Loading...
HomeMy WebLinkAbout20171465 Ver 1_Build Maps_20171115F �l�-;Il�v�ly North Carolina Department of Transportation SIOCtll�v_c1t( e � ,.,.�,,, � Highway Stormwater Program �;' STORMWATER MANAGEMENT PLAN _ - (Version 2.06; Released June 2016) FOR NCDOT PROJECTS WBS Element: 17BP.9.R.61 TIP No.: 840129 County�ies): Stokes Page 1 of 1 General Project Information WBS Element: 17BP.9.R.61 TIP Number: 840129 Project T pe: Brid e Replacement Date: 9/15/2016 NCDOT Contact: Galen Cail, PE Contractor I Desi ner: Joshua G. Dalton, PE Address: Hydraulics Unit Address: Sungate Design Group, PA 1590 Mail Service Center 915 Jones Franklin Road Ralei h, NC 27699-1590 Ralei h, NC 27606 Phone: 919 707-6711 Phone: 919 859-2243 Email: cail ncdot. ov Email: 'dalton sun atedesi n.com Cit ITown: ML Ai Count ies : Stokes River Basin s: Roanoke CAMA Count ? No Wetlands within Project Limits? No Pro'ect Description Pro'ect Len th lin. miles or feet : 0.091 miles Surroundin Land Use: Rural, Residential, Agricultural Proposed Pro'ect Existin Site Pro'ect Built-Upon Area ac. 0.3 ac. 0.2 ac. Typical Cross Section Description: Two (2) 10' wide paved travel lanes with grass shoulders and ditch sections. Two (2) 9' to 10' wide paved travel lanes with grass shoulders and ditch sections. Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 870 Year: 2014 Existin : 870 Year: 2014 General Project Narrative: This project involves the replacement of Bridge Number 840129 over South Double Creek on SR 1484 (Dan George Road) and improvements to the roadway approaches in (Description of Minimization of Water each direction. The bridge replacement and associated approaches have been designed to minimize increases in impervious surface area and maintain existing drainage Quality Impacts) patterns. No deck drains are proposed for the replacement bridge. Deck drainage will be collected by grate inlets at the roadway sag location north of the bridge and discharged to a roadway ditch on the east side of the road. A rip-rap outlet pad will be installed at the dicharge pipe to protect against erosion. Proposed ditches on the northeast and southwest quadrants of the bridge are intended to replace existing roadway ditches that will be covered by shoulder fill material, and are of similar size and grade to the existing ditches they will replace. Rip-rap ditch linings are proposed for all or portions of the proposed ditches to control runoff velocity and erosion. Waterbody Information Surface Water Body (1): South Double Creek NCDWR Stream Index No.: 22-11 NCDWR Surface Water Classification for Water Body Primary Classification: Class B Supplemental Classification: None Other Stream Classification: None Impairments: mercury (Hg) Aquatic T&E Species? Yes Comments: James Spinneymussel (Bio Conclusion: may affect, not likely to adversely affect). Will utilize design standards for sensitive watersheds. NRTR Stream ID: N/A Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N!A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justifcation in the General Project Narrative) General Project Narrative) �ee �h,eet i A Fcu� Indc,� oT `��ieet�. �V �o � N V • � � V � � O V L BEGIN PROJECT 17BP.9.R.61 —L— STA. ll +30.00 � TO SR 1001 (MOORES SPRING ROAD) THIS PROJECT IS NOT WITHIN A MUNICIPAL BOUNDARY. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD [II. ��'���'1� ��I�' ����°�� ���� I ' c�JIe1�1`� �� �������� �� ������� �I�� STOI�ES CO U1�lTY LOCATI011t: BRIDGE #840129 OVER SOUTH DOUBLE CREEK ON SR 1484 (DAN GEORGE ROAD) TYPE OF WORK: GRADI11lG, PAVI11lG, DRAl11lAGE, � STRUCTURE WETLAND AND SURFACE WATER IMPACTS PERMIT — •—� � NAD 83i2077 � J—' BEGIN BRIDGE -L- STA. 13+05.00 _�- i SR 1484 (DAN GEORGE ROAD� / ; �t_l u �'� � � � � J., ��, �� . `J{\ vo�(3�'� �-^� .,f`-•-. � — � ��J��� _ �� �,i S � ���� � ___ - �"�� ��, � ��-r � ,.�j ,.;-�� �� .� � :.� . ,,"'- . " - - ��..� �END"�BRIDGE -- �- �,�-, ' -L- STA. 14+50.00 ; �. � =��, � � ,�� PERMIT DRAWING SHEET 1 OF 4 END PROJECT 17BP.9.R.61 —L— STA.16+10.00 i o N�.uAY 2 8 � ' �,� �'a '���^, � ,, \ ��I _A:�� �� SMITH—ROWE, LLC ST� E�,�;,,e��s, �,��. �� ��� ��� ��o�, w«,1��d, �� ���,�2 „�. � Uh.���.��tz. N�� _8�0, a._ ���e�se n�mc�� F-,a�, GRAPHIC SCALES DESIGN DATA PRO ECT LENGTH PLANS PREPARED FOR THE NCDOT BY.• HYDRAULICS 'l STV ENGINEERS, INC. ENGINEER 900 West Trade St., Ste 775, Char(arte, NC 28202 SUNGATEDESIGNGROUP,PA. 2� �0 0 2� 40 A�T 2��4 = $7� NC Lieente Nvm6er F-0991 a�s ,uaon� ��6G ��� LENGTH OF ROADWAY PROJECT 17BP.9.R.61 = 0.063 MILES � M, - „o�,„�� �C �� / �'\ �� V= 55 MPH zoiz szAxnA� srscinrcarroxs ruccoallo c-oaso��� �ap� � "":�� PLANS T= 6p�o* LENGTH OF STRUCTURE PROJECT 17BP.9.R.6I = 0.027 MILES PE � � 20 10 0 20 40 TOTAL LENGTH OF PROJECT I7BP.9.R.61 = 0.091 MILES sicFaruas: n`,-'" '� RIGHT OF WAY DATE: BRIAN_K._LUSK PE g PROJECT ENGNEER ROADWAY ��/ , /� " �� MAY 19, 2015 DBSIGN ���� � PROFILE (HORIZONTAL) * TTST=3°/a, DUALS=3% ENGINEEn ���� ��i% � � ��_� n ���' 4 2 0 4 g FUNC. CLASSIFICATION: NCDOT CONTACT: VIRGINIA MABRY LETTING DATE: PATRICK A._LIVINGSTON,_EI RURAL LOCAL MAY 19�?O�S PROJECT DESIGNER SUB REGIONAL TIER Priority Projects Unit PROFILE (VERTICAL) PE srcnr.a rur�: WETLAND PERMIT IMPACT SUMMARY WETLANDIMPACTS SURFACE WATERIMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 13+80 / 14+04 -L- LT RIP RAP AT EMBANKMENT < 0.01 28 1 13+66 / 13+88 -L- RT RIP RAP AT EMBANKMENT < 0.01 26 TOTALS': < 0.01 54 0 0 *Rounded totals are sum of actual impacts NOTES: fL'Y:I