HomeMy WebLinkAbout20081670 Ver 1_Triage Check List_20090113Triage Check List
Date:
To: ? ARO
? FRO
? MRO
Project Name: <;40A,6& 6n
? ?n, ? ; 7?.??1f12 1?-L6
5
DWQ#: D Y-[ (0`7 U
FILE CONY County: Wa-(6_2?
Roger Edwards ? WaRO Kyle Barnes
Ken Averitte ? WiRO Joanne Steenhuis/Chad Coburn
Alan Johnson ? WSRO Sue Homewood
RRO Lauren itherspoon
From: ? Kc'??4 Telephone : (919) 1
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
? Stream length impacted
? Stream determination
? Wetland determination and distance to blue-line surface waters on USFW topo maps
? Minimization/avoidance issues
? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
? Pond fill
? Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
? Check drawings for accuracy
? Is the application consistent with pre-application meetings?
? Cumulative impact concern
Comments:
e14
4.4a i ,n S ? wt S y u L CB1!t $ c?LP?to??