Loading...
HomeMy WebLinkAbout20080868 Ver 2_Emails_20090115 (9) Re: Modified 401 Certification for PCS Phosphate Subject: Re: Modified 401 Certification for PCS Phosphate From: susan massengale <susan.massengale@ncmail.net> Date: Thu, 15 Jan 2009 16:02:49 -0500 To: Anne Deaton <Anne.Deaton@ncmail.net> CC: John Dorney <john.dorney@ncmail.net>, Diana Kees <Diana.Kees@ncmail.net> Hello Anne, John is out of town at a hearing and I'm sure he can give you more detail later. However, the short answer is that PCS Phosphate can mine a corridor, rather than walk their equipment, through a slender strip at the edge of the hardwood wetland to get from one mining location to another. John can fill you in on the protections attached to that. It was based on additional information from PCS Phosphate. Both certifications are related to Alternative L but with fewer impacts - kind of an Alternative L light. I believe John will be back in the office tomorrow and he will be able to give you more detail. Susan Anne Deaton wrote: Could you please advise what changed and why? I see the impact acres changed. Was the original 401 for Alternative L also? John Dorney wrote: This morning the Director signed a modified 401 Water Quality Certification for the PCS Phosphate mine expansion near Aurora, NC. Attached should be an electronic copy of the reviaed Certification. I will be out of the office all day doing a public hearing in Albemarle, but you can reach our public information officer (Susan Massengale) at 919-807-6359 if you have any questions. Hard copies of the Certificatoin will be mailed out today as well. Thankx 1 of 1 1/16/20097:48 AM