HomeMy WebLinkAbout20171454 Ver 1_Permit Drawing Revisions_20171115Carpenter,Kristi
From: Herndon, T. Mason
Sent: Wednesday, November 15, 2017 8:47 AM
To: Shaver, Brad E CIV USARMY CESAW (US); Steenhuis,
Joanne
Cc: Westphal, Anneliese
Subject: RE: [External] RE: Sampson 148 Permit Drawing
Revisions
Thank you sir!
Mason Herndon
Environmental Program Supervisor
Division 3
NCDOT- Division of Highways
910-341-2036 office
910-604-0050 mobile
tmherndon@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429
Email correspondence to and from this address is subject to the North Carolina Public
Records Law and may be disclosed to third parties.
-----Original Message-----
From: Shaver, Brad E CIV USARMY CESAW (US) [mailto:Brad.E.Shaver@usace.army.mil]
Sent: Wednesday, November 15, 2017 8:00 AM
To: Herndon, T. Mason <tmherndon@ncdot.gov>; Steenhuis, Joanne
<joanne.steenhuis@ncdenr.gov>
Cc: Westphal, Anneliese <awestphal@ncdot.gov>
Subject: [External] RE: Sampson 148 Permit Drawing Revisions
CAUTION: External email. Do not click links or open attachments unless verified. Send all
suspicious email as an attachment to report.spam@nc.gov.
Mason,
The Corps has reviewed the revised permit drawings submitted for Br 148 over Mill
Creek in Sampson County. The Corps further agrees that the omitted revision still meets
the terms and conditions of the nationwide permits originally issued for this project. The
Corps will file this exchange in our records for future compliance purposes.
Thanks,
i
Brad
-----Original Message-----
From: Herndon, T. Mason [mailto:tmherndon@ncdot.gov]
Sent: Thursday, November 9, 2017 3:39 PM
To: Shaver, Brad E CIV USARMY CESAW (US) <Brad.E.Shaver@usace.army.mil>;
Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>
Cc: Westphal, Anneliese <awestphal@ncdot.gov>
Subject: [EXTERNAL] Sampson 148 Permit Drawing Revisions
Brad & Joanne,
Please find attached revised permit drawings for Bridge 148 over Mill Creek on SR 1434
(Huntley School Rd) in Sampson County. WBS # 17BP.3.R.53. During the
preconstruction meeting it was noted that impacts associated with the stormwater pipe
replacement at �Sta. 20+00 LT were omitted from the original submittal. This revision
includes an additional 23 If of bank stabilization and <0.01 acres of surface water
impacts for dewatering BMP's at the outlet of the new pipe. This project was processed
under the LIBR program and we received e-mail confirmations from DWR on 2/16/17
and USACE 3/17/17 that the project met the terms and conditions of Nationwide 3 and
13, as well as the corresponding WQC's 4085 and 4087. The PJD was assigned AI #
SAW-2017-00414.
Please provide an e-mail confirmation that you have received the revised drawings and
that the project still meets the conditions and terms of your respective permits.
Thanks!
Mason Herndon
Environmental Program Supervisor
Division 3
NCDOT- Division of Highways
910-341-2036 office
910-604-0050 mobile
tmherndon@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law
and may be disclosed to third parties.