HomeMy WebLinkAbout20171374 Ver 1_Bridge 107 Plan Revisions_20171107Wanucha, Dave
From:
Sent:
To:
Subject:
Attachments:
Braquet, Stephanie
Tuesday, November 07, 2017 10:21 AM
James.C.Lastinger@usace.army.mil; Wanucha, Dave
RE: Stokes Co-Duggins Road
17BP.9.C.9_Wetland_Permit_Package_11.06.2017.pdf
Attach�d pl�as� find th� updat�d plans for �ridg� 107, Duggins Road, in Stok�s County.
Initially w� w�r� r�placing th� 2@ 96°° CMP with a singl� 15,_7,° x 10,_2,° Corrugat�d Aluminum Structural Plat� Pip� Arch with a
h�adwall and �ndwall. That has b��n updat�d to r�placing it with 2@ 108'° Aluminum Structural Plat� with h�adwall and
�ndwall. Th� propos�d structur� low flow barr�l will b� buri�d 1° b�low th� �xisting str�am b�d and th� high flow barr�l will
hav� 1.5° sill to promot� flow through th� low flow barr�l. Int�rior baffl�s ar� also provid�d to promot� s�dim�ntation within
th� barr�ls during low flow �v�nts. Th� int�rior baffl�s will not hav� 6°° low flow notch�s b�caus� w�°r� isolating low flow to a
singl� barr�l, rath�r than a low flow chann�l within a larg�r pip�.
Th� pr�vious impacts vv�r� as follovvse
(ac) Existing Chann�l Impacts P�rman�nt (ft.)
1@ 15,_7,° X 10,_2,° CASPPA 2@ 108" Alum. Struct. Plat�
0.01
�ank
Stabilization
27
��
�
The ccarrer�t imp��ts �re �s follows:
2 @ 108" Alum. Struct.
Plat�
�ank
Stabilization
23
��
�
�
P�rman�nt SW Impacts (ac) T�mp. SW Impacts
Existing Chann�l Impacts T�mp. (ft.)
<
18
�
�
If you n��d furth�r assistanc� or hav� any qu�stions, pl�as� f��l fr�� to contact m�.
Thank you,
Stephanie Braquet
Division 9 Environmental Specialist
North Carolina Department of Transportation
336 747 7800 office
scbraquet(a�ncdot.qov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
1
�
�
�
�
�
a������ �������,��:s���������� �� ����� ������ ��`��,� ����:����,�,� �,� ,�������� �� ��`��
�V����� �°��������� ��.����� ��������,� ��W�r ����:� a���.� �� ���,����,���� �� �������� �s�����,�.
From: Braquet, Stephanie
Sent: Thursday, November 02, 2017 2:28 PM
To: James.C.Lastinger@usace.army.mil; Wanucha, Dave
Subject: Stokes Co-Duggins Road
Good Afternoon,
We have run into some structural issues on the above project and would like to ask that you hold off on issuing a permit for this
one. I will let you know what we propose as soon as I know. I am told it should be no later than the middle of next week. It is
Bridge No. 107 on SR 1696 over Lynn Branch, the WBS Project No. is 17BP.9.C.9.
Thanks you so much for your attention to this matter.
Stephanie Braquet
Division 9 Environmental Specialist
North Carolina Department of Transportation
336 747 7800 office
scbraquet(a�ncdot.qov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
a������ �������,��:s���������� �� ����� ������ ��`��,� ����:����,�,� �,� ,�������� �� ��`��
�V����� �°��������� ��.����� ��������,� ��W�r ����:� a���.� �� ���,����,���� �� �������� �s�����,�.
I!Irr�7ail �;urre,�l�ui�dc,i��:e, C�u ai�d ��ruir7 U•ii� �ci�dcr i� �ul����;�E� �C�u U•ic, I"J,�, I ul�li�; I'�Ee,�;ur;� I...aw ai�d rr�7ay I�c rll��:lu�crl �C�u �C�h•ih�rl I�artle,�,