HomeMy WebLinkAbout20141149 Ver 8_BPDP Approval Letter_20171114Am
Water Resources
Environmental Quality
November 14, 2017
Raymond Holz
Restoration Systems, LLC
1101 Haynes Street Suite 211
Raleigh, NC 27604
(via electronic mail)
Re: Rocky Top BPDP Approval
Dear Mr. Holz,
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
(nterini Director
DWR Project #: 2014-1149v8
Alamance County
The Division of Water Resources (DWR) received a draft Bank Parcel Development Package (BPDP)
for the above -referenced site on April 28, 2017 for review and approval under the terms and conditions
of the Restoration Systems, LLC Haw -River Subwatershed Phase One Umbrella Mitigation Banking
Instrument for Riparian Buffer Mitigation and Nutrient Offsets (UMBI). The UMBI was made and
entered into by Restoration Systems, LLC (RS) acting as the Bank Sponsor, and the DWR on October
25, 2017. On October 16, 2017, DWR received a revised BPDP that addressed previous comments
provided by Katie Merritt, with DWR.
On October 27, 2017, the subject BPDP was placed on public notice and made available for
commenting. DWR received no comments regarding the subject BPDP. This BPDP is now
approved. RS needs to provide DWR with one (1) hard copy of the entire BPDP that was placed on
public notice, with the exception of the EDR Report.
According to the credit release schedule outlined in your UMBI, the following items are required
prior to receiving your first credit release of twenty percent:
• Conservation easement approved by DWR
• Financial Assurance documents if applicable
Please feel free to call Katie Merritt at (919) 807-6371 if you have any questions regarding this
correspondence.
Sincerely,
-Y,4e, -
�a
s, Supervisor
uer Permitting Unit
cc: File Copy (Katie Merritt)
�`'-`- Nothing Compares=.—.-,.,.
State of North Carolina I Environmental Quality
1611 Mail Service Center I Raleigh, North Carolina 27699-1611
919-707-9000