Loading...
HomeMy WebLinkAboutAtlantic Coast Pipeline - VS-30 Weeks Farm PD4646J163162 162161PROPOSED 36" AP-2 PIPELINE PERMANENT R/W PERMANENT R/W PROPOSED 50'X50' VALVE SITE STA. 6256+60 PAD EL. 162.0'GREEN PATH ROADCOUNTY ROUTE 10056256+006257+00SEE GRAVEL DETAIL REMOTE VALVE OPERATION PANEL TO BE MOUNTED WITH SK-105 (4") PIPE SUPPORT (SEE NOTE 4) 3 4" BURIED CONDUIT (SEE NOTE 1)80' MONOPOLE FOR MICROWAVE COMMUNICATIONS (SEE NOTE 3)xxxxxxxxxxxxxxxxx x x x x 10' 10' PROPOSED 12' ACCESS ROAD GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: TOWN:COUNTY:DWG. NO.GROUP REV. Engineering and Consulting, LLC ..INITIATIVE INNOVATIONINTEGRITY STATE: Atlantic Coast Pipeline, LLC FOR: 925 White Oaks Blvd. Bridgeport, WV 26330 / Phone: (681) 842-3000 NC 36" MAIN LINE VALVE ASSYMBLY DUNN CUMBERLAND DOM/ACP/VALVE SITES/AP-2/VS 30 WEEKS FARM/DRFT PD 4646J 2 AEG 7/16/15 DLM 7/21/15 JNJ 4/18/16 1"=10' WEEKS FARM VALVE SITE CENTERLINE STATION 6256+60 ISSUED FOR BIDRRC10/2/150 CONTOUR INTERVAL : 1 FOOT SURVEY DATUM UTM ZONE 17, US FEET SITE LOCATION LAT 35° 14' 21.67'' LONG 78° 35' 37.93'' REMOVE PROPOSED CONTOURSRLR1/26/161 ISSUED FOR CONSTRUCTIONRC5/6/162 GRAVEL DETAIL REVISED LOCATION PER FERC 0 CENTERLINE / ADDED ELECTRICAL CONTRACTOR INSTALL INFOKLA9/5/173 L E G E N D CONTOUR162 FENCE xxxRIGHT-OF-WAY CONTOUR ACP CENTER LINE EDGE OF ROAD FLOOD PLAIN REFERENCE ZONE X IS AREA DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN. THE PROPERTY IS LOCATED IN ZONE X AS SHOWN ON THE FLOOD INSURANCE RATE MAP, 3720152400K SAMPSON COUNTY, NC. UN-INCORPORATED AREAS. EFFECTIVE DATE JANUARY 5, 2007.