Loading...
HomeMy WebLinkAbout20140762 Ver 3_Nov inspection_ICA_20171109Project Num: 20140762 Project Name: NCDOT- US 221 (R-2915B) County: Watauga Location: NCDOT- US 221 (R-2915B) Latitude: +35° 16' 05" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 11/8/2017 Reason for Inspection Follow-up Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Wetland Inspection Report Version: 3 Status: Issued Project Type: Road/Highway Widening Region: Central Title: Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: ❑ Compliant � Not Compliant Program Areas: Standards/Sediment Question Areas: � Unpermittable Activities Inspection Summary: Longitude: -81 ° 30' 10" Phone: Phone: 336-776-9703 An intense storm event dropped several inches of rain onto the project causing flooding and blowing out many EC measures. Project is currently shut down until repairs can be made. page: 1 Site Number: 20140762 Owner: Thorpe, Gregory Inspection Date: 11/8/2017 Inspection Type: Site Inspection (DOT) Reason for Visit: Follow-up Unpermittable Activities # Note: This section should be completed only if the impact is unpermittable (eg. Sediment, draining wetlands, etc.). Is stream(s) free of unpermittable impacts? Is wetland(s) free of unpermittable impacts? Is open water(s) free of unpermittable impacts? Are other standards being met (turbidity, pH, etc.) in all surface waters onsite? Are surface waters on the site free of illegal discharges? Yes No NA NE ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ Comment: DOT, DEMLR and contractor attended a review of proiect EC measures at several locations throuqhout the prolect includinq waste pits/slopes. An intense storm event from 2 weeks aqo dumped over 5 inches of rain on the proiect. Roadside issued an ICA last week in order to make repairs and remove sediment from JS areas. Additional rains have hampered the effort and much remains to do. The proiect will remain in shut down mode until EC measures and JS areas are cleaned of sediment. A followup inspection will be conducted when repairs are completed. page: 2