Loading...
HomeMy WebLinkAboutSWG040096_Additional Information Request_20171108 November 8, 2017 Ms. Leslie Hartz Atlantic Coast Pipeline, LLC c/o Dominion Energy Transmission, Inc. 707 East Main Street Richmond, VA 23219 Subject: Request for Additional Information Stormwater Project No. SWG040096 Atlantic Coast Pipeline Project Cumberland County Dear Ms. Hartz: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on October 27, 2017. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Submit an original signed application form, not a photocopy. 2. The plans provided are not to scale, and not legible. Provide 2 sets of full-sized plans to scale. Additionally, construction plans and details need to be provided for each area with impervious area. (See 15A NCAC 02H .1042 & Sect. A.7. of SWG040000) 3. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: https://edocs.deq.nc.gov/Forms/SW_Project_Submittal Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to December 7, 2017, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number SWG040096 on all correspondence. If you have any questions concerning this matter please feel free to contact me at Robert.Patterson@ncdenr.gov or (919) 807-6369. Sincerely, Robert D. Patterson, PE Environmental Engineer Stormwater Program ec: Tim LaBounty, PE - Fayetteville Regional Office Tiffini Smith - ERM