Loading...
HomeMy WebLinkAbout20140762 Ver 3_RE R-2915C US 221 project review_follow-up_20171109Wanucha, Dave From: Chapman, Amy Sent: Thursday, November 09, 2017 10:13 AM To: Wanucha, Dave Subject: RE: R-2915C US 221 project review_follow-up That's a mess. I agree with what you're doing 100%. Thanks for the heads up. From: Wanucha, Dave Sent: Thursday, November 09, 2017 10:07 AM To: Chapman, Amy <amy.chapman@ncdenr.gov> Cc: Kichefski, Steven L SAW <Steven.L.Kichefski@usace.army.mil>; Slaughter, Johnathan H<hslaughter@ncdot.gov>; Latham, Tim <tim.latham@ncdenr.gov>; Hiatt, Todd M<tmhiatt@ncdot.gov>; Johnston, Gregory W<gjohnston@ncdot.gov> Subject: R-2915C US 221 project review_follow-up Amy, Yesterday, we reviewed EC measures and sediment loss cleanup efforts around most of the problem areas per Todd Hiatt's recent ICA 9(attached). Recent intense storm events caused flooding and many EC measures were blown out including those at waste pit/slope sites. Given the weather conditions, DOT staff/contractors are doing the best they can, but much more needs to be done. I agreed with Todd and Tim Latham (NCDMLR) that the project should not resume operations until EC measures are repaired/installed and JS areas cleaned as directed by Roadside staff, NCDMLR and myself. Greg Johnston, DOT on-site project engineer representative, agreed. A few pictures are attached (Site 10 inlet picture is Station 346 RT per Todds attached report). Dave W Dave Wanucha Division of Water Resources Transportation Permitting Unit NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile ��u�_.�OV�ii�_u�lh�_�u��d�u�ir.ar�u NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 a������ �������,��:s���������� �� ����� ������ ��`��,� ����:����,�,� �,� ,�������� �� ��`�� �V����� �°��������� ��.����� ��������,� ��W�r ����:� a���.� �� ���,����,���� �� �������� �s�����,�.