February 16, 2017
Brad Shaver, NCDOT Coordinator
Wilmington Regulatory Field Office
US Army Corps of Engineers
69 Darlington Avenue
Wilmington, NC 28403
JAMES H. TROGDON, III
SECRETARY
Subject: LIBR Application for Section 404 Nationwide Permit 3 and 13 for proposed replacement of
Bridge No. 148 over Mill Swamp on SR 1434 (Huntley School Rd.) in Sampson County. WBS
No. 17BP.3.R.53
Dear Mr. Shaver:
Please find enclosed the preliminary jurisdictional determination (PJD) request, Low Impact Bridge
Replacement (LIBR) package and permit drawings for the above referenced project that was prepared for
NCDOT by HTNB and ESI.
Project Description:
The purpose of this project is to replace Sampson County Bridge No. 148 on SR 1434 over Mill Creek which
is classified as C;Sw waters in HLJC 03030006. Bridge No. 148 is currently 35 feet long with 25.3 foot deck
width. The replacement structure will be an 85 feet long single span bridge with a 33 foot total deck width.
The bridge will include two-ll-foot lanes and 4.0-foot offsets. The bridge length is set by hydraulic
requirements.
The approach roadway will extend approximately 238 feet from the southeast end of the new structure and
137 feet from the northwest end of the new bridge. The typical cross section of the approaches will include 2
— 11" asphalt paved lanes with 2 ft. paved shoulders and 6 ft. grass shoulders. A soil driveway will have to
relocated from Sta. —L- 19+71.75 to 19+25 RT. The roadway grade of the new structure will be
approximately the same as the existing grade.
The proposed bridge does not contain deck drains and all stormwater from the bridge and approaches will be
collected by a stormwater drainage system and discharged into a Class B rip rap pad at —L- 19+36 RT.
Jurisdictional Imp acts:
There is a mill pond upstream of the bridge and the discharge from the dam has create substantial scour on
the downstream right bank therefore, 61 linear feet of Class II rip rap bank stabilization will be required on
from Sta. —L- 18+92 to 19+01. Since the proposed slope is less than 1.5:1, NCDOT would like to a waiver
from the filter fabric requirement so the rip rap can be pressed into the bank for better placement and
stabilization.
Minimal wetland impacts (0.01 acres of inechanized clearing and fill) are proposed in the southeast quadrant
along the shoulder.
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DNISION OF HIGHWAYS
5501 BARBADOS BOULEVARD
CASTLE HAYNE, NC 28429-5647
Telephone: (910 341-2000
Fax: (910) 675-0143
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
5501 BARBADOS BOULEVARD
CASTLE HAYNE, NC 28429-5647
Purpose and Need:
The existing structure is structurally obsolete and structurally deficient with a sufficiency rating of 28.36 out
of a possible 100 for a new structure.
Utilities:
Based on the Preliminary Utility Analysis and Progress Report, the only utility conflict on this project is the
SREMC powerline which will have to be shifted to the NNE. There are no jurisdictional impact associated
with this relocation.
Regulatory Approvals:
Section 404 Permit: We anticipate USACE Nationwide 3 and 13 will apply to this project. Written
concurrence from the USACE is not required for this project. NCDOT will abide by all conditions listed in
Nationwide 3 and include a copy of the certification in the permit package and/or contract.
Section 401 Permit: We anticipate 401 General Certification 3883 and 3885 will apply to this project.
Written concurrence from the Division of Water Resources (DWR) is not required for this project. NCDOT
will abide by all conditions listed in WQC 3883 and include a copy of the certification in the permit package
and/or contract.
If you have any questions or need additional information, please feel free to contact me.
Sincerely,
�7 �/ Digitally signed by Mason Herndon
<�� L�`-- /��s•,�-� DN: cn=Mason Herndon, o=NCDOT, ou=Division
3, email=tmherndon@ncdot.gov, r—US
Date: 201 Z02.15 17:1223 -OS'00'
Mason Herndon
NCDOT Division 3
Environmental Program Supervisor
ec: Joanne Steenhuis, Division of Water Quality
Enclosures
Low/Minimal Impact Bridge Praject Data Sheet
7iP NO
WBS Element No.
Description
Basin
Ciassification
Siream SIN
Type
Size iWidth & depth)
Type
Existing Structure 3lze
Suff. Rating
Proposed Structure Typg
B�ZB (IengihxwidRh outoutf
Stream USACE Impacts (LF)
NCDW� Impacts (LF}
USACE Impacts (AC}
Wetlands Non 4p4 Impacts (AC)
CAMlA Imnacks (SP!
itormwater Permit Required (Y!N)
Haqitat
TSE Species Present
Bio Conclusion
Moratarium TypQ
Dates
Nati�elHatchery
Trout Wat$rs Trout Species Pi
Traut Conditiona
WRC Reviewer
CAMA AECs
Essentfa! Fish Habitat {vinl
Wild and 5cenic
Federal lands
TVA Area
FEMA Buyou�
FEMA Flood :
U5Ts Haz Ma
Reloca
Location �T
LONG
Project Comments
Gompleted by:
Q . � . � ,�.�. � 1�51f�
Lead Engineer, Dat �„ db MasonHerndon
�igi a ysigne y
�� DN: rn=Mason Herndon, o=NCDOT, ou=Division 3,
�4T"—' maiktmherndon@ncdotgov, r—US
Da te: 2017.02.15 17:12:56 -OS'00'
Division Environmental Officer, Date
9/612077
Replace Bndge 148 on SR 1434 (Huntley
School Rd) over Mill Swamp
Cape Fear
C; Sw
18-68-1-17-5
Perenn9al
$X5
Reinforced concrete deck
1� 97' - 9"and 1� 17' - 7"
2a.ss
Cored Slab
� 40'-0", 1� 45'-0", 21" wifh a 33' total wicfth
61
0
0.07
D
Yes (American Alligatar)
None
No effect
No
No
No
No
No
No
-78.50897
I Ii�Il���dV Norch Carolina Department of Transportation
StOYt7]YVc�fPY- � �
,..,..,..,� Highway Stormwater Program �;-
STORMWATER MANAGEMENT PLAN --
(Version 2.05; Released April 2016) FOR NCDOT PROJECTS
WBS Element: TIP No.: 17BP.3.R.53 County(ies): Sampson Page 1 of 1
General Project Information
WBS Element: TIP Number: 176P.3.R.53 Project T pe: Brid e Replacement Date: 12/22/2016
NCDOT Contact: Robert T. Turnbull, Environmental Services, Inc. Contractor / Desi ner: HNTB North Carolina, P.C. / James A. B rd, PE
Address: 4901 Trademark Dr. Address: 343 E. Six Forks Road
Raleigh, NC 27610 Suite 200
Ralei h, NC 27609
Phone: 919 212-1760 Phone: 919 424-0437
Email: rturnbull esinc.cc Email: 'ab rd hntb.com
Cit ITown: Salembur Count ies : Sam son
River Basin s: Ca e Fear CAMA Count ? No
Wetlands within Project Limits? Yes
Pro'ect Description
Pro'ect Len th lin. miles or feet : 0.09 Surroundin Land Use: Rural Residental and Agriculture
Proposed Pro'ect Existin Site
Pro'ect Built-Upon Area ac. 0.3 ac. 0.3 ac.
Typical Cross Section Description: 2- 11' asphalt paved lanes with 2' paved shoulders, 6' grass shoulders. Roadway 2- 10' asphalt paved lanes with grass shoulders. Wetlands are present in the
transitions from super to normal crown as you progress down the alignment. Also southeast quadrent of the project and a non-jurisditional pond is present in the
relocated soil drive to -L- 19+71.75 from 19+25 on the right. northwest quadrent of the project.
Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 700 Year: 2032 Existin : 350 Year: 2012
General Project Narrative: State project 178P.3.R.53 involves the replacement of Sampson County Bridge # 810148 on SR 1434 (Huntley School Rd.) over Mill Swamp. The existing bridge consists of 1
(Description of Minimization of Water @ 17' - 9" and 1@ 17' - 7" Reforced concrete deck on timber joists and timber piles and is to be replaced with a 1@ 40' - 0" and 1@ 45'-0", 21" cored slab bridge (85' total
Quality Impacts) length, 33' total width) at the same location.
The proposed bridge does not contain deck drains, all storm water from the bridge and approaches will be collected by a storm drainage system and discharged into a Class
"B" rip-rap pad at -L- 19+36 on the right.
There are no proposed ditches on this project.
Waterbody Information
Surface Water Body (1): Mill Swamp NCDWR Stream Index No.: 18-68-1-17-6
NCDWR Surface Water Classification for Water Body Primary Classification: Class C
Supplemental Classification: Swamp Waters (Sw)
Other Stream Classification:
Impairments:
Aquatic T&E Species? Comments:
NRTR Stream ID: Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
Z
O
�
�
BEGIN TIP PRO ECT 17BP.3.R.53 �/�/ETLAND & STREAM IMPACTS C�INTB HNTB NORTH CAROLINA, P.C. PROJECTREFERENCENO. SHEETNO.
� -1,- P�C .STf� 15+90.00 sas e. six Forks Road, suite zoo UBP.3.R.53 4
I \� NC1Li9enSe�Noh Ca1554na 27609 yyy SHEETNO.
I �- \\ W2 rLOATING ` ROADwAY DESIGN HYDRAUlICS
-"�- � �L � MECHANIZED CLEARING IN WETLANDS = 0.07 AC /427 SF TURBIDI7Y RIP-RAP AT EMBANKMEM �� ENGINEER ENGINEER
1_ SEE DEfAIL 1
/
i I ;� - BEGbV / ENO S;iFE� � FENCE
FILL IN WETLANDS = <0.07 Ac/188 SF CURTAIN -L- STa.2C�+58 ii_Tl
,� IMPACTS IN SURfACE WATER = 0 LF -L- STA 19+71.75 =
�- � � � L�L.I� `�. umuis oF . -ORVI- STA IO+OOAO �S MEGHANIZED CLEARING IN W,ETLANDS = 0.0 Ac/0 SF
\ �
�� . I, QEGIN / END SAFETY FENCE P�1 - FILL IN WETLANDS = 0.0 Ac/0 SF
_� I. � -L- STA15+82 2l1 ���� �� -� IMPACTS W SURFACE WATER = 32 LF
TI N �
A A y /
I � -'` - - � � k � � ' � � ' L � � _—,5 - —� j5 END TIP PRO ECT 17BP.3.R.53
� =� �-, 1 �i � � �s
_ _ _ , � � � � �' � � � 1 � � L POT STA 20 + 50. 00
E 7
1 -. � . .. � � i- � �- e' , � ; � �' ' i i 4, , - � �",� , - ' - � � . - - . . .
m _
�=- �� 1 � s . -{�� i .' '- �j '� s E � `" � �� ��� - LPDE� DOCUMENT NOT CONSIDERED FINAL
- - - ..� ,..:
...i _ , �-� ..
_ _ _ EW f- ,, �� ��y{ _ - UNLESS ALL SIGNATURES COMPLETED
\ . _ i" I� 5 ', � �>. i -- . _ . .. . _ - � - -
nV
. __�� - . - : '1" _ _ - - _ _ -
�
� �
i-_-___ .'. _ - -_ _- _ _ .- F �-'�Ct�,� � a �$ \\ _ " --_ _ _ I � .._ __ - - ' - _
.... , � PUE �—E � `4C�� �,. / _ _ p ---'� '� � � O
� •�, BeGiN / END�AFETY FENCE � � � � � �
�� � L- 7A/5+84 (RTl % WA77LE BGRRlER � - - 1�
� / � 7 .. �5� c�` . � � �' � BEGIN / END SAFETY FfNCE v�
. .�\ ._.. . �:;�� / ,)S' .;IFadf� , � L t srkz,+�3 rRr, �'A
JG_,_ ,. N.1r2;1 / y,.l ' �5" RCP-IV � / DRAIN POND PRIOR 7
W3 GB �343 PG 91T � / TO CONSTRUCTION O
MECHANIZED CLEARING IN WETLANDS = 0.0 Ac /0 SF �. � �5'
FILL IN WETLANDS = 0.0 Ac /0 SF O .��� �� .� � ` � �OJ,
IMPACTS IN SURFACE WATER = 0 LF �. /�' \ O
� �5 F � �
j' ^ � LEGEN�
��� - \\ �. F �AI�L If 1 fkt.iA' , . ' '�' ' DENOTFS MFCHANIZED
�� O :��io?1 f___ � nl ..�1 I _. CLEARING
SKETCH OF BRIDGE IN RELATIONSHIP TO PAVEMENT . \! ,
BEGIN AFPFOACH SLA6 NOT TO SCn�E �
J, � DENOTES FILL IN
-L- POT STA 18.�.16....,'- �.. wennNo
BEGIN BRIDGE - \�, O W4 � DENOTES IMPACTS w
-- -F28-��- �- MECHANIZED CLEARING IN WETLANDS = 0.0 Ac/0 SF SURFACE WATER
� FILL IN WETLANDS = 0.0 Ac/0 SF
-_ . ' '\ . La i Tlc' G q.=:;_ Fd,a i?tiFWS� .➢R, IMPACTS IN SURFACE WATER = 29 LF
i . __;. Ht�;ll'�u' P'�i�;i+501d N�4T':H[Kj
S
- /� \ ClG �irip P4 65�
1
� I
�,
END CONSTRUCiION
-L � I RIP �PDET �IBANKMENT \ -DRVI- POC STA 11+40.00
� i I Noi ro scaml
l %
. __-- , / 5'min
�ND BRIDGE - � j e� ��, - i.om�� ` ; zo'
-L- POT STA 19+73+/- E���n��� �
. j5� �S j . �-�
/ GEOiEXiILE — Sireuni
�
Bed
' END APPROACH SLAB � *r„- or���,e.- so �o�is, ei u n�p aap
` -L- POT $TA 19+25-/- croic.��i-= so �
FROM -L- STA. IB'�. 92 TO STA. 19 i 01
. ___ __ _ ___ __ . . . . .
. ___ i __ _ . ___ __ . . . . .
. _. �'__ _. � _. _._.-_ � __._.-_ . ___.___ . __.___ .
. . . . i ._._. .- . . . . . . __.__ __.___ - -__ �__._ . . . . . . . . . . . , . . . . . . . . . . . . _._.__._ ___._.__ _. _._.-__ __._._._.- .
= BM#1 - SPIKE IN 24" p�NE ,�;- -- ��,,, f _ m,_ _" m, __ __ � - --- -- �� - �� ---
�
�,T ; ' ; ; � I- -; �T =�--
-- �T . . _ - -- . . - -- - _ - - _
- - - - - -- - -_. .. - -_: ---- _ ', : , �T
-L- STA 22 +66.31, 32.86' LT � � � � � � � � ' - --- - ___� -- - - - - �- - - -- __._ - -
ELEV. - 129.01' � __ _ -' : en�� ru,�e .. D � � �
� BEGIN GRADE , � �
' _ ��- ' � � � ELEV. G 13q 57
. . ; � . . - L A +90,OQ � � 'r . -: i T �--�i- . . � � � T -
--
� �JO � MATERIAt TO': BE REMOVEI3 : -�� '- � - �-. EtEV. = 133.90 - -- - - ; � - � - - - - - � �JO -- __ �_ - � �JO
- ___� �.wS-EL � .�� , __4 P - 79+90.00..- _ BE�lN I.Ai�� �-
�. �. �. . �. : �. . ' : - -- T -�, ; . _ . _. i ��- i StlRVEY 0! 2i-i6� : : - � ���_ : �. _ �. . . DRU . : -� r- �
- -
, PI = 17+00.00 - ��-�r � --- --r VC = ,120'9 - �rT - � -- 51 � 10 13 98i - -�
i - - - i - -- _ i_ : _ :� = EL = 131.65 - -r - - - - - - - - -- - -- �CEV. . . ___ __
'- _ -
. _ , .�_� __. . __._._ . . � -- i_�i-- - .: : .'- - ' _ VC = 220' - i__. _ ,_ --� -- �� � - ---- _ - � - - - - �L-: -- - � -- -- � -- -- � - - - -- - -
--- K 163 �
� _ _-- - - - { -- ' �r-rT
1 0 17
�4� - - -:i-_ K = 137 - V = 66 MPH - �4� -JI --:: -:: - �'_ �4�
. . � - �rrT -- -- -i- V = GO MPH �r�-�� m� - -r--�r�-i �� �- r ��r �r�- � �. _ - - � -'- : `- -_ . : , . . �--
� �
� = � ` �T _ i _ : � i �� Tn-rrr� - - - - �r� r - - �- - - f -�r �r� � -- i -- T � -
r- -- - - - _ _ i -- � - - - - -- -- _- -- - - -- - --- __ - - - - - -- __ ___ - - -- -
--- - - - - - - - - - - . . -- �_ -. - - - - _ -- _ - -- - - -- --- -- - - - - - - - -- -_ _ � ___ - - -- -- -
� - - ' - - — --- --- -- ' � '� �u_ __ , - . _ � _ -
-- -� - � _- -- : i _ _;� - � -- -- �-
' - - -� _— - i - . . ._)0: 3d5% ; . t : � � -- -I � .
�
� �
130 � --_ , __- T --, _�= r -- � , _ !(-)z-.oas r _ — _ _ ry - , _� � _ _ 130 — _aaozf� - - - = 130
- --- --� -- ---- ------- ----- -- _-- - - --- —_ -- �
,�1 - � - .L �_�__ L� �'_ L� � L�', - �_. _ '�.
i_ i.. �: t)0.306 _ ��_� � � i _
— f �
� i ... i ii i. iL .i _ui iui ii__i i.—. � '" _
� �-� � �L� �_,_�� � t. �1 � �, � � I I � �.�� L,_Lk_�� �;_ i_�1� �„ i 1�-� ' «-. � I/ ��-_
�
,
_, _
' rl- i- 7 r ' ' - � I n V �j i -�-r J-r rr r�-rr� ,-�� t' _
120 BRIDGE HYDRAUUC DATA ,'-'- , ,�-�,__�1u,_� u;i; u. � ii; : - s6^ ece � 120 �, - _ 1--�i 120
I-� I � I "; �I �-�� I-�i � r t � i �'� --� � i' � � '- —��� �. _
�
.. i l_ 1 LL _I1 L I 1 - 1_ �� 1 _ J_1 �_ L 1_ I 1 � i . _ .. .. N I I _' . . �� P . . � . I_ -._. _ . .- . � � �; �. . . . � . _ i � ._— . I i. � J l L_! _l.l �
... _ �_ ... i . . !i.. �.i � � ��� '- 1..!
DESIGN DISCHARGE 600 CFS -i 1 µ. �, � r �— �. � ��� �� . , ���,_ �.
� � � L �� .. L� ��_ . �«_ . L� �� �
DESIGN FREQUENCY _ 25 YRS �_ _ ��_ _� i �� L__ L_� __ � �_� � ���_ _ �� �_�_ .', F m� ', PIPSta.20 �00.8UL30' �PT N L- : 1L .,
_ r � r r -r� r J.-_: , o I _ ---. . 110
��O _ I-� I-� F Z� ��O I� EDRVIGRADE11�49�0 __ liL u'
BASE DISCHARGE - 900 CFS � �' t i I' t I _ L_ ELEV. = 130.75 -
BASE FREQUENCY l00 YRS _ ORAINAGE AREA 68 AC
l N H W L A l N - l -u- r -1-_
i
OVERTOPPINGEDISCHARGE _ 1300(+1 CFS Y tL, � �� � �, ���-� f�_i .-�� �� _t' DES�GN FREOUENCY 25 YRS L, - �
_ � iu — u. �
_l . ll !_l . . L I_ _ L ! ._.. _ L !_ . . . LL . . . . . J .
� �_ _ _ L. � DES16N DISCHARGE = 25 CFS �uu . i � 1_ �_-:�f.
100 - � �� +��N� i-� �-- �_ r i 100 � , -- - - ---I- 100
OVERTOPPING FREOUENCY- �500(+1 YRS ;_ r_� �._ 17.r_� 1.. r_� ! 7 _
Yr - .r Y' " . - DESIGN HW ELEVATION = 1252 FT -r-----
r t t. 7r_il 7r� r' r— r. '--` � --
� OVERTOPPING ELEVATION = /30.50 FT _'- � r I � , �u__ �1_[��_ . _ u — 1_�. �— iL_ _ �i i_ -i�[--�Li— [_!_! l00 YEAR DISCHARGE = 40 CFS t-_. ._i Lr �it-�. . _-- . t _ : : _ :_ -:_i'.
� t t_�_ 1�_�1 � �1_ � t t_ �-�t ��-tLt_�-t 7�t-�� f�LL�-k t�i� '-�k t� � l00 YEAR HW ELEVATION = 126.44 FT i- �t� -:���' � - -- �
� _� . �� < < . . L ' i �`�` � . . .. L � �_� �_� L � � �_,— �� �
�µ i 1 - i 1-- µ �- i i-- i i ri-r i -r i', I OVERTOPPING FREOUENL'Y= �500(+l YRS �' +--J+- � ;_ � -�1 _ �_-:�f:
� � �_ Li _ < < < � � � < < � _ ,_� i--
"- 90 DATE OF SURVEY = 07-21-16 _ : -- � -- � �� � + OVERTOPPING DISCHARGE = 60�+1 CFS , _ 90 I _,_ _ r-�_ *�; ,- , - 90
' ,�_ -u ,_ .�1_�. , �_� � � � 1�I , i �1�-, < < _ �i _ �� ;_i_ u . I i. � _ � � � � -- _ � __
_ WS.ELEVATION _ FT � � �i �' �—'—,�� � �—' �— '-`�'- OVERTOPPING ELEVATION = 1305 FT L , +`- �
1�i _ Lu i._ �1_u� � ' I
� AT DATE OF SURVEY - 12353 � µ� � . . L� i � �-�L �_� _ �L � ; �-� ��� 1 � ��L � �L�_i_k_ �k w � , _. 1 . LL �, � < < ' �;�� � L; � �� . � � ,_��� � � �i " I :
�� L
8� = z� - _ � L - ":� � :_ :.:� t :_ ::� �=i = i = z� � -, _ : � � r r� : � _ -t �7. : 80 rt- - �C1T �Cl L-'T L�t }T LT'i- � 8�
�, �� � � �� � � -
�„
LL
-,�' 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 10+00 11+00 12+00
� �_ �
_ �' -�
BE��N TIP PRO ECT 17BP.3.R.53 �/�/ETLAND & STREAM IMPACTS WNTB HNTB NORTH CAROLINA, P.�.
,f 343 E. Six Fo�ks Roatl, Suite 200
_I �\� -j,- I��C STli IS-�9o.�0 Raleigh, North Carolina 27609
NC LiCense No: C-1554
� �\
\ W? rLOATING RIP-RAP AT EMBANKMENT
_ L 1 '� MECHANIZED CLEARING IN WETLANDS = 0.07 Ac /427 SF TURBIDI7Y SEE DEfAIL 1 ��`
Bt��ld / EN[1 $.=iFEii FFN('E
FILL IN WETLANDS = <0.01 Ac/188 SF CURTAIN -L- STq.20+i8 ii_Tl
IMPACTS IN SURfACE WATER = 0 LF -L- STA 19+71,75 =
���� �_ L�L.I� `� � unniis oF _ -ORVI- STA IO�OO.00 �S � MEGHANIZED CLEARING IN W,ETLANDS = 0.0 Ac/0 SF
\ ` P.I j� FILL IN WETLANDS = 0.0 Ac/0 SF
� � ._:= ' � �� - IMPACTS W SURFACE WATER = 32 LF
ii N (
_. - . . QEGIN / E-L� 5 A15+82 lLTI+ i 1 ' ,. . .. . � . ¢. - �
, � L' ,- , -.5-- - J END TIP PRO ECT 17BP.3.R.53
' i �' � � � 1 � - " ` -L- POT STA 20 + 50.00
� ,. . _ F . -is
� i
• �
- � �� � �- ,�, �v i m -
i
. . .. t � �: �� �
;, � �
.� - _ � , � i�t �
i `
�= . _ s _ _a. i � � � , r w.� �. � 1 _:- --�- -
_ - - -. _. _ i ,, , . �, .
���� \ �PDE�
-- - EW �'. �. � � - _
�� 5
� � __,< - a
� � ,
�------ �.. PUE --- --�� C � \�� :
� � �, BeG�N / END�r�FETY FEfJCE � E ��
L- 7A/S+gq (RT1 WA77LE BGRRfER . J
�
.\ " ' j5 :.. ��
`�.�� , 74dfiLi %'¢ // '
W3 �'�. . 15" RCP-IV
U6 i nJ PG 91T
MECHANIZED CLEARING IN WETLANDS = 0.0 Ac/0 SF �`. � .-�Y�
FILL IN WETLANDS = 0.0 Ac /0 SF O. ��'
IMPACTS W SURFACE WATER = 0 LF �. -
. � ./jSJ� F �
/
� /
SKETCH OF BRIDGE IN RELATIONSHIP TO PAVEMENT \� a
BEGIN AFPFOACH SLA6 NOT TO SCn�E . ��':�
S
-L- POT STA 18 �t� 16 -...;_ �
BEGIN BRIDGE - . _ � ���.
-- +28-_ ui .�
__ � ' . . `\ . I i1'Ic t',Ai'rlrWj�J(�
i . ��ti� � at -i�iER � �t50rf N4T'HEwS
s
U ' I� P� 6�4
ZJ .._"-.i' 1 \
�
N I I
`�
a. -L � I RIP �PDET �IBANKMENT �,
� � , �o� �o s�a��,
_, � / 5'm�in_ \\
�ND BRIDGE _ x I e� ��, - i.om�� ` z.o
-L- POT STA 19+73+/- ' ; E���n���
. 15 � 1`' . - s,e��,
�
/ � GEOiEXiILE
Bed
' END APPROACH SLAB � *r„- or���,e.- so �o�is, ci u n�p aap
` -L- POT $TA 19+25-/- croic.��i-= so �
FROM -L- STA. IB'�. 92 TO STA. 19 i 01
_ _
I ._._. ._ . . . �_�_.__ __.___ - -__
. -._._ . 1 - . . . . . . . . �. . . �. . . i__._ _.1 _ _�_.___ -._ _�_.___ -._ _.___ __. _. '.__ _.. . . '.
= BM#1 - SPIKE IN 24" PINE � -- ��, -'�-- '� -- - *�
150
140
130
120
110
100
/,
=
�.-r,_._� -
� F . .----��1 . . �. - „ -
- ---...� �\
_ _ _ �
BEGIN / END SAFETY FfNCE /
L STA2l+l3 (R71
DRO.IN POND PRIOR
TO tONSTRUCTION /
O
� I',� t i f I..!ry' R \
�Ir<ul f.� 11 ..�.1 _ ��
,, ' �
W4
MECHANIZED CLEARING IN WETLANDS = 0.0 Ac/0 SF
FILL IN WETLANDS = 0.0 Ac/0 SF
IMPACTS IN SURFACE WATER = 29 LF
-ORVl- POC STA 11+40.00
1- -; - � �T ,T,-r,T,� ,T,�
_ , �T
-- -�- .;._ _ -- �- - --- --- - - - - -
- - _ , _ __ I -- L BEGIN GRADE ; �_ �� ` � � � EI1JD GRADE� �i i
ELEV. 129 Ol - + �
Ev �sa.5�
+ . � E
-- � � a +9a,00 � T T
� MATERIAt TO BE REMOVEI3 -:___ �� '. r-- � _j_ EtEV. = 133.90- - -_ -'-= - ,- ----- � - - - --- - ��JO
. - � _ _; -- --.-�. � - �:..-W.S-EL i - , . I . . . .. .. ��
i � �.,s 4 PI - 79+90.00 -- i.
- _ -- ��- sqrryEv or-zrib EL = 730.39'
- . ,T _ � PI = 17+00.00 - ��_ i --r VC = 120, - �rT -
-- r-
- - - i - - -�- ! _ i EL = 131.65 - - - - - -
, � . _ , - ' - --- - - - -- - - _ - - - -- --- -
_ __ __. __._ � --' i_�i-- - .. . ._- - - � --- _ VC = 220' i�_ �. � � � - �� ' --- - � �L- . .
�--rr
-� � --- - - - - � -- ' K 163
_ - -:i-_ K= 137 - V= 66 MPH -_- �4�
� �rrT -- -- -i- V = GO MPH �r �-��r�m� - -r--�r�- --. j- -- r ��r �r�- . .
_ ;' �
� - � �T I--_ --- -- -_
-- - - - - - -- _ _ _--' - _ -� - _ __ ��,-r,�r� __ __ =�r _---' : f � _ _ ��_
__:_ - :- -.- - - _,. _. . -- , - _ -_ - - - _ - - _-
� � - - --- - --- -- -_' � � . �u
-- -� - � _- -- _: i _ _;�
� _- - i - . . �)0: 3d5% ; . t : � �
--- - T -- � - - � , - I(-)2-.045 - - r i �30
, ' ? - -
- --- � -- ---- ------ ----- --- - --- - - -
�1 -- - I t 1 _ L� J L _ L� `-t�.
� � �� � � , � �, � � `. � � � ,� --�-r r
� 0.306
_i �Ti . : . i i i . i � ,+%� � , �j ,� , i i i�� .
. �Li i�_u i f�. u_+. i i i i I _ .�. � . i i. .
. : : � � µ I Y_ � . �. �. _ � i �. � . : _ �-rr�- �
BRIDGE HYDRAUUC DATA '- r '- ` � � � ` �� � � � - _ t � i � ; , ; , - � " 120
r � � -' I.-___ ' _
� J_L_LL_11J-1J - J-111 1S. �' i 11�� . � . .36" RCp �V �.
.. � l .1 L_ J1 .. LI 1_ _.. L 1. .. _ ll I. .. 1 f l_.1 . LI f l 1 _.... N I f. . I', � P .. i. -'__- I__-_ . _
I L L _ . I � l �_ j� 1 __ � 1 �_ � rt � . _ L� .� ; . � . y . . . _ . . . . �. . �. � �. . . . . �. .
DESIGN DISCHARGE = 600 CFS µ _ , � � �
1 1_ I 1 1. I w I.
r �_ __. -L- Sto.20+00.8 30' RCP- A
DESIGN FREQUENCY - 25 YRS [- r� + , � r� L� � i� m F PIPE HYDRAUUC DAT
DESIGN HW ELEVATION - 127A FT � � � . �� L _ _ L � �_ _ � � _ �. � � ��._ . i� < <_ .. ; , ¢ � 11 O
_i
BASE DISCHARGE - 900 CFS � �� � i-� �- - Z J N ---.
BASE FREQUENCY = l00 YRS � w� � pRAINAGE AREA = 68 AC
-7 r � t[_ Z� 1. 7 r_� � r_� t. 7 r � t rg� t r! :
BASE HW ELEVATION = 1279 FT �- �-�- � �{-� �- �= 1- � �. � DES�GN FREOUENCY = 25 YRS
_i. �� �_i.. L �__ L�..._L ��_-µ- ��._L ��
OVERTOPPlN6 DISCHAR6E _ 1300(+) CFS ,,_ tL� _ � i, -�L �,_�1 �, 7 t � � �� , Ei: , DES16N DISCHARGE = 25 CFS
� ::. �� +�,�� i� �-. _ r j 100
OVERTOPPING FREOUENCY= �500(+1 YRS :_' Y r � i';_ r_� �.--�7 r_� 1.. _r_� � 7 t � �. 7 - DESIGN HW ELEVATION = 1252 FT
r t t. 7r il 7r�i-1 r'. , r--
OVERTOPPING ELEVATION =/30.50 FT .',- � r �_ ,, � r ��__ �1_r��_ ,, _ u-, 1_�. �- i�_ -, , r-� �__ �I'�,u'�- [_;_: ;_ l00 YEAR DISCHARGE = 40 CFS
� ; � ` �� tLi _`-` � �� i �-1 � i < < �- � �L �-� � � L �-f �-�� �-f �-tLi_� � 7tit-i� f �L�-i-E ��i� '-�E i� � � � l00 YEAR HW ELEVATION = 126.44 FT
� � � ' � i-� - � � OVERTOPPING FREOUENCY= �5001+1 YRS �� � � � �
� �
90 � - i 90
DATE OF SURVEY = 07-2/-l6 __ . _ � -- � � -- �, - �, - �, - � � - � � - � � �-�-r � r � ' OVERTOPPING DISCHARGE = 60�+1 CFS ,
- --
�__u, , � _L_<<..�iE k --
,, 1�� � Lu ,._ �1_u, �1_�. ,_ , Lu _, 1�� ,. �1�_, � �_�_,_� u� _� � �
- 12353 FT ; � � ��� �-� �L� L,�L � L � � � L , . �_ � OVERTOPPING ELEVATION = 1305 FT
WS.ELEVATION � � _ �< < �" �-
i �. ._ . i i_ - ��i � i �� � �i� - �� + �� �
AT DATE OF SURVEY - µ , � �-Ei1 � � - �L � ' _ _ ';
8� -- . Ll __ . ." 1 L - ":� 1 :_ :.:� �f :_ ::� �=i = i = Zl � -, _ : � � r r� : 1 = -r 17 . I :
i �
'�: �: - - : � 8�
PROJECT REFERENCE NO. SHEET NO.
17BP.3.R.53 4
fLW SHEEf NO.
ROADwAY DESIGN HYDRAUlICS
ENGINEER ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
�"�O
LEGEN�
' '�' ' DENOTES MECHANIZED
CLEARING
� DENOTES FILL IN
WETLAND
�DENOTES IMPACTS IN
SURFACE WATER
2O`
_-_ -�: _
- -- _:- - - _
- DRV1 �
- - T-
-- _- -�--
Bi:vlN 4�AG� � -
-DRV1 S1A 10 13 98' -�-
�-
� _- �LEV. 130:1Z __ �--_
-- - � ---- -_ - �__
-_ - � ___ __ - �-
� __ , _ T�-_
_- __ � __ �-__ _ - -_ -
- � __ - �
- -! - '
-- =4b42f! --- - -
�_. --- � _ 1
-- � f - ---
f_�.'. �
«_. I i � _��--:' .
� _ �� _
,-r � ��
rCL_ -L .1 . . . . :_ LL_ -�-L �. .
l L L 1... ... "-- Jy l L l.ly .�
i1Lu �� . . . . . 1 � J_LLLu -LLL. .
�
�.. . . . . . � - � ,
�_ ��_ __
i.i- END GRADE 1 i L_� _u :
��� -DRVT- STA 11 t 49 �0 __
�L_ � : ELEV. = 130.75 - _ *
ri ,- ' �.
�iL , _ - �
� i�u i i 1 i- .�
� - - ---
r- *rLC �r , � -_*'
t-_. _i_ i t-! . _i.
- �-
. LLL J+LLLILI 1LL.0 _ �. _.J1. .
i LLLi 1 �.: L.1L�_ �. � i1 . i__.11 .
1 -
__ f_T.i �r r_. __ -.
-_ - ' ,-, i _ _ . _ � ._ _._
. l LL _. .LLLI 1 l l LL11L1 L_:_I ll l.l 1_Lll1l L. 111. .
� i��� :� ��� ��������_ ���
� :: ;.. '
.: Ct�- -. : �C1T : �Cl _LCiT tt iT t�-i- � . .
14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 10+00 11+00 12+00
150
140
130
�2�
110
100
90
8�
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 -L- STA. 17+28 TO STA. 19+01 21" CORED SLAB BRIDGE <0.01 0.00 0.00 0.01 0 0 0 61* 0 0
TOTALS: <0.01 0.00 0.00 0.01 0 0 0 61 * 0 0
NOTES:
Permanent Fill in Wetlands: 188 sq. ft.
Mechanized Clearing in Wetlands: 427 sq. ft.
'Bank Stablization
Projec! 7'racking Na.:
i 6-o�-oa43
Nd NATI4NAL REGISTER UF HISTORIC PLACES
o����, ELIGIBIJE UR LISTED ARCHAE�LOGICAL SITES � ��
, ; a,
q.8 c� �
` � �', � PRESENT FURM r��� � � n
���� :�: ���� � F=
�_o�°' . This fortn only pertains to ARCHAEDLOGICAL RES�URCES for this project, It is nat �; ��.:�' ,
•.•.. , r�
�`�-�`;�� valid for Nistori� Architecture and Landscapes. You must �onsuit separately with the ��7..0
Historic Architecture and Landscapes Group.
PRU,IECT INFORMATIUN
Projecl No.
WI�S No:
F.A. Na:
Bridge 148
f id �3 a[c�l .��cJ
nla
Federal Permit Required?
Counly.• Sampson
Dacument: MCC
Fundirag.• � State ❑ Federal
� Yes ❑ No Permit 7'ype: NWP14
Project Description: The replacement of Bridge No. 148 o�er Mil1 Swamp on SR 1434 (Huntley School
Road) in 5ampson County, North Caroiina. The archaeologi�al Area of Potentiai Effects {APE) is
centered on the hridge structu�'e and measures 6�6ft. in length (3U�ft, from each bridge end-point} and
150ft. in width {75ft. fram each side of the SR 1434 center-line).
SUMMARY QF ARCHAEULUGICAL FINDII�GS
The Nortlr Carolina Depar�ment oj Tra�tsporlrrtion {NCDDTj Arcltnevlogy Graup reviewed Nte subject
project and determ��ed.•
� There are no National Register listed or eligible ARCHAEOL�GICAL SITES present
within the project's area of potential effects. (Atta�h any notes or documents as needed)
� No subsurface archaeolagical in�estigativns were required for this project.
❑ Subsurface in�estigations did nat re�eal the presence �f any ar�haeolagical resources.
❑ Subsurface in�estigativns did not re�eal the presence af any archaeolagical resources
considered eligible for the National Register.
❑ All identified archaealogical sites located within the APE ha�e been considered and all
compliance for archaealogical resources with Secti�n ld6 of the National Historic
Preser�ation Acf and GS 121-12(a} has been completed for this prvject.
Brref rlescriptian of review artivitres, resulls nJreview, a�rr! conclusia�rs:
Ta determine the cultural resaurce p�tential of the APE, numerou5 sources af information were
cansidered. First, preliminary constructinn design, funding, and other data was examined for defining
tF�e patential impacts to the APE grvund surfaces and far determining the level of effort necessary for
campliance. In this case, the project is state-funded with federal permit interaction and subject to
5ection 1D6 of the National Historic Preservation Act. Next, a map review and site file search was
canducted at the Dffice of State Arehaeology {OSA) on Thursday� �ctober 6, 201fi. Dne pre�inusly
documented archaeologica! site �31SP235) has been recorded directly adjacent to the project's APE.
Identified as Matthew'S Miil on the archaeological site farm, the site was recorded by the �SA in 1981.
31SP235 constitutes the abo�e-ground remains of a dam, mill, and mill pond. This cultural resaur�e
remains unassessed for Natianal Register of Histnric Places �NRHP} eligibility.
"NU NA'I'1DNAI. Rli[7LS7ISH liIJG1RI.li OR !.lST H.O ARC'HAI:pf.Ck:IC.lI, S1TI:SYRIiS1iN7"'
farilr jor!!te Ame+�rled Adrrror 7'rair.cpnrlaliw� Projecas us Qirnfrfred iti fhe 24�7 Pmgmu�nra�rc Rgreernerrl.
l of 2
Prajecl Tracking No.:
16-09-0043
Examination of NRHP, 5tate 5tudy Listed {5Ly, Lacalfy Oesignated {LDy, Determined Eligihle (�Ej, and
5urveyed 5ite (SSj properties employing resources available on the North Carolina 5tate Historic
Preservation Dffice �NC5HP0) website illustrated that the Matthew's Mill location is also known as the
Rob Crumpler Mill and situated in the southeastern project quadrant but beyond the limits af the APE. It
is currently unknown if any other abave-graund or subsurface remnants af the mill may extend into the
currently defined APE. Furthermore, historic maps af Sampsan County were appraised for former
structure locatians, land use patterns, or other canfirmatian af histari� occupation in the project vicinity
and archaealogical/hi5torical referenee materials were re�iewed as well.
In addition, topvgraphic, �eningic, flaad boundary, lidar, and NRCS soil survey maps were referenced for
the e�aluation of geomorphalagical, pedeological, hydrological, and other environmental-type elements
that may ha�e resulted in past nccupation at Chis location. Finally, review af aerial and on-grnund images
�NCDOT Spatial Data Viewer, Goagle, ARC-G15j afforded first-hand per5peetives of the overall study area
which were useful for assessing localixed disturbances, bath natural and human induced� which
cnmpromise the integrity of archaeofogical site5/deposits,
Based on the presen�e of a previously recarded archaeolagical site �315P235j an in-field reeannaissance
and survey of the site [acation is reeommended prior to con5truction/replacement activities. This survey
work will seek to determine if any portion of 315P235 extends inta the APE and will e�aluate the
resaurce for NRHP eligibility if contained within the project boundaries.
A reconnaissance in�estigation of the project area was completed hy NCOQT archaeologists 5cott
Hal�nrsen and Damon Jones on Friday, Oetober 28, 2016. No portian of 31SP235 is located within the
pre5ently defined APE. The mill structure is located a caupie of hundred feet fram the eastern APE
baundary. Also, there are no mill efements {mill race, dam, etc.} cantained in the APE. The mill dam,
situated east of the APE, was breeched during Hurricane Mathew by the falling of a giant tree. The
entire contents of the mill pond emptied over and through the dam flooding the entire APE. During aur
�isit, some two weeks later, e�idence of the flood was still �isible in the APE. 7he northern and
southwestern quadrants still contained ponded water, while the southeastern quadrant is a natural spill-
way fnr the dam. Because of these condtions, and since the APE is already underlain hy frequently
flooded and poorly drained soils (BHj, no shovel testing was necessary ta confirm the absence af
significant archaeological re5nurces. Na further arehaeological wor[c or consultatian will be needed for
the project as proposed.
SUPPURT DUCUMENTATI�N
See attached: � Map(s} � Pre�ious Sur�ey Info
5igned:
f►C�iI� ITi��. ZiT:Irxl]�L�Ie��lli
❑ Phatos ❑Correspondence
�l' rs'zr� �
Date
"N(] NA7'ICJN.4I. RIiCIST�R F.'I,IGIRI,Ii pR IJST7i!] AR(.'NAI;CII,(1GICAL S17TsS !'HliSIiN7"'
forrii ja• �Ire Amerxfed Mi�rw• 7}n��sparrnrran Projecls u.s !]rralified i�r fltr 20071'rogramma7rc Rgrren�rn�.
2 of 2
PaI1�:P:iGeaCwaWrjemis526i84053V1]Q_OBIGI�Yig_vndroly V2mxtl E1a1e.971UP20�188-17�.59AM
.. • � � � . t,:Crn * �, , �� � �
i f4'p�n � � ' � � r
' �� � ��iS,l, . � �
:� �y��� ' I , /. .. � *4 . � .� ., :�'i� .�. �i`^•. - .F-
�i� �"`.4.�'i'� 1r.'� h �E�1� '
r ..' b j,rb� � �o • '� ' -
a �
� � `� �� ' a . . j � f � �� �
_�-~ " ; ,` Cem . . 14N� /� ` � �{ �` ( i 1 I�
� � � /} I•`�' �+.i� \ /�
,� . � �� _� �
� "' w \. - `�' - �� �� �+"w •_ �� �4 . �yd� � �_ b
�`\ "` ? I ` r�`1 }��
i�
�' :. � `�- � {� : - � ' 4,'� I ' �' �S�
.• ; � ``' ` �+ , • � ""` 1 i
" .. � � •. i . _`��r� I: I ' � ;iu;
( � " - �� ! , ' ..,._.. s_ h � , I
_ � ;.� , � ! � �, � .� �� \ � ri�� . � , - :-� �__ f , � ".�'
.
� � � . . `•_ .. _ 1r'� * : �... . - ' `� `.�� 1 1 ` � • . .
~_�• ` �
♦. , ! ����� � FYft�O� DC � �,,
., � < - , sx - �. � �" ""� � Ch' ��� 187/�
�, �.«' � . �" " � � r r - ' i `� 1 � � !
r, � � � �-:.----�
_ -;� �� � t � � �
_ �t ' �� �� . �. �, , .
M �� � aM�M�a+a�a . F{U�ILPIMi� I
� -' 1 - ,
�.i� c�„`�� P
� + �'.� � ( c:Qm..Cem +Heir�tic�� �,� • . e��+yp,�
� _' �i ,, �ssl^ .�,, � i �._�, � J
. ` ,- ., � �: ',*.� -� ; «rs, . � , j�" l. �.
1 _'"�� � '\. ; � I J ��, � � , � �'� '%� � � '
� . `� f, � � /I
�� � � _ � -« + , . . . � �/ / '��. _ . � �� : " ��- �
..• ti �; � / ({ ', I�
� w �' '�`: f'r � `- -
-. -� :�� /J r } `
� �F�+ ,./� .y� �� I�� �\`. �'}. ��\M1. ^.� � r j;' �'J \/'�
..ti �. .� -- � r�� � 1, � „ . .�.
� _. . _ . >
- —�-.�_ '- �� ," � + r` . : �,� �`. � . � � i ____�
',, ,
k: � � � - ,31i1f � � 71i �}�:I ; ,�:_ � �"—`
. « •_ / �" � !� �.,.I -�_ . Qm �
�L��-,. �v '� .ritl[i u ,1 ( � ���" I �.;�I �
� �, .. '' � ,_� .3i(7(fr�alu: b � �,'�,� t i . \
: ^ _ �. f : . � � � �i,. �'-,--.
'^ M � , I �� �� BR 1 `• • ' � �, �''ri'A! 1' � ' '
.. � ��' � ��' � � � � `t. . 1�fr' �. - . . . �
-► CY�i aMf�ir�' �' �3b i-. � � -� - � , • /.
, -, '"' �{�r � .1fi11pr»�tl •..y 1. �: 1 `
� ._ ` "�r��,� 1 j � � , � `' '�� r�' / i ' t �`� `1,ti \_ �' � \:
.. - t ' �r ' ��~.� � � �''�.-�i �
. 1 � . � - �.
, / ---- - 'k' ,
�1,� ; - ' ; ? -� � �' E � , � � .
�.,
�" , -�� ' �� • _ �s6`f •--, � j ;�� %�
� ' �6R•ro9 , �\ v � � � �� ` ' �� /
' �. �ti!v-�\- � ,� , . � ; `�—� ! �6 i� -• `
-"';, . / `� •�,!� ' ICiwkihCA • , Ce� , 't � • • .� �
�^ � . � �Ctrn `�/`� � . Qom�, �\�
w � l f
` � r�; � . L� ♦ )
— �s. r ,j, � . \ `.. ``\ P 1���� 'jd �
. ;�� ' ( � �� • � ��`.1 \� / �r����
; cem, � ���� �`� a ; ,; �
. `,,ts4 I' � `/"�--`� � -� •—_�
.. [� �J r
� ' � '/, " '. (,� . ..' 1 ; � � � `i-v\-•� `•. \ y .
�►. �',i /� � _ l-: titi � NNN�' �\ ��� ��\
� i . . r / ♦ � ...�'� -\_� ,`�_ � . - — .
• t � ;f r'-.. ' • i �� _ . _ 1. �'q� - — -
� /it�� CiQ711..'�• `, - �_ ./ \..;�1li \ ``\ r � ,��1� .
/ 1
�r �'� � � � � J
� , CP �'� - ,.,��r r` �i<}i' ��' ���� �1,:r�,.` I �
,\ � „ ��e.���h;�� -�.,, � "�� :��. i i�� ` ; ,'�
, '� - �3_, - �_� � , �
, � �. • ` �--_ i:�a �iBM t73 � ` r ; ~
�� Pca'ect Stud A�ea � � ���' - � . F ; � — %
a �` '.r �
a ,000 �oo�a ���\ � ��,i�i� �� �, _� � �--,-- _ �
�� , ( ,� �--� ,, .,
'�; �:,
F�el � � �. ,'. � ji- � � , -
&ource: USGS Digilal Raster Graphkcs, 8alemGurg ���° �" j= � � � ' - 1�_ ' �
C}�adrangle. NL', 1593; PcoJect B�oundary � .o+ ! '� � � �V` ----�;'�-'�� . �
appraxim��atecf by ESI. - �/ . � , _
�+� •..�.. � -} ���!�:
boscEaimer The nlnr�na[ an dopldod on Ihis figure is tac , , '�� S � Y f��", \� - �"� '
mlormetional purpases only mnd was nul prepaccd for. and is �t �'- � � � � �, \�
notsw[ehielorlegalurungiruao�ingpuuposes. , �, �, ��;�oRyright:� 20��1+3 Natoanal Geo,g�ap�iic S6 �efy�� be�S���
t`�Uk µbR1M �,��� J
^�' Y
. ,�
� ��
� �N
Fa1h:IP:1GnoGr�+PioJadsl3016W5310@_OSlG9S�g_IoPu_w2.rrtxd Dale:3?l2a1s2:58�72PM
P��ject: ER16053.07
Date: Nla�` 20'f 6
Dr�wr�IChkd: KTlRT
Figure: 1
i r — �* . ,. _,�,,� —
, _ . ; :��,r .r , - a �n �, � ' � r � � � � t'j _ ,` �
. � , ,���� �+
r ,sv� �:. . �t, ' �� �,; � a �
� µ
..'-0a . .� �?��. �4 � 3 ai i i - -.
�� - � �{'�S, � � � � � ,��F�� � 7 ' ' �
.,rl « �t�� � { � t ' ' �- '.i ,f
� U � , ��. 4..
t- ' �lyda �- I � -� r +� -
_ ! ��,�� , �y i j { .,� ; �� . �' �J 7 , �._,
�j� "n: �. � �=L ' ,'•"�: _• L . �� '���'L •__ �� �. '� �• ��
=�ti � : , ,, .- , ,�„���, , - , �, �r ; •v
�. � �. ,r� 'r �'•�.' l.r'
_ � ,� • � y� �t i �;.
�� n''�� � �� . � ~ ,, t ,•,'�`�'� ,
�: � ' � - .^ _ ' - .f �' � �
. . . � ��.'ry _ - '.i1'{F� � � � �� -- '•�,
. . ... . . �I �� _ h _- � .Y� #�� � � � Ae,
z
'i'' :�� v�i�= " �
� ' � �i
�{ ^��y�,� � x
� . . , fl . �A � .�- �. �..r . ;R3"�'. . '( -
• ta .P M 5 .. � ��t�
, _ ' �.��3 � ��� [` .
, ' ;; . . �� ''.�, ��' �? >� ��' ��� �„t � ji �
r :T -� �
� ,��',!�
�.
i ' � .� � ����`s... i � . . �. ' � � �
;
ry' .�•...i.r, r•Lr ..�� .f�' ,J ,/ . 'r .��1? �' �
... `-�:fG�. - � _ �� , .
� _ Y '
��a � Y;� q,. ���
' �_ R� ,,.+ i II ,I . , . . ,
� i
n ',� ,�r_ .: �i iP,y � �.
. , ' � r i 1� � �
. . .. � .��u. �a
~. . . � 5�N ��..\i�:l ; � ��t?�
. i '� . _ � _ . . :7��
:-�' �� � '� .. . . .
� ..� ��-_ .,+, . . `_'.
. ��- :;, t _ � r �_.,���r1�.
* . � � . .� � �' j ��� � I. K �F���7.
- r ' � y� .'!�' ,�i
., - .- .,C .�� +3-';��,, r w':K�iN; :
o i
: � ''NI
� t ' . 1�
=�r,
r.,
k �
.G
�����;�- ���� � � �1, �,� �,' -'�' � �
.�� ., w.,
; ,.
�,�� ;
� '� ,� � " � � .
� ;F�, •, � ,- _ t� , � �, -
�i�' � .' �r ;;iS t - � �l
. ": :1F ,..., L - - �� � i � ,Z: .
� , � ,. ' �� _ sV�
� !� �{ � , , � j'• as r; k .°�
, „�
��rf f� '� Y., .- � .._
g ��'�y� 1
}� f ''�� y�, �,� 1�' i .. Y �. t
x • � '�,
� Rroject Study Area � �1' ,.' �,� t�+� ,�, `i}�
� � �, � , �� ��
Elevafiian �.;� �,+, ;� , :r f �;
,
, „ R �,���,t { = ..�
- H ig h .,,r+.."z � r�i, f��,��''' ,
n+� -�'� ��,�
� �„�i' � •', -
�1 ` .
I�I � "> r t�.'; �,N
� �.ow �� � .', � � �'� !'.
o sao i aaa `„
q• �,y,, "�
��
L J. i
FBet � �1 -� "�' .. Z�� 1� �. `-��
Source:FVigh Resqlulian NC Statewide � � � � � °� ' ! „�
6rihoim�a9ery. CGIA. 2672: �}�,, . ��'�� , ' _ ` .I�:.�
Projecl Bouneary approximaled 6y ESI. �'�{�� 5��,� �.�' ' �,
ir:
Oisclalmar. The infarmallon d'eplcEed on Ihis fgurc is !or �� ` ';� ': t-�,
inFormauanalpmrposeso�rya�iwasnotpre��arer{for, Y�+„ +�. E�INap, N•' nY�.r�torU�ur.�i�aK�hi• Inf rrna���°���n .nd�.naly�sis, hJ�'G
antl Is no1 switahle for logal or ongfn¢a�tl�g purposes. } . ,�
. ��-� � � � � .,.��' I
r`�q` wouiw p,�q�r.
;; k�
. ,
�
O 4T
y��u}y�
Pa1h: P:IGsoGra+Pes��elsV2018t653b�_OS4GISYfy_litlar_V2.mxd Dflte: 319f2698 9;s6�A5 AM
Proj@ct: �ER16�5�.Q7
�ate: Mar 2016
DrwrrlChkd: KTIRT
Fi�ure: 3
��igure 4: 5alernburg t�pog�aphic map detailirrg tloe Ic�catian arud boundarues of the prvject area in 5�mps�n Gounty, I�o�th Carniin,
FigGre 5: ARCGnS map detaifin� khe location and boundaries of the project area in Sampson Gouraty, Narth� Ga�olina.
�
SP052S JahrtC.lMiUiams �
HOu'SE
S6'0525 ES. iMill'pms
Hause
.,1�'.F . �e`�
, ,�: .�^- ,� ,� 'I�_
:X.:
: - ��� � �
� '�
^� �
.., #--� .
= -> r :s°� c1F �
i ,� .r `� � �' ' �c
. i,:. -'-: . µ: - , ef'•'�= �
- - _� �_�:
titi
-. .�
� 4t
e� ��
J�
r�
o�,h
�ry
_ SPO��� Robert Crumpl�r
_ �'aA M� SO�� yous�
- 5�0532 �to5 �rump�er
_ - _',,f�:_ •'" _ - twlilfl
����_ _ - -- '
�r
��1f<<
i,�� :
�r e �Y�f
:; 'tl+tir`� � 'Ra ry+�,,�y � `��} � a
,r�- _-}_ _ �i'o51$ kouss
. �c�
�x. _ _ �
j �� 1,� • i � .-��. �.�.
� :if. - , - • t��
e} �� �1
r `ti� ,
_ �'r
_ ' ' _ _ ' S.'.
_ _ ' . . . _ -i�
: vt;: . . . .., — �
y �:,1,_ -
v _
f
±%_r
SP051�a ��ws"hlail�nd
jr
Cl iiOUS�'
�/ �
/�� �,-b
v
F
J
C
v
�
�
w _ _, ., �d�A�r Rd
rn --
�
+, �
�" . . Y � ,:. -� r r 2J'�7!
� ;- . �
. � . � , �'
�.. `. �. �//
ti.t :-
_� :� � � ` � �`
F
� �' }rz.. � � �
. i�' � . . � . ��.�.
_ ....-.;s - � .
- _ _ .�i:t:. � '.':
�
�
�:
�
C
j
k�d
S6'�
r``
G
ti�
���
��
��'�3Q� jU:5fl0l1 $I.0�4f
f3�tt�pi�oe (ariginsts�e; mave�}
IJ$$
�
Figure 6: I�CSI�PC? w�bs�te ru�ap 611u�trating the locatian af the praject �r�a which incle�d�s preWiaus�y su�veyed locatio�ns un Sampson County,
Narth �Caroluma.
Pvoject T�•acking No. (Inte�nal Use�
16-09-0043
HISTORIC ARCHITECTURE AND LANDSCAPES
NO HISTORIC PROPERTIES PRESENT OR AFFECTED FORM
This form only pertains to Historic Architecture and Landscapes for this project. It
is not valid for Archaeological Resources. You must consult separately with the
Archaeology Group.
PROJECT INFORMATION
Project No: County: Sat11pSOn
WBS No.: 17BP.3. R.53 Document
Ty e:
Fed. Aid No: Funding: X State Federal
Federal X Yes No Permit NWP 3
Permit s : Type(s):
ProiectDescrintion: Replace Bridge No. 148 on SR 1434 (Huntley School Road) over Mill
Swamp (off-site detour planned, assume no improvements).
SUMMARY OF HISTORIC ARCHITECTURE AND LANDSCAPES REVIEW
❑ There are no National Register-listed or Study Listed properties within the project's area of
potential effects.
❑ There are no properties less than fifty years old which are considered to meet Criteria
Consideration G within the project's area of potential effects.
❑ There are no properties within the project's area of potential effects.
❑ There are properties over fifty years old within the area of potential effects, but they do not
meet the criteria for listing on the National Register.
X There are no historic properties present or affected by this project. (Attach any notes or
documents as needed.)
Descri�tion ofreview activities, results, and conclusions: HPOWeb reviewed on 1 November 2016
and yielded two SS and no NR, SL, DE, or LD properties in the Area of Potential Effects (APE). The APE
for historic architectural resources extends 300 feet from either end of the existing bridge (NW-SE) and
150 feet to either side of the SR 1434 (Huntley School Road) centerline (NE-SW) to encompass all
anticipated construction activities and likely impacts. Sampson County current GIS mapping, aerial
photography, and tax information reveal a mostly wooded APE with several residential and agricultural
resources dating mainly from the 1920s to the 2000s. The circa-1922 Robert Crumpler House (SP0511)
sits approximately 275 feet NE of the SR 1434 (Huntley School Road) centerline, beyond likely project
impact; no other buildings or significant landscape elements appear on the property, which, however,
may be related to mill resources located further to the SE (#1324 Huntley School Road, PIN:
06064162001). The APE intersects a parcel on which an unexceptional, circa-1940 house is located
about 480 feet NW of the existing bridge (#1407 Huntley School Road, PIN: 06065220006). SE of the
bridge, the APE intersects parcels (PINs: 06064220009 and 06�05582003) containing two unexceptional
houses and various outbuildings dating to the first half of the twentieth century, a cemetery located
about 350 feet NE of the SR 1434 (Huntley School Road) centerline, and the above-ground remains of a
mill, dam, mill race or sluiceway, and mill pond, all but part of the race/sluiceway outside the APE
approximately 290 feet and more E of the bridge. The mill resources are recorded in the state
architectural survey as the Rob Crumpler Mill (SP0512); they appear in the state archaeological record as
Matthew's Mill (31SP235). Constructed in 1954, Bridge No. 148 is not eligible for the National Register _
Hisloric Archi(eclure and I.nndscapes NO HISTORIC PROPERT/ES P26SENT OR AFFGC76D form for eL/inor Transporlalion Projecls
as Ounlified rn fhe 2007 Programmalic Agreemext.
Page 1 of 2
according to the NCDOT Historic Bridge Survey as it is not representative of any significant engineering or
aesthetic type. There are no National Register-listed properties in the APE or along the proposed off-site
detour route. Initial screening of the project suggested that additional investigation of the mill resources
might be needed (survey required form, 7 November 2016), but additional design and permit information
received from Division 3 indicates that a finding of "no historic properties affected" will satisfy both
Section 106 and GS 121-12(a) compliance requirements.
Should any aspect of the project design change, please notify
NCDOT Historic Architecture as additional review may be necessary.
SUPPORT DOCUMENTATION �
X Map(s) ❑Previous Survey Info. Photos ❑Correspondence ❑Design Plans
FINDING BY NCDOT ARCHITECTURAL HISTORIAN
Historic chitecture and Landscapes — NO HISTORIC PROPERTIES PRESENT OR AFFECTED
• ��
NCDOT Architectural Historian
Date
Bridge No. 148 Replacement, Sampson County
WBS No. 17BP.3.R.53
Tracking No. 16-09-0043
Historic Archi(eclure and l.andscapes NO HlSTORlC PROPER%7ES PRESEN%'OR AFFECTED form jo�• Minor Trunsporlarion Projecls
as Ounlifie�f in the 2007 Progrmm�mtic Agreement. �
Page 2 of 2
1
N
O ;�
Salemburg
SAMPSON
Project Area
f '
�..t. . .i�.� . .
1_ -
,F
e...
1\
,,�
� �
k�` .
FMA� \ .
�.\ . ,
1
� I
�
�,
S
$ 2
m, � 8
� :
. ; da,IvvJ��� 'n
. ..r ��'� � lO�Pk
m ��C
.9
� „�
I
... . .....cWu.ru- Clinton �
'f Inl� � , ��
�g�- 7�';.fr
$u IA o' '� \. .,
�
Bridge No. 148 Relocation
WBS No. 17BP.3.R.53
Sampson County
Base map: HPOWeb, nts
NCDOT — Historic Architecture
November 2016
Tracking No. 16-09-0043
Bridge No. 148 Replacement Sampson County
Historic Architectural Resources
Base map: current Sampson County GIS, nts
NCDOT — Historic Architecture
November 2016
Tracking No. 16-09-0043