From: Chapman, Amy
Sent: Thursday, November 09, 2017 10:13 AM
To: Wanucha, Dave
Subject: RE: R-2915C US 221 project review_follow-up
That's a mess. I agree with what you're doing 100%. Thanks for the heads up.
From: Wanucha, Dave
Sent: Thursday, November 09, 2017 10:07 AM
To: Chapman, Amy <amy.chapman@ncdenr.gov>
Cc: Kichefski, Steven L SAW <Steven.L.Kichefski@usace.army.mil>; Slaughter, Johnathan H<hslaughter@ncdot.gov>; Latham,
Tim <tim.latham@ncdenr.gov>; Hiatt, Todd M<tmhiatt@ncdot.gov>; Johnston, Gregory W<gjohnston@ncdot.gov>
Subject: R-2915C US 221 project review_follow-up
Amy,
Yesterday, we reviewed EC measures and sediment loss cleanup efforts around most of the problem areas per Todd Hiatt's
recent ICA 9(attached). Recent intense storm events caused flooding and many EC measures were blown out including those at
waste pit/slope sites. Given the weather conditions, DOT staff/contractors are doing the best they can, but much more needs to
be done. I agreed with Todd and Tim Latham (NCDMLR) that the project should not resume operations until EC measures are
repaired/installed and JS areas cleaned as directed by Roadside staff, NCDMLR and myself. Greg Johnston, DOT on-site project
engineer representative, agreed. A few pictures are attached (Site 10 inlet picture is Station 346 RT per Todds attached report).
Dave W
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
��u�_.�OV�ii�_u�lh�_�u��d�u�ir.ar�u
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
a������ �������,��:s���������� �� ����� ������ ��`��,� ����:����,�,� �,� ,�������� �� ��`��
�V����� �°��������� ��.����� ��������,� ��W�r ����:� a���.� �� ���,����,���� �� �������� �s�����,�.