesrions, please contact Joanne Steenhuis at (910) 796-7306 or joannesteenhuis@ncdenr.gov. incerely, �^I , V' � Lin Culpeppe , I�terim D'vector Division of Water Resources Electronic copy only distribution: Brad Shaver, US Army Corps of Engineers, Wilmington Field Office Joanne Steenhuis, NC Division oF Water Resources Wilmington Regional Office File Copy Envlronmentul QUQ�Irf/ NCDWR Project No.: Applican[: Project Name: Date of Issuance of 401 Water Quality Certification: Caunty: ROY COOPER ro��r„i„�� MICHAEL S. REGAN �rox ran LINDA CULPEPPER lnierim Diree'lor Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certihcation or applicable Buffer Rules, and any subsequent modifications, the applicant is required to retum this certificate to the 401 Transportation Permittin� Unit, North Carolina Division of Water Resources, 1617 Mail Service Center. Raleigh, NC, 27699-1617. This form may be returned to NCDWR by Ihe applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. ApplicanPs Certificallon I, , hereby state that, to che best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and in[ent of [he 401 Water Quality Certifica[ion and Buffer Rules, the approved plans and specifications, and other sapportin� materials. Signature: Da[e: Agent's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in Ihe observation of the construction such [hat [he construc[ion was observed to be built within su6s[antial compliance and intent of Ihe 401 Water Quality Certifica[ion and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certifiearion Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, havin� been authorized [o observe (periodically, weekly, full time) the construction of the projeM for the Permittee hereby state that, to Ihe best of my abili[ies, due care and diligence was used in the observation of the wnstruc[ion such that the construction was observed [o be built wi[hin substantial compliance and intent of Ihe 401 Water QualiTy Certification and Buffer Rules, the approved plans and specifications, and o[her supportin� materials. Signature Da[e Registration No. Stare ofNonh Carolina I Environmzn[al Qualin, 1617 Mail Service Center I Raleigh. Nnrth Carolina 27699-I fi17