Loading...
HomeMy WebLinkAbout20171436 Ver 1_Impact Information_20171108 (2)fEi�;h�v�1V North Carolina Department of Transportation �`' StOY1llWcltf"C Highway Stormwater Program � ��. STORMWATER MANAGEMENT PLAN (Version 2.01; Released December 2014) FOR NCDOT PROJECTS WBS Element: 17BP.4.R.81 TIP No.: 320113 County(ies): Edgecombe Page 1 of 1 General Project Information WBS Element: 17BP.4.R.81 TIP Number: 320113 Project Type: Bridge Replacement Date: 7/11/2017 NCDOT Contact: Chad Coggins Contractor I Designer: Wetherill Engineering, Inc. / Harminder Singh, PE Address: Highway Division 4 Address: 1223 Jones Franklin Rd. 509 Ward Blvd, PO BOX 3165 Wilson, NC 27895 Raleigh, NC 27606 Phone: (252)237-6164 Phone: 919-851-8077 Email: ccoqqins(a�ncdot.qov Email: hsinqh(a�wetherillenq.com CitylTown: N/A County(ies): Edgecombe River Basin(s): Tar-Pamlico CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 0.08 Surrounding Land Use: Rural, Wooded, Agricultural Proposed Project Existing Site Project Built-Upon Area (ac.) 0.3 ac. 0.2 ac. Typical Cross Section Description: (2) 11' lanes with grassed shoulders and up to 2.95' shoulders with guardrail. 3' (2) 10' lanes with grassed shoulders shoulders are variable width paved. Annual Avg Daily Traffic (veh/hr/day): Design/Future: 210 Year: 2017 Existing: Year: General Project Narrative: Replace bridge no. 113 over Otter Creek on SR 1102 Otter Crrek Church Rd. Use 1@50', 1@55' 21" Cored Slab. At end bridge, a TB 2GI will outlet outside the buffer zones (Description of Minimization of Water on upstream side of the bridge with 15" RCP with Class B rip rap used to stabilize the outlet. At begin bridge, a TB 2G1 will outlet into a ditch on the downstream side of the Quality Impacts) bridge with 15" RCP with Class B rip rap used to stabilize the outlet. No deck drains will discharge directly into channel. Waterbody Information Surface Water Body (1): Otter Creek NCDWR Stream Index No.: 28-86-(0.3) NCDWR Surface Water Classification for Water Body Primary Classification: Class C None Supplemental Classification: Nutrient Sensitive Waters (NSW) None Other Stream Classification: None Impairments: None Threatened/Endangered Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: Tar-Pamlico Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) � 0 � ^ O(V Y � vi O N m— � LL d •� � V � � O V See Sheet 9-A For Index of Sheets ����� �� ����� �������� �� �Y ����� �� 1L����LJI1 V'V' � 1L � EDGECOMBE COUI�TY LOCATI0111: BRIDGE 11t0.113 OVER OTTER CREEK 01V SR 1102 (OTTER CREEK CHURCH RD.) PERMIT DRAWING SHEET 1 OF 5 TYPE OF WORK: GRADI11lG, DRAINAGE, PAVIIVG � STRUCTURE WETLAND AND SURFACE WATER IMPACTS PERMIT BEGIN NCDOT PROJECT I7BP.4.R.81 —L— POC STA.13 + 20.00 � CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. GRAPHIC SCALES 30 15 0 30 60 PLANS 30 15 0 30 60 PROFILE (HORIZONTAL) DESIG11i DATA ADT 2017 = 210 T = 6 % * V = 55 MPH * (TTST =3% + DUAL =: FUNC CLA55 = RURALLOCAL SUBREGIONAL TIER PROJECT LENGTH LENGTH ROADWAY PROJECT 17BP.4.R.81 = LENGTH STRUCTURE PROJECT 17BP.4.R.81 = TOTAL LENGTH PROJECT 17BP.4.R.81 = 0.058 MI 0.020 MI 0.078 MI - N�y ND NCDOT RO ECT 17BP.4.R.81 —L— POC STA.17+30.00 —L— STA. IS + 78.50 P�epored for: DIVISION OF HIGHWAYS DIVISION FOUR 509 Ward Boulevard, Wilson NC, 27895 ao�z sran�nakn srrcrn�c�ru>vs 1YN/l/Q�I�aH(/6Y�1 t'ILOI[:Cl� UG'SfC.V Li_�" S]'ATE E PROJECT REPERENCE NO. ���� 17BP.4.R.81 17BP.4.R.81 SHE�ET TOTAL SHEETS � , UTIL., fLW CONST. 1223 lones Frankl�ii . lelqh, N.C. 2i nc No.F" TRANSPoRTATiON PLANN/NG/DESIGN - BRiDGE/STRUCTURE DESIGN CNIL/S?E DESIGN - C/5/GPS - CONSTRUCTiON OBSERVATiON BRIDGE #320113 PRELIM. ROADWAY PLA11lS ���Ld�dzv.��� ��,.��v� DO NOT USE FOR CONSTRUCTION VN�L�l�i �PII.�vII��F. IPLAN.� DOCUMENT NOT CONSIDERED FINAL 0o NOT �rSE roR 2/w Ac�o151T1oN UNLESS ALL SIGNATURES COMPLETED HI'DRAULICS ENGINEER ROADWAY DESIGN ENGINEER P.E. ■■■■■■■■u����s�■■■■■rw�����ecR�s�■■ri■■■� ■■■■■■■■►:�■ a�✓�:�■■■■■■ ����u;:��aw �xa■���eer� ■■■■�rn��� �■■■■■■■■■ ���r�LL�■■■ ■■■■ri■ri■■n ■■■■�:1:N:ti3Fi7 �'S.�.II:IJ■■ \■■ ■■■■■f 1■■■■ ■■■■II,■■■fel ■■■■�IIL'fililY�ll ■i�IltiYi■■■\■ ■■■■■I ■■■■■ ■■■II■11■■■r ■■■■■►rra��zv�■w■■■■�■■■■��■■■■■■■�■�■■■� --- -- =====„�-�--.��������J�_ ---- E�fiL•l Ar�rr■ �■rr� I■■■11■ ■■■■■■■■■■ ■■/I■� I� I�■�� Y�r�lLr�■■■■ ■■■■1 i■��� i� ��������■■ ■�.a■� I� I■■■■ :o�o�o�o�i5 �iC\� I►��� �1 ■■ �� I■�I■■■ ■■■■17i1 I■■■■ ■■■■■■■■■■ ■■fY! Is!,i_Q.��' ■!�■� I■�II■■■ ■■■l�hiil I■■■■ r731�1i1'If■3'7Ei11! rii�!�� ii�►�� U� � illC■� I■�II■■■ ■■■LI,►y�1� I■�'iii 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 5 � � � •� � .� � • • I � • i�������������������iii�������������������������������������������������������■ i����������������������������������������������������������������������������■ i����������������������������������������������������������������������������■ i����������������������������������������������������������������������������■ i�����������������������������������������������������������������������������■ � � . � � i�iiiiiiiiiii��iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii i������������������������������������������������������������������������������ � • i����������������������������������������������������������������������������■ � i����������������������������������������������������������������������������■ i�iiiiiiiiii��iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii i���������������������������������������������������������������������������■ i���������������������������������������������������������������������������■ i�u������������������������������������������������������������������������■ i��u����u����������������������������������������������������������������■ i��W�����������������������������������������������������������������■ i�������������������������������������������������������������������■ �������������������������������������������������������������������■ �������������������������������������������������������������������_ .. .� ....................�.......���.....��...�....i....�....i..... . . 75 WETLANDS 75 � BEGIN BRIDGE R� STA. 14 + 73.50 0.040 � �R� R 70 � _ 0.040 _----------- ---- 70 W - --- �� ���00�0�� - � - _ ��N/j W i � � � � 69.99 � � 65 � � �I I � 65 /�/ - � � �---- -------------- � ----------- � 14 + 73.50 � � S5 WETLAN DS S5 R� o.oao o.oao �R� R 70 �w/ 3;1 _ --- ---� 3:� �w� w 70 i � � � � 69.99 •S.� � � 65 � � � 65 � - - � - - - - - - - - - - - - - - / I - - - - - - - - - � I � 14 + 73.48 � � . so WETLANDS 75 75 WETLANDS ,-- o.oao o.oao �R� R 70 _ �R� 3:1 _ __ 3� 7 �WJ w 70 W/ - � � � � � ���� 69.91 � 65 ��� I I �� 65 i I I \ � --------� / I I \-- ------------ � 14 + 50.00 WETLANDS 75 75 0.040 �- o.oao R� �o �R� � � -= � _ _ 3' � �Wj �o _ �.."'J 3�. _ _ — — �- ���^ � � 69.98 �� 65 � �� I - I �� 65 � � � I \ - � � � � � I - - - - - - - - - - - - - - - - - - �o _ ' 14 + 2 5 . 00 _ � ' �' �o —L — 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 14+40 to 16+g0 ROADWAY 0.04 -L- 14+74 to 15+79 BRIDGE < 0.01 TOTALS': < 0.01 0.04 0 0 0 "Rounded totals are sum of actual impacts NOTES: Total Fill in Wetlands= 61 sqft. Interior Bent: HP 14x73 Steel Piles (14" Wide) F�