Loading...
HomeMy WebLinkAboutAtlantic Coast Pipeline Project - Fayetteville Region - 11/9/2017 11:24:37 AMPMW"`­WW "A upplemental Information Upload Fon Staff Review: Updated ID#: SWG040096 Updated Version: 1 Who needs a copy?* 17 Central Office r Regional Office Select Reviewing Office* Fayetteville Regional Office — 910-433-3300 Central Office Reviewer: Robert Patterson - eads\rdpatterson Select RO Reviewer:* tim.lebounty@ncdenr.gov SUBMITTED PROJECT INFORMATION Existing Project Information: ID# SWG040096 Version: 1 Facility Name: Atlantic Coast Pipeline Project - Fayetteville Region County: Name: Robert Hare Who is subrritting the inforrration? Email Address: robert.p.hare@dominionenergy.com Water Resources ENVIRONMENTAL QUALITY Describe the attachments: SWG04 General Stormwater Management Permit package for the built -upon areas of the Atlantic Coast Pipeline project within the Fayetteville Region. Please upload all files that need to be submitted. ^ACP SWG040096 General Permit Application Fayetteville 10-20 52.15MB 17_v1.pdf Only pdf files are accepted. V By checking the box and signing box below, I certify that • I have given true, accurate, and complete information on this form; • I agree that submission of this Supplemental Information form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Supplemental Information form. Full Name: Tiffini Smith Signature: �� 2OU&